PROJECTS LETTING -  June , 2010

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

ADAIR 11-04-01-01 Meadow Lake Fish and Wildlife Area - Sediment Pond Construction-2010-06-17   Bid Completion detail
APPANOOSE 10-05-04-07 Honey Creek State Park - FEMA Trail-Road Rock Replacement-2010-06-17   Bid Completion detail
APPANOOSE 11-05-04-01 Sedan Bottoms WMA - Brown - Wetland Restoration-2010-06-17   Bid Completion detail
EMMET 10-01-32-02 Grass Lake WMA - shallow water excavations-2010-06-17   Bid Completion detail
FREMONT 11-04-36-01 Copeland Bend WMA - Wetland excavation project-2010-06-17   Bid Completion detail
MONONA 04-04-67-03 Lewis & Clark State Park - Visitor Center Parking Lot-2010-06-17   Bid Completion detail
MONONA 04-04-67-03 Lewis & Clark State Park - Visitor Center Parking Lot (Negotiated)-2010-06-17   Bid Completion detail
POLK 11-02-77-05 Big Creek State Park - Televise Sewer Lines-2010-06-17   Bid Completion detail
TAMA 10-05-86-05 Union Grove State Park - Utlilites for shower, cabin, campground-2010-06-17   Bid Completion detail
JOHNSON 10-06-52-07 Lake Macbride Central Shop - Septic line upgrade-2010-06-24   Bid Completion detail
JOHNSON 10-06-52-01 Lake Macbride State Park - CXT Pad and Plumbing-2010-06-24   Bid Completion detail
MUSCATINE 09-06-70-11 wildcat den state park - Foundations for CXT buildings-2010-06-24   Bid Completion detail
DAVIS 10-05-26-02 Lake Wapello State Park - Roof replacement, repair lodge-2010-07-01   Bid Completion detail
KOSSUTH 10-01-55-02 Seneca WMA-Struecker Tract - install water control structure-2010-07-01   Bid Completion detail
MONTGOMERY 10-04-69-03 Viking Lake State Park - New waterlines for camp Aldersg-2010-07-01   Bid Completion detail
MUSCATINE 08-06-70-08 Fairport Fish Hatchery - replace shop/lab/other windows(re-bid)-2010-07-01   Bid Completion detail
WEBSTER 10-02-94-05 Dolliver State Park - Repair Flood Damages-2010-07-01   Bid Completion detail
JOHNSON 10-06-52-09 Lake Macbride State Park - CXT Wastewater System -2010-07-15   Bid Completion detail
WEBSTER 10-02-94-01 Brushy Creek SRA - Utilities for - CXTShower BLD-2010-07-15   Bid Completion detail




APPANOOSE -- PROJECT # 10-05-04-07                6/17/2010                Large Project Letting
HONEY CREEK STATE PARK
FEMA TRAIL-ROAD ROCK REPLACEMENT
Proposal Guarantee: $5,000
Completion Date: 10/1/2010

   This project consists of the placement of riprap revetment along the lake shoreline in several locations, surfacing of several trails and one jetty and incidental work as required by the Plans and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Revetment, Class "D" Riprap     3,222 Tons
    Surfacing, Class "A" Cr. Stone     336 Tons
    Engineering Fabric     4,676 S.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 11-05-04-01                6/17/2010                Large Project Letting
SEDAN BOTTOMS WMA - BROWN
WETLAND RESTORATION
Proposal Guarantee: $5,000
Completion Date: 9/30/2010

   This project consists of construction of earth dike, placement of water control structure, shallow water excavation, spillway construction pipe removal, and any other activities required therein.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Site Preparation     1 L.S.
    Removal of Culvert     1 Each
    Removal of Tile     570 L.F.
    Excavation     5,050 C.Y.
    Shallow Water Excavation     41,818 C.Y.
    Earthfill     20,667 C.Y.
    Principal Spillway, 84-in. SMP Riser, 48-in. SMP Conduit, Trash Rack, Anti-Seep     1 L.S.
    Macadam Stone Base     30 Tons
    Seeding, Islands     5 Acres
    Seeding & Mulch - Levee, Outlet Chute, Aux Spillway     10 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




