PROJECTS LETTING -  May , 2011

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DICKINSON 09-01-30-01 Spirit Lake (Templar Lagoon) - Fishing "Boardwalk" / Dredging-2011-05-12   Bid Completion detail
DECATUR 09-05-27-03 Nine Eagles State Park - Family Cabin - (Re-Bid)-2011-05-19   Bid Completion detail
DECATUR 09-05-27-03 Nine Eagles State Park - Family Cabin - (Re-Bid) (Contract)-2011-05-19   Bid Completion detail
MARION 11-05-63-05 Red Rock WMA - Red Rock N-HQ Remodel-2011-05-19   Bid Completion detail
POLK 11-02-77-04 Big Creek State Park - Sanitary Sewer Rehabilitation-2011-05-19   Bid Completion detail
SCOTT 08-06-82-01 Lost Grove Lake Access - Shoreline Armoring / Fish Habitat-2011-05-19   Bid Completion detail
WARREN 05-05-91-02 Banner shooting range - Wetland Fill-2011-05-19   Bid Completion detail
BOONE 11-02-08-10 Boone Research Station - Water Service Connections-2011-05-26   Bid Completion detail
RINGGOLD 10-04-80-02 Mt. Ayr - We have a road culvert washing -2011-05-26   Bid Completion detail
STORY 11-02-85-01 State Forest Nursery - Chainlink Fence around Nursery-2011-05-26   Bid Completion detail
STORY 11-02-85-01 State Forest Nursery - Chainlink Fence around Nursery (Contract)-2011-05-26   Bid Completion detail
DICKINSON 11-01-30-04 Mini-Wakan State Park - Historic Lodge Restoration-2011-06-02   Bid Completion detail
LINN 11-06-57-04 Pleasant Creek State Rec Area - Storm Sewer Repair, Handicap Access-2011-06-02   Bid Completion detail
WASHINGTON 11-06-92-04 Lake Darling State Park - foundations and utility work-2011-06-02   Bid Completion detail
DES MOINES 11-06-29-03 Geode State Park - new pit toilet, take out old -2011-06-09   Bid Completion detail
MARION 11-05-63-03 Elk Rock State Park - Televised Sewer Inspection-2011-06-09   Bid Completion detail
WEBSTER 11-02-94-10 Dolliver State Park - 2010 FEMA Flood Repairs-2011-06-09   Bid Completion detail
WEBSTER 11-02-94-12 Dolliver State Park - Debris & Sediment Removal- FEMA-2011-06-09   Bid Completion detail




DECATUR -- PROJECT # 09-05-27-03                5/19/2011                Large Project Letting
NINE EAGLES STATE PARK
FAMILY CABIN - (RE-BID)
Proposal Guarantee: $5,000
Completion Date: 10/15/2011

   Construction of a year round, wood framed cabin structure of approximately 496 gross s.f., including related mechanical, electrical, and site construction. The living space includes one bedroom, one bathroom, one kitchen, and an exterior covered deck (alternate).

ESTIMATED QUANTITIES:
    Base Bid - Cabin     1 Units
Alternate
    Omit Cabin Deck     1 Units

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MARION -- PROJECT # 11-05-63-05                5/19/2011                Large Project Letting
RED ROCK WMA
RED ROCK N-HQ REMODEL
Proposal Guarantee: $5,000
Completion Date: 9/1/2011

   Work of the contract can be summarized as follows: The work consists of the construction of a one story addition to an existing shop building with metal siding, approximately 18' x 48' with three offices, a meeting/project area, and a restroom. The work also includes plugging of an abandoned well at the site.

