PROJECTS LETTING -  June , 2021

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

APPANOOSE 21-05-04-07 Honey Creek Resort - Lagoon Influent Ultrasonic Flow Meter (negotiated)-2021-06-01   Bid Completion detail
BOONE 21-02-08-01 Ledges State Park - Restroom and Shelter Roof Replacement-2021-06-03   Bid Completion detail
POLK 21-02-77-06 Big Creek State Park - Office Roof Replacement-2021-06-03   Bid Completion detail
ALLAMAKEE 19-03-03-02 Village Creek Access - Channel Maintenance Dredging-2021-06-17   Bid Completion detail
APPANOOSE 21-05-04-02 Rathbun Wildlife Unit - FEMA Projects-2021-06-17   Bid Completion detail
BUTLER 21-03-12-02 Big Marsh WMA - Replace Dam Air Dryer System-2021-06-17   Bid Completion detail
CLAY 21-01-21-01 Trumbull Lake - Road Maintenance-2021-06-17   Bid Completion detail
HARDIN 21-02-42-01 Pine Lake State Park - Upper Ramp and Parking Lot-2021-06-17   Bid Completion detail
LINN 21-06-57-01 Palisades-Kepler State Park - Hail Damage Repair-2021-06-17   Bid Completion detail
MONONA 22-01-67-01 Blue Lake - Dredging-2021-06-17   Bid Completion detail
STORY 21-02-85-01 State Forest Nursery - Service Roads Resurfacing-2021-06-17   Bid Completion detail
WASHINGTON 20-06-92-02 Lake Darling State Park - Lift Station Electrical Controls Upgrades-2021-06-24   Bid Completion detail




ALLAMAKEE -- PROJECT # 19-03-03-02                6/17/2021                Large Project Letting
VILLAGE CREEK ACCESS
CHANNEL MAINTENANCE DREDGING
Proposal Guarantee: $12,500
Completion Date: 11/15/2022

   This project consists of dredging the Village Creek boater access channel from the boat ramp to the Mississippi River, and incidental work as directed by the DNR Inspector.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Sediment Removal and Dewater     7,000 C.Y.
    Traffic Control     1 L.S.
Alternate
    Sediment Disposal     7,000 C.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 21-05-04-02                6/17/2021                Large Project Letting
RATHBUN WILDLIFE UNIT
FEMA PROJECTS
Proposal Guarantee: $25,000
Completion Date: 11/30/2021

   This project involves FEMA repairs by placing fill, revetment, erosion stone and roadway rock, installing culverts, removing sediment in Appanoose & Lucas Counties in the Rathbun Wildlife Unit.