FREMONT -- PROJECT # 11-04-36-01                6/17/2010                Large Project Letting
COPELAND BEND WMA
WETLAND EXCAVATION PROJECT
Proposal Guarantee: $10,000
Completion Date: 11/1/2010

   This project consists of the excavation of wetlands within the Copeland Bend WMA, and incidental work as required by the Plans and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Shallow Water Excavation     139,928 C.Y.
    Construction Survey     1 L.S.
    Seeding, Fertilizing & Mulching     5 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MONONA -- PROJECT # 04-04-67-03                6/17/2010                Large Project Letting
LEWIS & CLARK STATE PARK
VISITOR CENTER PARKING LOT
Proposal Guarantee: $10,000
Completion Date: 10/15/2010

   This project consists of construction and paving of access roadways, parking areas, and other related work as required by the Plans and/or the DNR Construction Inspector and as described in the Specifications for Lewis and Clark State Park.

ESTIMATED QUANTITIES:
    Clearing and Grubbing     493 Units
    Special Backfill     2,190 Tons
    Excavation, Class 13 Roadway & Borrow     813 C.Y.
    Granular Shoulders, Type A     74 Tons
    Shoulder Construction, Earth     9.35 STA.
    Std/Slip Form PCC Pavement, Class "C", 6"     617 S.Y.
    HMA Base, 1/2" Mix, 100,000 ESALS     2,087 Tons
    Engineering Fabric     6,705 S.Y.
    Erosion Stone     4 Tons
    Sidewalk, PC Concrete, 6"     52 S.Y.
    Curb, Special, As Per Plan     782 L.F.
    Painted Pavement Markings, Waterborne or Solvent     1,680 L.F.
    Painted Symbols & Legends, Waterborne or Solvent     6 Each
    Traffic Control     1 L.S.
    Parking Bumpers, Pre-Cast Concrete, 8'     8 Each
    Rain Garden Construction     2,650 C.Y.
    Grated Stormwater Trench     124 L.F.
    PVC Piping, 6" Dia.     221 L.F.
    PC Concrete Samples     1 L.S.
    Culvert, CMP, 18" Dia.     40 L.F.
    Apron, Metal, 18" Dia.     2 Each
    Removal of Pavement     538 S.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




TAMA -- PROJECT # 10-05-86-05                6/17/2010                Large Project Letting
UNION GROVE STATE PARK
UTLILITES FOR SHOWER, CABIN, CAMPGROUND
Proposal Guarantee: $5,000
Completion Date: 12/1/2010

   This project consists of grading and granular surfacing for camp pads and installation of sewer and water lines, electrical hookups, and other related work as required by the Drawings and/or the DNR Construction Inspector and as described in the Project Manual for Union Grove State Park.

