The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual. Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms, Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.
Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis.
To subscribe to this list, click here.
The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.
To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website.
You may obtain a free download from
Click on the project names below to view the one(s) which interest you.
Construction of a new wetland complex containing 19 basin areas consisting of new water control structures, sheet pile dikes, earthen dikes, farm tile day lighting, excavation, compaction, seeding & mulching on the west side of West Lake Okoboji in Dickinson County as shown in the project documents and as directed by the DNR Inspector.
Rathbun Wildlife Headquarters is located at the Colyn WMA, near the town of Lucas in Lucas County, IA. This project consists of the construction of a one story, pre-engineered S.I.P. (structural insulated panel) building addition with a metal roof and metal siding, approximately
24'-0" x 40'-0", including one heated bay with an overhead door, egress door and a tool storage closet. Project number 13-05-59-01
ESTIMATED QUANTITIES:
4" PVC SDR 23.5
20 L.F.
30" PRECAST CONCRETE SPLASH BLOCKS
1 Each
4" RAT GUARD (AGRI DRAIN RG04, OR EQUAL)
1 Each
1" PE WATER LINE
32 L.F.
YARD HYDRANT (WOODFORD MODEL S-3, OR EQUAL)
1 Each
6" REINFORCED PCC
64 S.Y.
8" FILTER SOCK
80 L.F.
LP TANK (PER LOCAL LP SUPPLIER RECOMMENDATIONS) 5" CONCRETE PAD, 5'-0"X10'-0" AND LP SUPPLY LINE TO BUILDING ADDITION
1 L.S.
GRADING
1 L.S.
PAD GRANULAR BASE
1 L.S.
SEEDING
1 L.S.
CONSTRUCTION STAKING
1 L.S.
BUILDING AND ALL ASSOCIATED EQUIPMENT (ARCHITECTURAL, MECHANICAL & ELECTRICAL)
OTTER CREEK HEADQUARTERS IS SITUATED ALONG THE OTTER CREEK WILDLIFE MANAGEMENT AREA IN TAMA COUNTY, IOWA. THE CURRENT OFFICE / SHOP AREA WAS BUILT IN THE 1960'S AND IS IN NEED OF RENOVATION AND RECONFIGURATION FOR CURRENT STAFF NEEDS. ONE OF THE GARAGE BAYS WILL BE TURNED INTO A CONFERENCE / BREAK AREA, AS WELL AS A NEW SUPERVISOR'S OFFICE AND ADA COMPLIANT RESTROOM. THE CURRENT OFFICE / KITCHENETTE WILL BE RENOVATED INTO A NEW OPEN OFFICE LAYOUT. A NEW MECHANICAL AND ELECTRICAL SERVICE WILL BE INCLUDED IN THIS PACKAGE AS WELL.
ESTIMATED QUANTITIES:
ALL BUILDING RENOVATIONS SHOWN IN PLAN, INCLUDING ARCHITECTURAL, MECHANICAL AND ELECTRICAL CHANGES
1 L.S.
ALTERNATE#1
Alternate
REPLACE ALL WINDOWS AS SHOWN ON PLANS
1 L.S.
ALTERNATE#2
Alternate
INSTALL NEW OVERHEAD RADIANT HEATING SYSTEM IN SHOP 107 AND MOVE AND REINSTALL EXISTING OVERHEAD FORCED AIR FURNACE IN STORAGE 108
To install an 8-foot wide 5-inch thick reinforced PCC recreational trail (3.48 miles in total length: 3.13 miles of actual construction and 0.35 miles of shared roadway) for Green Valley State Park, Union County, Iowa. This project includes, but is not limited to: clearing, demolition, grading, culvert pipes, PCC trail construction, seeding/fertilizing/mulching disturbed areas, signage.
The project consists of construction of a new wastewater pump station and 3-inch diameter force main on the east side of Big Creek Lake as shown in the project documents and as directed by the DNR Inspector.
ESTIMATED QUANTITIES:
Submersible Pump Package
1 L.S.
3" HDPE Force Main
11,975 L.F.
Wet Well Structure
11 L.F.
Flow Meter Structure
7 L.F.
New Air Relief Valves
6 Each
Connect Existing AR Valves to New Force Main
3 Each
Magnetic Flow Meter and Data Logger
1 L.S.
Open Trench Installation of Force Main
3,840 L.F.
Open Trench Installation of 12" HDPE Gravity Sewer
20 L.F.
Trenchless Installation of Force Main
400 L.F.
Installation of 3" Force Main inside Existing 6" Carrier Pipe
The project involves replacing pumps in an existing Lift Station and directional boring a 2500 ft. of 2" HDPE Forcemain and connecting to an existing manhole.
Contact: Bruce Flippin 515-689-8009 bruce.flippin@dnr.iowa.gov
THIS INTERPRETIVE KIOSK WILL ASSIST PARK VISITORS WITH WAY-FINDING, INTERPRETIVE ANALYSIS AND EXPLANATION OF PARK FEATURES. THIS NEW DESIGN IS PART OF THE NEW PARKS DESIGN GUIDE WHICH WILL FIT WITH THE NEW PARK IMAGE FOR IOWA. THESE WILL BE LOCATED AT EB LYONS NATURE CENTER ON THE NEW WOODLAND WALK TRAIL IN DUBUQUE COUNTY, IOWA.
CONTRACTOR SHALL BE PRESENT ON SITE FOR THE DAY OF THE BUILD WITH THEIR MASON (SEPTEMBER 4, 2013 FROM 12:00PM - FINISH). CONTRACTOR SHALL PROVIDE ALL TOOLS, MATERIALS AND EQUIPMENT NECESSARY TO COMPLETE THE PROJECT ON THE "BUILD DAY". THE CONTRACTOR SHALL CONSTRUCT THE KIOSK AND DISASSEBLE PRIOR TO THE "BUILD DAY" TO ENSURE QUALITY CONSTRUCTION.
COORDINATE WITH FIELD INSPECTOR AND ARCHITECT FOR PRECISE LOCATION OF KIOSK
This project involves paving a boat ramp, placement of riprap near the boat ramp, and incidental items as required by the project documents and the IDNR Construction Inspector at Waubonsie State Park in Fremont County, Iowa.
Contact: Mark Johnson 515-250-3713 mark.johnson@dnr.iowa.gov
Project consists of constructing and developing a new public water well, install new water and electrical services from well to Visitors Center and connecting new system to existing inside the Visitors Center. Plug existing well & disconnect existing services.
Project consists of lowering (approximatelly 5') & reshaping 7300 LF of dikes; removing,salvaging & stockpiling 8 steel drain pipes, and removing outflow structure. Disturbed areas will be seeded with a stabilizing crop seeding.
This project consists of construction of a sediment basin in the Stephens State Forest northeast of Unionville, Iowa. Send an email to request plans & specifications.
Contact: Jason Kruse (515) 250-3707 jason.kruse@dnr.iowa.gov