The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual. Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms, Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.
Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis.
To subscribe to this list, click here.
The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.
To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website.
You may obtain a free download from
Click on the project names below to view the one(s) which interest you.
THIS PROJECT INVOLVES CONSTRUCTION OF A PRECAST CONCRETE RESTROOM BUILDING ASSOCIATED UTILITIES, SIDEWALKS, HANDICAP PARKING AND OTHER INCIDENTAL WORK AS REQUIRED BY D.N.R CONSTRUCTION INSPECTOR IN DICKINSON COUNTY, IOWA.
This project consists of PCC white topping (5-inch), PCC removal and installation, HMA removal, culvert removal and installation, installation of box and area inlets, placement of riprap and erosion stone, seeding/fertilizing and the installation of erosion control measures.
ESTIMATED QUANTITIES:
2102 - SPECIAL BACKFILL (SUBBASE)
720 Tons
2102 - EMBANKMENT-IN-PLACE, CONTRACTOR FURNISHED
843 C.Y.
2102 - EXCAVATION, CLASS 10, ROADWAY AND BORROW
218 C.Y.
2301 - STD/S-F PCC PAV'T, CL C CL 3, 6"
809 S.Y.
2310 PORTLAND CEMENT CONCRETE OVERLAY, FURNISH ONLY
2,084 C.Y.
2310 PORTLAND CEMENT CONCRETE OVERLAY, PLACEMENT ONLY (WHITE TOPPING)
This project involves the removal of existing roadways, parking lots, two shelters and restroom and constructing new Portland Cement Concrete (PCC) roadways, PCC camp pads, PCC parking lot, electrical, water and sanitary sewer services, new shower/bathroom building, and vegetative barriers at Lake Manawa State Park in Pottawattamie County, Iowa.
ESTIMATED QUANTITIES:
Clearing and Grubbing
1 L.S.
Removal of Exisitng Pavement and Base
7,230 STA.-CY
Demolition
1 L.S.
Sanitary Sewer, 4" (PVC SDR 35)
3,083 L.F.
Sanitary Sewer, 8" (PVC SDR 35)
1,888 L.F.
RV Sewer Connection
41 Each
Sanitary Manhole, SW-301
11 Each
Sanitary Manhole, SW-303
1 Each
Water Service Line, 1" HDPE
18,223 L.F.
Water Service Line, 2" HDPE
90 L.F.
Water Main, 2" HDPE
540 L.F.
Water Main, 3" HDPE
1,350 L.F.
Hydrant
43 Each
Painted Pavement Mark, High-Build Waterborne
1 L.S.
Painted Symbol+Legend, High-Build Waterborne
20 Each
Drain Down Pit
3 Each
Electrical
1 L.S.
Campsites Pavement, 6" PCC
6,170 S.Y.
Modified Subbase
6,200 C.Y.
Subdrain, Longitudinal, (Shoulder), 4"
8,343 L.F.
Subdrain Outlet, DR-306
46 Each
Roadway Pavement, 7" PCC
5,900 S.Y.
Parking Lot Pavement, 7" PCC
3,310 S.Y.
Curb and Gutter, PCC, 2.5'
95 L.F.
Reinforced Concrete Pipe, 24"
94 L.F.
Reinforced Concrete Pipe Apron, 24"
4 Each
Precast Concrete Parking Wheel Stops
2 Each
Sidewalk, 6" PCC
120 S.Y.
Trail, 6" PCC
1,160 S.Y.
ADA Campfire Ring with Pad
41 Each
Picnic Table, 6' Handicap Accessible
41 Each
Wood Fence, 8'
573 L.F.
Excavation, Class 10, Roadway and Borrow
10,000 C.Y.
Seeding, Fertilizing, and Mulching
16.68 Acres
Filter Sock, 8"
14,280 L.F.
2 Stall Modern Bathroom/Shower (Wolverine)
1 Each
Check-In Station
1 L.S.
Vegetative Barrier
1,259 L.F.
Security Gate
1 L.S.
Signing
60 Each
Revetment, Class E
852 Tons
Detectable Warning Panel
246 S.F.
Furnish and Place 3' Boulders (Minimum 2.5 Ton Each)
This project consists of building a crossing over a ditch to be used by farm equipment. There will be two 30"x60' SMP culverts. They will be covered with 407 CY of earth fill.
Send an email to request plans.
Contact: Jason Kruse (515) 250-3707 jason.kruse@dnr.iowa.gov
This project is designed to repair two wetland dikes and one wetland water control structure on the Tuttle Lake Wildlife Management Area (WMA), Emmet County, Iowa. Work under this project includes removal and replacement of dike fill to repair rodent damage, and borrow fill to repair dike breach areas and level dikes back to the original design elevation. Also included under this contract is the removal and replacement of a damaged section of 36" aluminum pipe on and existing water control structure (WCS) and installation of welded wire mesh for rodent proofing.
Contact: Jeff Felts 515-250-3712 Jeff.Felts@dnr.iowa.gov
The work entails the replacement of four overhead doors and tracks, the replacement of a steel man door, repair of the bottom seal and threshold of a man door and an overhead door and repair of a hole in the siding at a storage building at the Boone Wildlife Research Station in Ledges State Park in Boone County and as directed by the DNR Engineer.
Contact: Don Labate 515-250-3714 Don.Labate@dnr.iowa.gov
The work entails the replacement of four overhead doors and tracks, the replacement of a steel man door, repair of the bottom seal and threshold of a man door and an overhead door and repair of a hole in the siding at a storage building at the Boone Wildlife Research Station in Ledges State Park in Boone County and as directed by the DNR Engineer.
Contact: Don Labate 515-250-3714 Don.Labate@dnr.iowa.gov
This project is designed to enhance an existing wetland pool on the Norland Tract of the East Swan Wildlife Management Area (WMA), in Emmet County, Iowa. Work under this project includes earthfill (dike construction), excavation (channel), tile investigation, tile breaks, tile installation (pipe and intake), and seeding.
Contact: Jeff Felts 515-250-3712 Jeff.Felts@dnr.iowa.gov
This project includes the placement of Class E riprap along the riverbank, placing erosion stone and capping with Class A rock adjacent to the riverbank, placing Class A in the parking and driveway areas and general flood cleanup of silt at the boat ramp at Dolliver Memorial State Park in Webster County.
Contact: Don Labate 515-250-3714 Don.Labate@dnr.iowa.gov
This project is for construction of two boat slips at Lake MacBride State Park consisting of approximately 94 LF of sheet piling, 120 tons of revetment, 112 SY of sidewalk, and other associated items.
ADDENDUM #1 HAS BEEN ISSUED 6/12/2020 FOR THIS PROJECT. Please contact Michael Dufoe for more information.
Contact: Michael Dufoe 515-985-9196 Michael.dufoe@dnr.iowa.gov
Project consists of electrical upgrade of residence on the Chuck Gipp Decorah Fish Hatchery, 2321 Siewer Spring Road, Decorah, Iowa. Proposal may be obtained by emailing name, address, and phone number.