ESTIMATED QUANTITIES:
    MACADAM STONE BASE MATERIAL(5" DEPTH)     311 Tons
    ENGINEERING FABRIC     1,234 S.Y.
    EARTHWORK(CAMP PADS/CXT BASE-CLASS 10 EXCAVATION)     345 C.Y.
    GRANULAR SURFACING, CRUSHED LIMESTONE 1/2"-3/8" WITH FINES (2" DEPTH)     123 Tons
    CLASS "A" CRUSHED STONE BASE MATERIAL     128 Tons
    SHOWER STUB-UPS & CONNECTION AFTER BUILDING PLACEMENT     1 L.S.
    PCC-C4 MIX. 6" THICKNESS (SIDEWALK & PARKING)     139 S.Y.
    2" PVC SDR 21 WATER PIPE     1,476 L.F.
    1" PE WATER SERVICE TUBING     340 L.F.
    TRACER WIRE STATION     1 L.S.
    #12 SOLID TRACER WIRE     1 L.S.
    STOP AND WASTE VALVE     1 Each
    DISINFECTION     1 L.S.
    DETECTABLE WARNING TAPE 3" (WATER)     1,476 L.F.
    2" BALL VALVE     5 Each
    1" CORPORATION STOP     12 Each
    1" CURB STOP WITH BOX     14 Each
    YARD HYDRANT     14 Each
    2" CAP AND BLOCK     1 Each
    DISCONNECT & CAP EXISTING WATER TO CAMPGROUND     1 L.S.
    2" TEES     3 Each
    4" DIAMETER PVC SDR 35 SEWER PIPE     662 L.F.
    6" DIAMETER PVC SDR 35 SEWER PIPE     702 L.F.
    MANHOLE     4 Each
    DETECTABLE WARNING TAPE 3" (SEWER)     1,364 L.F.
    RV TO SEWER HOOKUP     9 Each
    80' SEPTIC INFILTRATION CHAMBERS     5 Each
    2000 GAL. CONCRETE SEPTIC TANK     1 Each
    CONNECTION TO RV DUMP STATION     1 Each
    6" X 4" SANITARY SEWER WYES     9 Each
    PUMP EXISTING DUMP STATION     1 L.S.
    #2 AWG CABLE, TYPE USE     656 L.F.
    #4 AWG CABLE, TYPE USE     767 L.F.
    #8 AWG CABLE, TYPE USE     116 L.F.
    3/0 AWG CABLE, TYPE USE     1,323 L.F.
    350 MCL CABLE, TYPE USE     1,995 L.F.
    TRENCH- SINGLE CIRCUIT SECONDARY     1,100 L.F.
    800 AMP PANEL     1 Each
    DETECTABLE WARNING TAPE 3" (ELECTRICAL)     1,100 L.F.
    3" SCHEDULE 80 PVC ROADWAY CROSSING CONDUIT     100 L.F.
    50 AMP CAMPSITE POST     8 Each
    CONNECT TO EXISTING ELECTRIC ( PIT LATRINES & HOST SITE)     3 Each
    CT CABINET, METER SOCKET, AND CONNECTION     1 L.S.
    SHELTER DEMO     1 L.S.
    ROAD CROSSING AND REPAIR. C4 CONCRETE. 6" THICKNESS     1 L.S.
    REMOVE EXISTING HYDRANTS     6 Each
    GRANULAR SURFACING CLASS "A" 6" DEPTH (CABIN ROAD)     136 Tons
    REMOVE AND RESET CAMP POSTS     5 Each
    REMOVE AND RESET FIRE RINGS     6 Each
    SEED, FERTILIZE, AND MULCH DISTURBED AREAS (URBAN MIX)     1 L.S.
    REMOVE 10" PINE AT SHOWER LOCATION     1 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




ADAIR -- PROJECT # 11-04-01-01                6/17/2010                Small Project Letting
MEADOW LAKE FISH AND WILDLIFE AREA
SEDIMENT POND CONSTRUCTION
Proposal Guarantee:
Completion Date: 9/15/2010

   This pond has 17,290 CY of earth fill in place and a 36" smooth metal pipe stop log riser structure with a 16" smooth metal pipe inlet and outlet.

Contact:
Mark Johnson
515-250-3713
[email protected]




EMMET -- PROJECT # 10-01-32-02                6/17/2010                Small Project Letting
GRASS LAKE WMA
SHALLOW WATER EXCAVATIONS
Proposal Guarantee: $0
Completion Date: 8/16/2010

   This project involves the creation of 3 wetland pool areas through use of shallow excavation. Work under this project includes excavation and spoil seeding.

Contact:
Jeff Felts
515-250-3712
[email protected]




POLK -- PROJECT # 11-02-77-05                6/17/2010                Small Project Letting
BIG CREEK STATE PARK
TELEVISE SEWER LINES
Proposal Guarantee:
Completion Date: 8/20/2010

   Sewer Televising - 6" to 8" Pipe ~ 7236 Lin.Ft. Heavy Cleaning ~ 1800 Lin.Ft. Root Cutting ~ 750 Lin.Ft.

Contact:
Jason Kruse
(515) 250-3707
[email protected]




JOHNSON -- PROJECT # 10-06-52-07                6/24/2010                Small Project Letting
LAKE MACBRIDE CENTRAL SHOP
SEPTIC LINE UPGRADE
Proposal Guarantee:
Completion Date: 7/30/2010

   This Project consists of the disconnection and abandonment of the existing house sewer, construction of new sewer from the house and connection to existing sewer main, connection of shop sewer to proposed sewer, demolition of existing house patio, reconstruction of house patio after sewer line is in place, and any incidental work as required by the plans and/or DNR construction inspector. Please

Contact:
Heath Delzell
(515) 979-0104
[email protected]




JOHNSON -- PROJECT # 10-06-52-01                6/24/2010                Small Project Letting
LAKE MACBRIDE STATE PARK
CXT PAD AND PLUMBING
Proposal Guarantee:
Completion Date: 8/31/2010

   This project consists of preparing an 18" thick crushed rock pad for a Precast CXT Building, stub out plumbing underneath CXT Building and connecting utilities after building placement.

