PROJECTS LETTING -  May , 2023

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

BOONE 20-02-08-02 Saylorville WMA - Sportsman Boat Ramp-2023-05-18   Bid Completion detail
BREMER 19-03-09-06 Sweet Marsh Wildlife Management Area - Boat Channel Dredging Rebid-2023-05-18   Bid Completion detail
BUTLER 23-03-12-02 Big Marsh WMA - Osborn Shallow Water Excavation-2023-05-18   Bid Completion detail
JACKSON 19-06-49-01 Bellevue State Park - Campground Leach Field-2023-05-18   Bid Completion detail
POLK 21-02-77-12 Big Creek State Park - Fishing Pier & Path REBID-2023-05-18   Bid Completion detail
JOHNSON 23-06-52-01 Lake Macbride State Park - Fishing Pier Restoration-2023-05-25   Bid Completion detail
BREMER 21-03-09-01 Sweet Marsh Wildlife Management Area - Quail Avenue PCC Pavement Maintenance-2023-06-15   Bid Completion detail
WOODBURY 22-01-97-01 Stone State Park - Pavement Maintenance-2023-06-15   Bid Completion detail




BOONE -- PROJECT # 20-02-08-02                5/18/2023                Large Project Letting
SAYLORVILLE WMA
SPORTSMAN BOAT RAMP
Proposal Guarantee: $12,500
Completion Date: 9/30/2023

   This project consists of installing a gravel entrance road, a portland cement concrete boat ramp, a gravel parking area and armoring the upstream shoreline to protect the new boat ramp and limit shoreline erosion located at the Sportsman boat ramp in Boone County, Iowa and includes clearing and grubbing, grading, installation of a gravel entrance road, a concrete boat ramp with adjacent gravel parking along with shoreline armoring consisting of riprap.

ESTIMATED QUANTITIES:
    Clearing and Grubbing     1 L.S.
    Grading     1 L.S.
    Class 'A' Crushed Stone     515 Tons
    6-inch Reinforced PCC Pavement     161 S.Y.
    Class 'B' Riprap     150 Tons
    Class 'D' Riprap     260 Tons
    Macadam Stone     22 Tons
    Grooved Reinforced PCC Boat Ramp     116.7 S.Y.
    Grout or K-Crete     10 C.Y.
    8-inch Filter Sock     210 L.F.
    Seeding, Fertilizing and Mulching     0.6 Acres
    Handicap Signage and Pavement Markings     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BREMER -- PROJECT # 19-03-09-06                5/18/2023                Large Project Letting
SWEET MARSH WILDLIFE MANAGEMENT AREA
BOAT CHANNEL DREDGING REBID
Proposal Guarantee: $25,000
Completion Date: 5/15/2024

   This project involves the repair of the existing dike system around Martens Lake and mechanically dredging portions of the lake.

ESTIMATED QUANTITIES:
    Clearing & Grubbing     1 L.S.
    Excavation, Embankment     5,946.6 C.Y.
    Excavation, Waste     60,017 C.Y.
    Seeding/Fertilizing/Mulching     4.6 Acres
    Perimeter and Slope Sediment Control Device, 9"     11,437 L.F.
    Construction Survey     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JACKSON -- PROJECT # 19-06-49-01                5/18/2023                Large Project Letting
BELLEVUE STATE PARK
CAMPGROUND LEACH FIELD
Proposal Guarantee: $12,500
Completion Date: 10/31/2023

   This project consists of constructing a new leach field system for park campground and other miscellaneous work associated with the project.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Downed Tree & Stump Removal Including Clearing & Grubbing     1.3 Acres
    Lift Station Complete With Wet Well, Valve Pit, Pumps, Electric Wiring, Valves & Controls (Excludes Secondary Wiring from Transformer)     1 L.S.
    Secondary Single Phase Wiring to Lift Station (Approx. Length 350 ft.)     1 L.S.
    Connection To New Lift Station & Plug Existing Outlet in Existing Manhole     1 L.S.
    Install New 3" HDPE SDR 17 Or PVC Sch. 80 Forcemain (Bored or Open Cut)     1,150 L.F.
    Install New Leach Field System Complete With Manifold, Valves, Laterals And Chambers     1 L.S.
    8" Filter Sock     700 L.F.
    Seeding Mulching & Fertilization     1.3 Acres
    NPDES General Permit #2 & SWPPP     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POLK -- PROJECT # 21-02-77-12                5/18/2023                Large Project Letting
BIG CREEK STATE PARK
FISHING PIER & PATH REBID
Proposal Guarantee: $25,000
Completion Date: 6/30/2024

