The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual. Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms, Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.
Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis.
To subscribe to this list, click here.
The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.
To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website.
You may obtain a free download from
Click on the project names below to view the one(s) which interest you.
This project consists of the placement of riprap revetment along the lake shoreline in several locations, surfacing of several trails and one jetty and incidental work as required by the Plans and/or the DNR Construction Inspector.
This project consists of construction of earth dike, placement of water control structure, shallow
water excavation, spillway construction pipe removal, and any other activities required therein.
This project consists of the excavation of wetlands within the Copeland Bend WMA, and incidental work as required by the Plans and/or the DNR Construction Inspector.
This project consists of construction and paving of access roadways, parking areas, and other related work as required by the Plans and/or the DNR Construction Inspector and as described in the Specifications for Lewis and Clark State Park.
This project consists of grading and granular surfacing for camp pads and installation of sewer and water lines, electrical hookups, and other related work as required by the Drawings and/or the DNR Construction Inspector and as described in the Project Manual for Union Grove State Park.
ESTIMATED QUANTITIES:
MACADAM STONE BASE MATERIAL(5" DEPTH)
311 Tons
ENGINEERING FABRIC
1,234 S.Y.
EARTHWORK(CAMP PADS/CXT BASE-CLASS 10 EXCAVATION)
345 C.Y.
GRANULAR SURFACING, CRUSHED LIMESTONE 1/2"-3/8" WITH FINES (2" DEPTH)
123 Tons
CLASS "A" CRUSHED STONE BASE MATERIAL
128 Tons
SHOWER STUB-UPS & CONNECTION AFTER BUILDING PLACEMENT
1 L.S.
PCC-C4 MIX. 6" THICKNESS (SIDEWALK & PARKING)
139 S.Y.
2" PVC SDR 21 WATER PIPE
1,476 L.F.
1" PE WATER SERVICE TUBING
340 L.F.
TRACER WIRE STATION
1 L.S.
#12 SOLID TRACER WIRE
1 L.S.
STOP AND WASTE VALVE
1 Each
DISINFECTION
1 L.S.
DETECTABLE WARNING TAPE 3" (WATER)
1,476 L.F.
2" BALL VALVE
5 Each
1" CORPORATION STOP
12 Each
1" CURB STOP WITH BOX
14 Each
YARD HYDRANT
14 Each
2" CAP AND BLOCK
1 Each
DISCONNECT & CAP EXISTING WATER TO CAMPGROUND
1 L.S.
2" TEES
3 Each
4" DIAMETER PVC SDR 35 SEWER PIPE
662 L.F.
6" DIAMETER PVC SDR 35 SEWER PIPE
702 L.F.
MANHOLE
4 Each
DETECTABLE WARNING TAPE 3" (SEWER)
1,364 L.F.
RV TO SEWER HOOKUP
9 Each
80' SEPTIC INFILTRATION CHAMBERS
5 Each
2000 GAL. CONCRETE SEPTIC TANK
1 Each
CONNECTION TO RV DUMP STATION
1 Each
6" X 4" SANITARY SEWER WYES
9 Each
PUMP EXISTING DUMP STATION
1 L.S.
#2 AWG CABLE, TYPE USE
656 L.F.
#4 AWG CABLE, TYPE USE
767 L.F.
#8 AWG CABLE, TYPE USE
116 L.F.
3/0 AWG CABLE, TYPE USE
1,323 L.F.
350 MCL CABLE, TYPE USE
1,995 L.F.
TRENCH- SINGLE CIRCUIT SECONDARY
1,100 L.F.
800 AMP PANEL
1 Each
DETECTABLE WARNING TAPE 3" (ELECTRICAL)
1,100 L.F.
3" SCHEDULE 80 PVC ROADWAY CROSSING CONDUIT
100 L.F.
50 AMP CAMPSITE POST
8 Each
CONNECT TO EXISTING ELECTRIC ( PIT LATRINES & HOST SITE)
3 Each
CT CABINET, METER SOCKET, AND CONNECTION
1 L.S.
SHELTER DEMO
1 L.S.
ROAD CROSSING AND REPAIR. C4 CONCRETE. 6" THICKNESS
1 L.S.
REMOVE EXISTING HYDRANTS
6 Each
GRANULAR SURFACING CLASS "A" 6" DEPTH (CABIN ROAD)
136 Tons
REMOVE AND RESET CAMP POSTS
5 Each
REMOVE AND RESET FIRE RINGS
6 Each
SEED, FERTILIZE, AND MULCH DISTURBED AREAS (URBAN MIX)
This project involves the creation of 3 wetland pool areas through use of shallow excavation. Work under this project includes excavation and spoil seeding.
This Project consists of the disconnection and
abandonment of the existing house sewer, construction
of new sewer from the house and connection to existing
sewer main, connection of shop sewer to proposed
sewer, demolition of existing house patio,
reconstruction of house patio after sewer line is in
place, and any incidental work as required by the plans
and/or DNR construction inspector.
Please
This project consists of preparing an 18" thick crushed rock pad for a Precast CXT Building, stub out plumbing underneath CXT Building and connecting utilities after building placement.
This project consists of preparing two 18" thick crushed rock pads for Precast CXT Buildings, stub out plumbing underneath CXT Buildings and connecting utilities after building placement, and tree removal.
This project involves improvements to an existing water control structure. Work under this project includes a connection to the existing structure, installation of PE and CMP piping, and installation of a new water control structure and inlet pipe.
This project consists of the removal, disposal, and installation of 9 aluminum 4'x6' windows and any other specifications as per the plans or DNR construction inspector.
This project consists of demolition of an old pit latrine and sidewalk, installation of a septic system which includes two septic tanks, a duplex lift station and a lateral infiltration field, electrical connections, pouring a new 4" PCC Sidewalk, and seeding, fertilizing and mulching.
Utilities for Shower Bldg. ~480 L.F. sewer line, manhole, lift station, ~595 L.F. water line, water hydrant, earthwork, electric, utilitiy hookups to bldg., PCC sidewalk