Contact:
Heath Delzell
(515) 979-0104
[email protected]




MUSCATINE -- PROJECT # 09-06-70-11                6/24/2010                Small Project Letting
WILDCAT DEN STATE PARK
FOUNDATIONS FOR CXT BUILDINGS
Proposal Guarantee:
Completion Date: 8/31/2010

   This project consists of preparing two 18" thick crushed rock pads for Precast CXT Buildings, stub out plumbing underneath CXT Buildings and connecting utilities after building placement, and tree removal.

Contact:
David Heer
(515) 250-3719
[email protected]




DAVIS -- PROJECT # 10-05-26-02                7/1/2010                Small Project Letting
LAKE WAPELLO STATE PARK
ROOF REPLACEMENT, REPAIR LODGE
Proposal Guarantee:
Completion Date: 9/15/2010

   This project consists of the replacement of the roof on the lodge at Lake Wapello State Park.

Contact:
Jason Kruse
(515) 250-3707
[email protected]




KOSSUTH -- PROJECT # 10-01-55-02                7/1/2010                Small Project Letting
SENECA WMA-STRUECKER TRACT
INSTALL WATER CONTROL STRUCTURE
Proposal Guarantee: $0
Completion Date: 9/3/2010

   This project involves improvements to an existing water control structure. Work under this project includes a connection to the existing structure, installation of PE and CMP piping, and installation of a new water control structure and inlet pipe.

Contact:
Jeff Felts
515-250-3712
[email protected]




MONTGOMERY -- PROJECT # 10-04-69-03                7/1/2010                Small Project Letting
VIKING LAKE STATE PARK
NEW WATERLINES FOR CAMP ALDERSG
Proposal Guarantee:
Completion Date: 9/15/2010

   Replace 645 feet of 2" water main, two yard hydrants and valves.

Contact:
Mark Johnson
515-250-3713
[email protected]




MUSCATINE -- PROJECT # 08-06-70-08                7/1/2010                Small Project Letting
FAIRPORT FISH HATCHERY
REPLACE SHOP/LAB/OTHER WINDOWS(RE-BID)
Proposal Guarantee:
Completion Date: 9/1/2010

   This project consists of the removal, disposal, and installation of 9 aluminum 4'x6' windows and any other specifications as per the plans or DNR construction inspector.

Contact:
Heath Delzell
(515) 979-0104
[email protected]




WEBSTER -- PROJECT # 10-02-94-05                7/1/2010                Small Project Letting
DOLLIVER STATE PARK
REPAIR FLOOD DAMAGES
Proposal Guarantee:
Completion Date:

   Furnish and place Class "A" in parking roadways and Riprap creek bank and parking area... ~ 416 Ton Class "A" & ~ 170 Ton Class "D" Riprap.

Contact:
Don Labate
515-250-3714
[email protected]




JOHNSON -- PROJECT # 10-06-52-09                7/15/2010                Small Project Letting
LAKE MACBRIDE STATE PARK
CXT WASTEWATER SYSTEM
Proposal Guarantee:
Completion Date: 11/15/2010

   This project consists of demolition of an old pit latrine and sidewalk, installation of a septic system which includes two septic tanks, a duplex lift station and a lateral infiltration field, electrical connections, pouring a new 4" PCC Sidewalk, and seeding, fertilizing and mulching.

Contact:
Heath Delzell
(515) 979-0104
[email protected]




WEBSTER -- PROJECT # 10-02-94-01                7/15/2010                Small Project Letting
BRUSHY CREEK SRA
UTILITIES FOR - CXTSHOWER BLD
Proposal Guarantee:
Completion Date:

   Utilities for Shower Bldg. ~480 L.F. sewer line, manhole, lift station, ~595 L.F. water line, water hydrant, earthwork, electric, utilitiy hookups to bldg., PCC sidewalk

Contact:
Don Labate
515-250-3714
[email protected]