ESTIMATED QUANTITIES:
    Clearing and Grubbing     1 L.S.
    New Addition, 18' X 48', Complete     1 L.S.
    Granular Subbase, 4" Depth Cr. Stone     24 Tons
    Concrete, Class "C" Structural     35 C.Y.
    Electric Service and Building System     1 L.S.
    Septic System, Complete     1 L.S.
    HVAC System, Complete     1 L.S.
    Restroom Fixtures, Complete     1 L.S.
    Counters, Cabinets & Shelves, Complete     1 L.S.
    Plug Existing Well     1 L.S.
    Seed, Fertilize & Mulch     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POLK -- PROJECT # 11-02-77-04                5/19/2011                Large Project Letting
BIG CREEK STATE PARK
SANITARY SEWER REHABILITATION
Proposal Guarantee: $5,000
Completion Date: 9/30/2011

   This project consists of rehabilitating the existing wastewater collection system at Big Creek State Park. The scope of the project includes in-situ lining of the collection pipe, digging and point repairing the pipe at several places where pipe has collapsed and cannot be lined and rehabilitation of the manholes by either grouting, readjusting the frames or in some cases replacing the manholes.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Replace Manhole Frame     1 Each
    Raise Manhole Frame to Grade     6 Each
    Reset/Attach Manhole Frame     3 Each
    Grout Manhole Joints/Holes     25 Each
    Seal Adjusting Rings     7 Each
    Install External Manhole Chimney Seal     8 Each
    Point Repair - 8 inch Sewer Pipe     3 Each
    Sanitary Sewer Pipe Lining     2,493 L.F.
    Sanitary Sewer Heavy Cleaning     295 L.F.
    Sanitary Sewer Root Cutting     271 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SCOTT -- PROJECT # 08-06-82-01                5/19/2011                Large Project Letting
LOST GROVE LAKE ACCESS
SHORELINE ARMORING / FISH HABITAT
Proposal Guarantee: $50,000
Completion Date: 9/30/2011

   This project consists of building various structures associated with fishing and incidental work as required by the drawings, the DNR Construction Inspector. These structures include fishing jetties, underwater fish mounds, spawning beds, underwater terraces, underwater rock shelters, shoreline armoring and sheet pile fishing structures. The dam for Lost Grove Lake is currently under construction and the lake will be empty throughout the duration of this project.

ESTIMATED QUANTITIES:
    Class "D" Revetment     27,279 Tons
    Class "10" Excavation     34,450 C.Y.
    Engineering Fabric     33,432 S.Y.
    Class "A" Road Stone     395 Tons
    3/8" Granular Surfacing     584 Tons
    Sheet Piling     3,255 S.F.
    3"x12" Bridge Planking     388 L.F.
    2" Stone     20 Tons
    6" Erosion Stone     245 Tons
    3" Rock     95 Tons
    Sand     110 Tons
    Earthfill     32,395 C.Y.
    Tree Structures     3 Each
    Debris Cleanup     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 11-01-30-04                6/2/2011                Large Project Letting
MINI-WAKAN STATE PARK
HISTORIC LODGE RESTORATION
Proposal Guarantee: $20,000
Completion Date: 5/25/2012

   RESTORATION AND CONVERSION OF THE EXISTING LODGE TO A RENTAL LODGE IN MINI-WAKAN STATE PARK, DICKINSON COUNTY, IOWA. WORK INCLUDES A NEW ROOF, INTERIOR FINISHES, ELECTRICAL MODIFICATIONS AND UTILITY RELOCATION.

ESTIMATED QUANTITIES:
    EXISTING SHELTER RESTORATION     1 L.S.
    NEW SHELTER CONSTRUCTION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 09-01-30-01                5/12/2011                Small Project Letting
SPIRIT LAKE (TEMPLAR LAGOON)
FISHING "BOARDWALK" / DREDGING
Proposal Guarantee: $0
Completion Date: 8/29/2011

   The scope of this project involves the construction of a 8' x 275' Wooden "Boardwalk" type handicap accessible fishing structure on the west side of Big Spirit Lake in Templar Lagoon, Dickinson County, IA. Work will include driving 8"x 8" wood piling, wood structural framing, wood decking, wood railings, a concrete parking area, concrete sidewalk, concrete abutment, and rip rap protection.

Contact:
Jeff Felts
515-250-3712
[email protected]




WARREN -- PROJECT # 05-05-91-02                5/19/2011                Small Project Letting
BANNER SHOOTING RANGE
WETLAND FILL
Proposal Guarantee:
Completion Date: 9/30/2011

   This project consists of placing 3' of earth fill in an area approximately 0.4 acres in size.