ESTIMATED QUANTITIES:
    Revetment, Class E (Colyn Emergency Spillway)     226.4 Tons
    Mobilization (Colyn Emergency Spillway)     1 L.S.
    Sediment, Removal and Disposal (Brown Slough)     1,286.7 C.Y.
    Revetment, Class E (Brown Slough)     1,823.9 Tons
    Mobilization (Brown Slough)     1 L.S.
    Earthwork, Fill Hauled and Placed (Brown Slough Dike)     37 C.Y.
    Revetment, Class E (Brown Slough Dike)     721.9 Tons
    Mobilization (Brown Slough Dike)     1 L.S.
    Revetment, Class E (North County Line Road)     316.6 Tons
    Traffic Control (North County Line Road)     1 L.S.
    Mobilization (North County Line Road)     1 L.S.
    Granular Surfacing on Road, 2" Roadstone (Atwells)     28.6 Tons
    Revetment, Class E (Atwells)     95.2 Tons
    Traffic Control (Atwells)     1 L.S.
    Mobilization (Atwells)     1 L.S.
    Culvert, CMP Roadway, 48" (Wind n Waves)     40 L.F.
    Revetment, Class E (Wind n Waves)     574.4 Tons
    Granular Surfacing on Road, 1-1/4" Roadstone (Wind n Waves)     378 Tons
    Traffic Control (Wind n Waves)     1 L.S.
    Mobilization (Wind n Waves)     1 L.S.
    Granular Surfacing on Road, 1-1/4" Roadstone (Bridgeview)     317.3 Tons
    Culvert, CMP Roadway, 24" (Bridgeview)     40 L.F.
    Revetment, Class E (Bridgeview)     3,142.1 Tons
    Traffic Control (Bridgeview)     1 L.S.
    Mobilization (Bridgeview)     1 L.S.
    Sediment, Removal and Disposal (Sedan Bottoms - Site 1)     517.2 C.Y.
    Mobilization (Sedan Bottoms - Site 1)     1 L.S.
    Culvert, CMP Roadway, 42" (Sedan Bottoms - Site 2)     40 L.F.
    Earthwork, Fill Hauled and Placed (Sedan Bottoms - Site 2)     118.5 C.Y.
    Revetment, Class E (Sedan Bottoms - Site 2)     26.2 Tons
    Mobilization (Sedan Bottoms - Site 2)     1 L.S.
    Erosion Stone (Sedan Bottoms - Site 3)     54 Tons
    Mobilization (Sedan Bottoms - Site 3)     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CLAY -- PROJECT # 21-01-21-01                6/17/2021                Large Project Letting
TRUMBULL LAKE
ROAD MAINTENANCE
Proposal Guarantee: $6,250
Completion Date: 9/30/2021

   This project consists of granular roadway maintenance - blading/shaping and spreading new rock. Installation of an 8-inch subdrain is also included.

ESTIMATED QUANTITIES:
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING     39 STA.
    2210 - MACADAM STONE BASE     910 Tons
    2312 - GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE     1,339 Tons
    2502 - SUBDRAIN, WRAPPED, DUAL WALL PERFORATED PLASTIC PIPE, 8"     60 L.F.
    2518 - SAFETY CLOSURE     1 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HARDIN -- PROJECT # 21-02-42-01                6/17/2021                Large Project Letting
PINE LAKE STATE PARK
UPPER RAMP AND PARKING LOT
Proposal Guarantee: $6,250
Completion Date: 9/30/2021

   This project consists of PCC paving a parking lot and replacing a boat ramp.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Excavation, Class 10     260 C.Y.
    Granular Subbase, 6" Depth     158 Tons
    PCC Parking, 6" Depth     467 S.Y.
    Curb and Gutter, 6"     214 L.F.
    Linear Trench Drain     22 L.F.
    PVC Pipe, 12"     90 L.F.
    CMP, 12"     20 L.F.
    ADA Sign and Post     1 Each
    Erosion Stone     6 Tons
    Site Restoration     1 L.S.
Alternate
    Pavement Removal - Alternate for Ramp     293 S.Y.
Alternate
    Excavation, Class 10 - Alternate for Ramp     52 C.Y.
Alternate
    Granular Subbase, 6" Depth - Alternate for Ramp     94 Tons
Alternate
    Revetment, Class D - Alternate for Ramp     35 Tons
Alternate
    PCC Boat Ramp, 6" Reinforced - Alternate for Ramp     293 S.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MONONA -- PROJECT # 22-01-67-01                6/17/2021                Large Project Letting
BLUE LAKE
DREDGING
Proposal Guarantee: $125,000
Completion Date: 12/31/2022

   This project consists of hydraulically removing approximately 383,700 CY of material from Blue Lake, with an alternate bid item for an additional 50,000 CY of material removal.