   This project consists of demolishing the existing damaged wooden accessible fishing pier and constructing a new steel framed accessible fishing pier and fishing path along the shoreline north of the pier. Work includes pile driving, steel framing, field welding, deck and railing construction, and finishing. The new accessible fishing path entails grading of the shoreline to create a bench, constructing PCC sidewalk, riprap of the band, seeding of the cut bank, and incidental work as required by the DNR District Engineer.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Excavation, Class 10, Waste     992 C.Y.
    Excavation, Class 10, Embankment     26 C.Y.
    Demolition of Existing Pier     1 L.S.
    Sediment Log, 8"     300 L.F.
    PCC Sidewalk Removal     10 S.F.
    5" Reinforced PCC Sidewalk     239 S.Y.
    Class A Crushed Stone     75 Tons
    Revetment, Class D     385 Tons
    Seeding, Fertilizing, and Mulching     1 L.S.
    Fishing Pier, Complete     1 L.S.
    6" PCC Patch     193 S.Y.
    Construction Staking     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BREMER -- PROJECT # 21-03-09-01                6/15/2023                Large Project Letting
SWEET MARSH WILDLIFE MANAGEMENT AREA
QUAIL AVENUE PCC PAVEMENT MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 11/1/2023

   This project consists of PCC pavement patches, crack cleaning and filling and foreslope armoring at Sweet Marsh Wildlife Management Area.

ESTIMATED QUANTITIES:
    Patches, Full-Depth Finish, by Area     234 S.Y.
    Patches, Full-Depth Finish, by Area (Greater than 50 ft in length)     104 S.Y.
    Patches, Full-Depth Finish, by Count, 6-inch PCC     12 Each
    Subbase (Patches)     338 S.Y.
    Granular Subbase     153 S.Y.
    Clean + Fill Crack (Pav't Maint)     0.1 MI.
    Sealer Material (PCC Pav't)     650 LB.
    Paved Shoulder, PCC, 6", Place Only     190 S.Y.
    Flexamat, Furnish and Install     5,320 S.F.
    Removal of Existing Revetment     1 L.S.
    Removal of Existing Rock     1 L.S.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WOODBURY -- PROJECT # 22-01-97-01                6/15/2023                Large Project Letting
STONE STATE PARK
PAVEMENT MAINTENANCE
Proposal Guarantee: $37,500
Completion Date: 11/1/2023

   This project consists of pavement maintenance for the roads at Stone State Park in Woodbury County, Iowa.

ESTIMATED QUANTITIES:
    Bituminous Fog Seal (HMA Pavement)     6,693 GAL.
    Patches, Full-Depth Finish, 6-inch, By Area, HMA     988 S.Y.
    Patches, Full-Depth Finish, 6-inch, By Count, HMA     26 Each
    Patches, Partial-Depth Repair, HMA     95 S.Y.
    HMA (Partial Depth Patch Material)     4 Tons
    Modified Subbase     165 C.Y.
    Pavement Scarification     911 S.Y.
    Hot Mix Asphalt High Traffic, Surface Course, 1/2 In. Mix, No Special Friction Requirement     111 Tons
    Asphalt Binder, PG 58-28H, High Traffic     6 Tons
    Transverse Joint Repair     111 Tons
    Cleaning and Filling Cracks (HMA Surfaces)     4.3 MI.
    Sealer Material (HMA Surfaces)     4,300 LB.
    Granular Surface On Road, 1 1/2"     242 Tons
    Granular Shoulder, 1 1/2" Minus     25 Tons
    Revetment, Class E     174 Tons
    Erosion Stone     5 Tons
    Seeding (Rural)     0.1 Acres
    Rolled Erosion Control Product     34 S.Y.
    Culvert, CMP Roadway, 24"     104 L.F.
    Apron, Metal, 24"     4 Each
    Pipe Apron Guard     4 Each
    Ditch Cleaning     150 L.F.
    Curb and Gutter Repair, HMA     15 L.F.
    Clean Out Intakes and Outlet Pipes     2 Each
    Traffic Control     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BUTLER -- PROJECT # 23-03-12-02                5/18/2023                Small Project Letting
BIG MARSH WMA
OSBORN SHALLOW WATER EXCAVATION
Proposal Guarantee: $0
Completion Date: 11/15/2023

   This project consists of shallow water excavation of a wetland.

Contact:
Kenneth Howe
319-240-3553
Kenneth.howe@dnr.iowa.gov




JOHNSON -- PROJECT # 23-06-52-01                5/25/2023                Small Project Letting
LAKE MACBRIDE STATE PARK
FISHING PIER RESTORATION
Proposal Guarantee: $0
Completion Date: 8/31/2023

   Lake Macbride's fishing pier is 25+ years old and the wood decking and railings are beyond their expected life-span. This project will replace all wood decking, railings, some concrete work, and accessories as shown.

Contact:
Mark Moeller
515-214-9532