Contact:
Jason Kruse
(515) 250-3707
[email protected]




BOONE -- PROJECT # 11-02-08-10                5/26/2011                Small Project Letting
BOONE RESEARCH STATION
WATER SERVICE CONNECTIONS
Proposal Guarantee:
Completion Date: 6/9/2011

   Provide water serfvice connections as directred byt he DNR iInspector.

Contact:
Don Labate
515-250-3714
[email protected]




RINGGOLD -- PROJECT # 10-04-80-02                5/26/2011                Small Project Letting
MT. AYR
WE HAVE A ROAD CULVERT WASHING
Proposal Guarantee:
Completion Date: 7/22/2011

   Resetting washed out culvert, regrade area for proper drainage and seeding of disturbed areas.

Contact:
Mark Johnson
515-250-3713
[email protected]




STORY -- PROJECT # 11-02-85-01                5/26/2011                Small Project Letting
STATE FOREST NURSERY
CHAINLINK FENCE AROUND NURSERY
Proposal Guarantee:
Completion Date: 6/30/2011

   This project is for materials and labor to install a new six foot tall light commercial chainlink fence around the DNR State Forest Nursery facility in Ames, IA. The length of the fence is approximately 5,300 feet. A majority of the fence is on flat ground with one area to abut or cross a creek.

Contact:
Don Labate
515-250-3714
[email protected]




LINN -- PROJECT # 11-06-57-04                6/2/2011                Small Project Letting
PLEASANT CREEK STATE REC AREA
STORM SEWER REPAIR, HANDICAP ACCESS
Proposal Guarantee:
Completion Date: 8/15/2011

   This project consists of the construction of a 5' wide handicap accessible sidewalk from the asphalt parking area to a proposed floating handicap pier and purchase of the pier. Add Rip-Rap to protect the shoreline. Make shoreline adjustments to accept the floating fishing dock. Also included is the repair of three storm water intake structures with pavement replacement.

Contact:
Heath Delzell
(515) 979-0104
[email protected]




WASHINGTON -- PROJECT # 11-06-92-04                6/2/2011                Small Project Letting
LAKE DARLING STATE PARK
FOUNDATIONS AND UTILITY WORK
Proposal Guarantee:
Completion Date: 8/15/2011

   This project consists of the demolition of two existing shower buildings at the Lake Darling campground, the construction of two new building foundations, and stubbed utilities for the new shower buildings. Along with any incidental work as required by the plans and/or DNR construction inspector.

Contact:
Bryce Ogea
515-281-8409
[email protected]




DES MOINES -- PROJECT # 11-06-29-03                6/9/2011                Small Project Letting
GEODE STATE PARK
NEW PIT TOILET, TAKE OUT OLD
Proposal Guarantee:
Completion Date: 7/8/2011

   Project consists of the demolition of a pit latrine and tree removal for access to the site.

Contact:
David Heer
(515) 250-3719
[email protected]




MARION -- PROJECT # 11-05-63-03                6/9/2011                Small Project Letting
ELK ROCK STATE PARK
TELEVISED SEWER INSPECTION
Proposal Guarantee:
Completion Date:

   Televised inspection and light cleaning of sanitary sewer and service laterals ranging in diameter between 4 inches and 8 inches. Project includes heavy cleaning for removal of grit, sludge, and debris using a combination jet/vac, and root cutting if necessary to complete televised inspection.

Contact:
Jason Kruse
(515) 250-3707
[email protected]




WEBSTER -- PROJECT # 11-02-94-10                6/9/2011                Small Project Letting
DOLLIVER STATE PARK
2010 FEMA FLOOD REPAIRS
Proposal Guarantee:
Completion Date: 8/11/2011

   This is a FEMA repair project to replace rock surfacing on campground pads, parking areas and trails, reinforce stream banks and to relay 2 CMP culverts within Dolliver State Park.

Contact:
Don Labate
515-250-3714
[email protected]




WEBSTER -- PROJECT # 11-02-94-12                6/9/2011                Small Project Letting
DOLLIVER STATE PARK
DEBRIS & SEDIMENT REMOVAL- FEMA
Proposal Guarantee:
Completion Date: 7/14/2011

   This is a FEMA project to remove silt and trees in various areas of the Dolliver State Park from the floods of 2010.

Contact:
Don Labate
515-250-3714
[email protected]