ESTIMATED QUANTITIES:
    MOBILIZATION/DEMOBILIZATION     1 L.S.
    SAFETY PLAN     1 L.S.
    DREDGING     383,700 C.Y.
    SWPPP PREPARATION AND MANAGEMENT     1 L.S.
    GRANULAR SURFACING     130 Tons
    REMOVAL/REPLACEMENT OF PAVEMENT     100 S.Y.
Alternate
    BID ALTERNATE 1 - DREDGING     50,000 C.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




STORY -- PROJECT # 21-02-85-01                6/17/2021                Large Project Letting
STATE FOREST NURSERY
SERVICE ROADS RESURFACING
Proposal Guarantee: $25,000
Completion Date: 9/15/2021

   This project consists of grading and rock resurfacing of approximately 3.1 miles of interior service lanes at the State Forest Nursery in Ames, IA.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Granular Surfacing, Crushed Stone, Class "A"     4,712 Tons
    Adjust Manhole Grade     2 Each
    Macadam Stone     2,109 Tons
    Excavation, Class 10 Core Out     608 C.Y.
    Geo Grid     9,923 S.Y.
    Erosion Control     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 21-05-04-07                6/1/2021                Small Project Letting
HONEY CREEK RESORT
LAGOON INFLUENT ULTRASONIC FLOW METER (NEGOTIATED)
Proposal Guarantee: $0
Completion Date: 8/31/2021

   Contractor shall install an ultrasonic flow meter for measurement of influent flow in an existing influent structure at the lagoons at Honey Creek Resort. These lagoons are located 1/4 mile north of Iconium, Iowa. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




BOONE -- PROJECT # 21-02-08-01                6/3/2021                Small Project Letting
LEDGES STATE PARK
RESTROOM AND SHELTER ROOF REPLACEMENT
Proposal Guarantee: $0
Completion Date: 8/27/2021

   *Addendum #1 Issued 5/28/2021 - Please contact Don Labate* Both restrooms at Ledges State Park Campground are leaking and in need of replacement. This project will remove the existing roofing materials and install all new roofing materials on the two shower buildings. As an alternate, the Henning Shelter will also be roofed with the same materials as the shower buildings.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




POLK -- PROJECT # 21-02-77-06                6/3/2021                Small Project Letting
BIG CREEK STATE PARK
OFFICE ROOF REPLACEMENT
Proposal Guarantee: $0
Completion Date: 7/30/2021

   The office at Big Creek State Park has old shingles that are deteriorating beyond repair. This project will remove all old shingles and install a new steel roof on the office building. This will also address the gutters and downspouts.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




BUTLER -- PROJECT # 21-03-12-02                6/17/2021                Small Project Letting
BIG MARSH WMA
REPLACE DAM AIR DRYER SYSTEM
Proposal Guarantee: $0
Completion Date: 8/31/2021

   Project consists of removing and disposing of the existing air filter system, furnishing and installing a new desiccant air dryer system that is compatible with existing air compressor, existing 80-gallon vertical tank, and existing air-cooled aftercooler. Existing equipment is housed in a shed at the end of a cul-de-sac on 260yh Street, east of Jay Avenue intersection, near Allison, Butler County Iowa.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




LINN -- PROJECT # 21-06-57-01                6/17/2021                Small Project Letting
PALISADES-KEPLER STATE PARK
HAIL DAMAGE REPAIR
Proposal Guarantee:
Completion Date: 9/17/2021

   The Derecho of 2020 damaged multiple structures within Palisades-Kepler State Park and they are in need of repair. The lodge roof, currently in cedar shingles, will get a new asphalt shingle roof with OSB sheathing over the entire roof deck. There was damage to cabin #4, the campground check-in kiosk, and multiple pole lights throughout the park.

Contact:
Michael Dufoe

Michael.dufoe@dnr.iowa.gov




WASHINGTON -- PROJECT # 20-06-92-02                6/24/2021                Small Project Letting
LAKE DARLING STATE PARK
LIFT STATION ELECTRICAL CONTROLS UPGRADES
Proposal Guarantee:
Completion Date: 10/29/2021

   *ADDENDUM No.1 Issued 6/17/2021 - Please contact Mike Dufoe. The project includes replacing existing phase converters and electrical panels at three lift stations within Lake Darling State Park including any labor, trip charges or other miscellaneous parts that will be needed for fully functional electrical control panels for the lift stations.

Contact:
Michael Dufoe

Michael.dufoe@dnr.iowa.gov