PROJECTS LETTING -  June , 2015

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

JASPER 15-05-50-02 Rock Creek State Park - Boat Ramp Replacement-2015-06-18   Bid Completion detail
MARION 15-05-63-02 Elk Rock State Park - Shoreline Armoring-2015-06-18   Bid Completion detail
MUSCATINE 13-06-70-01 Fairport Fish Hatchery - Seal ponds 23, 25, 26 ,& 30 -2015-06-18   Bid Completion detail
RINGGOLD 15-04-80-01 Mount Ayr Fisheries Management Unit - Walnut Creek Marsh Restoration-2015-06-18   Bid Completion detail
WEBSTER 15-02-94-10 Dolliver Memorial - Park Residence Improvements-2015-06-18   Bid Completion detail
ALLAMAKEE 15-03-03-08 Guttenburg (pools 9-11) Fisheries Management Unit - Noble's Isand Restroom Replacement-2015-07-09   Bid Completion detail
CHICKASAW 15-03-19-01 Geerts WMA - Wetland Restoration-2015-07-09   Bid Completion detail
STORY 16-02-85-01 State Forest Nursery - Tiling of Nursery Beds-2015-07-09   Bid Completion detail
WASHINGTON 16-06-92-02 Lake Darling State Park - Sanitary Sewer Plug Repair-2015-07-10   Bid Completion detail
CLAY 15-01-21-01 Little Sioux Wildlife Area - Repair Low Water Crossing-2015-07-16   Bid Completion detail




MARION -- PROJECT # 15-05-63-02                6/18/2015                Large Project Letting
ELK ROCK STATE PARK
SHORELINE ARMORING
Proposal Guarantee: $10,000
Completion Date: 11/30/2015

   This project consists of grading the slopes and placement of riprap over bedding stone on the shoreline at Elk Rock State Park, and incidental work as required by the Plans and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Bank Shaping     1 L.S.
    Class 'E' Revetment     4,400 Tons
    Bedding Stone     1,500 Tons
    Seeding & Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




RINGGOLD -- PROJECT # 15-04-80-01                6/18/2015                Large Project Letting
MOUNT AYR FISHERIES MANAGEMENT UNIT
WALNUT CREEK MARSH RESTORATION
Proposal Guarantee: $5,000
Completion Date: 11/1/2015

   This project consist of excavating a channel along the existing dam to increase the maximum depth of this waterbody to historical conditions and also excavating a channel from the boat ramp to the main lake to provide easier access for boat traffic.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Dike Channel Excavation     16,074 C.Y.
    Boat Ramp Channel Excavation     2,113 C.Y.
    Shoreline deepening     300 L.F.
    Class 'E' Revetment     330 Tons
    Engineering Fabric     420 S.Y.
    Seeding & Site restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WEBSTER -- PROJECT # 15-02-94-10                6/18/2015                Large Project Letting
DOLLIVER MEMORIAL
PARK RESIDENCE IMPROVEMENTS
Proposal Guarantee: $2,500
Completion Date: 10/30/2015

   Park Residence at Dolliver has old log siding, windows, stairs and plumbing. This project will replace all plumbing (sanitary, water & gas) and will replace all siding and insulation, windows, stairs, and some electrical work. The bathroom remodel is an alternate. 15-02-94-10 Dolliver SP - Park Residence Remodel.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    DEMOLITION     1 L.S.
    ELECTRICAL     1 L.S.
    PLUMBING (SANITARY, WATER & GAS)     1 L.S.
    ARCHITECTURAL (SIDING, SHEATHING, INSULATION, WINDOWS, STAIRS, DOORS, MISCELLANEOUS ITEMS)     1 L.S.
Alternate
    BATHROOM REMODEL     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WASHINGTON -- PROJECT # 16-06-92-02                7/10/2015                Large Project Letting
LAKE DARLING STATE PARK
SANITARY SEWER PLUG REPAIR
Proposal Guarantee: $0
Completion Date: 7/19/2015

   This project is an emergency repair to fix a plugged sanitary sewer line. Work includes removal of an 8"x8"x8" sanitary sewer ductile iron tee with an approximate 6' deep manhole and pour a standard PCC fillet. Removal of the top of an 8"x8"x8" ductile iron tee within an approximate 14' deep manhole (by confined entry). Includes all necessary traffic control and confined entry requirements. The State will provide all necessary jetting, videoing, and pumping of sanitary sewer by a separate contractor.

ESTIMATED QUANTITIES:
    Sanitary Sewer Repair     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JASPER -- PROJECT # 15-05-50-02                6/18/2015                Small Project Letting
ROCK CREEK STATE PARK
BOAT RAMP REPLACEMENT
Proposal Guarantee: $0
Completion Date: 11/20/2015

   This project consists of removal of the existing boat ramp and replacement with a concrete boat ramp. Other items of work include articulated concrete block for propeller washout protection and riprap for shoreline protection. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




MUSCATINE -- PROJECT # 13-06-70-01                6/18/2015                Small Project Letting
FAIRPORT FISH HATCHERY
SEAL PONDS 23, 25, 26 ,& 30
Proposal Guarantee:
Completion Date: 8/14/2015

   Repair a leak in Pond No. 43 by excavating, possibly importing clay earth, and recompacting berm. Placement of a bentonite blanket along entire southeast berm/pond edge.

Contact:
Michael Dufoe

Michael.dufoe@dnr.iowa.gov




ALLAMAKEE -- PROJECT # 15-03-03-08                7/9/2015                Small Project Letting
GUTTENBURG (POOLS 9-11) FISHERIES MANAGEMENT UNIT
NOBLE'S ISAND RESTROOM REPLACEMENT
Proposal Guarantee: $0
Completion Date: 10/9/2015

   Project consists of removal & disposal of existing pit latrine and associated sidewalk and install a new precast concrete pit vault latrine and new PCC sidewalk at Noble's Island Boat Ramp Area, Allamakee Co., IA. Plans may be requested by emailing melvin.pacovsky@dnr.iowa.gov your company address & phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




CHICKASAW -- PROJECT # 15-03-19-01                7/9/2015                Small Project Letting
GEERTS WMA
WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 10/30/2015

   Project consists of excavation of low areas to enhance wetlands, installation of a small water control structure, and plug existing oxbows, on Geerts WMA, Chickasaw Co.,IA. Plans maybe requested by emailing your company address & phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




STORY -- PROJECT # 16-02-85-01                7/9/2015                Small Project Letting
STATE FOREST NURSERY
TILING OF NURSERY BEDS
Proposal Guarantee: $0
Completion Date: 8/15/2015

   This project entails the installation of approximately 15,000' of 4" drain tile (perforated), 1,000' of 6" drain tile (perforated or solid as needed) and approx. 50 new junctions connecting the 4" to 6" tile all at the State Forest Nursery in Ames, IA.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




CLAY -- PROJECT # 15-01-21-01                7/16/2015                Small Project Letting
LITTLE SIOUX WILDLIFE AREA
REPAIR LOW WATER CROSSING
Proposal Guarantee: $0
Completion Date: 9/4/2015

   This project is designed to repair a low water crossing that was damaged in a flood event. The scope of work involves removing the granular material from the existing crossing and installing new granular material with the proper cross section and gradation. The work is located within the Little Sioux Wildlife Area just north of Gillett Grove, in Clay County, Iowa.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov