PROJECTS LETTING -  April , 2018

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

FAYETTE 19-03-33-01 Grannis Creek WMA - Repair Fishing Access Walkway-2018-04-26   Bid Completion detail
HUMBOLDT 18-01-46-01 Three Rivers WMA - Larson Tract Wetland Restoration-2018-04-26   Bid Completion detail
APPANOOSE 18-05-04-05 Rathbun Fish Hatchery Research Building - Electric for Fish Culture Systems-2018-05-03   Bid Completion detail
CERRO GORDO 18-03-17-02 Clear Lake Ponds WMA - Modify Water Control Structure-2018-05-03   Bid Completion detail
JOHNSON 18-06-52-04 Lake Macbride State Park - Air Conditioner Replacement-2018-05-03   Bid Completion detail
LUCAS 18-05-59-01 Stephens Forest Headquarters - Driveway Replacement-2018-05-03   Bid Completion detail
WASHINGTON 18-06-92-03 Lake Darling State Park - D4FY19-1 Trail Repair at Bridge-2018-05-09   Bid Completion detail
WORTH 17-03-98-03 Rice Lake WMA - Repair Flood Damaged Dike & Water Control Structure-2018-05-10   Bid Completion detail
DICKINSON 17-01-30-02 Gull Point State Park - Gull Point Residence Window & Door Replacement-2018-05-17   Bid Completion detail
DICKINSON 17-01-30-02 Gull Point State Park - Gull Point Residence Window & Door Replacement-2018-05-17   Bid Completion detail
ADAIR 18-04-01-01 Middle River Forest Area - Middle River Forest Park Access-2018-05-24   Bid Completion detail
ALLAMAKEE 18-03-03-02 Village Creek Access at Lansing, Iowa - Parking Lot Paving and Boat Ramp Extensions-2018-05-24   Bid Completion detail
BUENA VISTA 18-01-11-02 Storm Lake - Phase II Island Stabilization-2018-05-24   Bid Completion detail
CASS 19-04-15-01 Lake Anita - Shoreline Rip-Rap-2018-05-24   Bid Completion detail
MONTGOMERY 18-04-69-01 Viking Lake - Seawall Replacement-2018-05-24   Bid Completion detail
STORY 16-02-85-03 Hickory Grove Lake - Low Water Drain Pipe and Valve-2018-05-24   Bid Completion detail




ADAIR -- PROJECT # 18-04-01-01                5/24/2018                Large Project Letting
MIDDLE RIVER FOREST AREA
MIDDLE RIVER FOREST PARK ACCESS
Proposal Guarantee: $5,000
Completion Date: 5/30/2019

   THIS PROJECT CONSISTS OF INSTALLING A PORTLAND CEMENT CONCRETE CANOE RAMP, ON THE MIDDLE RIVER LOCATED IN ADAIR COUNTY, IOWA AND INCLUDES GRADING, PLACING RIPRAP ALONG RIVER BANKS, AND INSTALLING REINFORCED PORTLAND CEMENT CONCRETE CANOE ACCESS RAMP ONTO THE MIDDLE RIVER.

ESTIMATED QUANTITIES:
    Clearing and Grubbing     1 L.S.
    Grading     1 L.S.
    Subgrade Preparation     90 S.Y.
    Granular Subbase     19 Tons
    Class 'A' Crushed Stone     184 Tons
    Macadam Stone     13 Tons
    3-inch Clean Limestone     50 Tons
    Class 'E' Riprap     425 Tons
    Broomed Reinforced PCC Canoe Launch Ramp     44.5 S.Y.
    6-inch Reinforced PCC Pavement     74.6 S.Y.
    8-inch Filter Sock     318 L.F.
    Seeding, Fertilizing and Mulching     0.2 Acres
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




ALLAMAKEE -- PROJECT # 18-03-03-02                5/24/2018                Large Project Letting
VILLAGE CREEK ACCESS AT LANSING, IOWA
PARKING LOT PAVING AND BOAT RAMP EXTENSIONS
Proposal Guarantee: $72,000
Completion Date: 10/31/2018

   This project consists of paving the roadway and boat ramp parking lot, installing a vault restroom, constructing sidewalks and constructing boat ramp extensions.

ESTIMATED QUANTITIES:
    Clearing and Grubbing     1 L.S.
    Remove and Reinstall Existing Kiosk     1 L.S.
    Remove Existing Sidewalk     14 S.Y.
    Pavement, PCC, 7"     18,696 S.Y.
    Sidewalk, PCC, 5"     16 S.Y.
    Class "A" Crushed Stone     38 Tons
    Special Backfill     3,205 C.Y.
    Shoulder Construction, Earth     25 STA.
    Painted Pavement Markings, Waterborne/Solvent-White     115 STA.
    Painted Pavement Markings, Waterborne/Solvent-Dash Yellow Centerline     4 STA.
    Painted Symbols and Legends, Waterborne or Solvent-Based     14 Each
    Excavation, Class 10, Roadway and Borrow     2,866 C.Y.
    Excavation, Class 10, Waste     1,596 C.Y.
    Erosion Control     2,598 L.F.
    Rural Seeding, Fertilizing and Mulching     0.68 Acres
    Precast Concrete Parking Wheel Stops     22 Each
    Armorflex Articulating Concrete Block Revetment System     768 S.F.
    Precast Concrete Double Vault     1 Each
    Precast Concrete Double Vault     10 S.F.
    Singing     18 Each
    Revetment, Remove     420 C.Y.
    Revetment, Class E     29 Tons
    Furnish and Install Solar Light     1 Each
    PCC Pole Base     1 Each
    Traffic Control     1 L.S.
    Mobilization     1 L.S.
Alternate
    Excavation, Class 10, Waste     5,497 C.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BUENA VISTA -- PROJECT # 18-01-11-02                5/24/2018                Large Project Letting
STORM LAKE
PHASE II ISLAND STABILIZATION
Proposal Guarantee: $20,000
Completion Date: 5/15/2019

   The Storm Lake Phase II Island Stabilization project is designed to provide fieldstone Rip-rap protection to the existing big Island on Storm Lake, Buena Vista County, Iowa. The scope of work includes supply of class "E" fieldstone revetment, transportation of the stone to the island by barge from the designated staging area, and placement of the stone around the perimeter of the Island at the specified width and depth. It is estimated that about 4,655 Tons of class "E" material will be needed to complete the project.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    CLASS 'E' FIELD STONE REVETMENT     4,655 Tons
    STAGGING AREA PREPARATION & RESTORATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MONTGOMERY -- PROJECT # 18-04-69-01                5/24/2018                Large Project Letting
VIKING LAKE
SEAWALL REPLACEMENT
Proposal Guarantee: $12,000
Completion Date: 10/31/2018

   This project consists of removing 423 feet of existing wooden seawall, furnish and install 4,490 S.F. of steel sheet piling, 10 concrete deadman anchors with tieback rods, 5 foot wide concrete cap and walkway, and other incidental work as required by DNR inspector.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    PZ-27 Sheet Piling, 10 Ft Length     4,470 S.F.
    PZ-90 Sheet Piling Connector, 10 Ft Length     4 Each
    Concrete Deadman Anchors w/1" X 20' Tieback Rods     10 Each
    CCA Treated Bridge Planks, 3" x 12"     850 L.F.
    Dock Edging, P-Shaped     425 L.F.
    PCC Sidewalk, 4" Depth X 5' Width     237 S.Y.
    Class 'A' Crushed Stone     200 Tons
    Eye Bolts 1/2" x 6", 316 Grade Stainless Steel     82 Each
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




STORY -- PROJECT # 16-02-85-03                5/24/2018                Large Project Letting
HICKORY GROVE LAKE
LOW WATER DRAIN PIPE AND VALVE
Proposal Guarantee: $27,000
Completion Date: 5/15/2019

   This project consists of boring a 24" HDPE pipe through the dam abutment, install a filter diaphragm around the pipe, install an isolation valve, construct an impact basin, and construct an inlet structure. During construction, the contractor shall pump the lake down and maintain low pool elevation for the duration of the contract.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clearing and Grubbing     1 L.S.
    Dewatering     1 L.S.
    Construction Site Access     1 L.S.
    Excavation     1 L.S.
    HDPE Pipe - 24", DR11 - Trenchless Construction     1,270 L.F.
    Ductile Iron Pipe - 24" Class 53     30 L.F.
    Bend Fitting - 24" 22.5      1 Each
    Transition Fitting - 24" HDPE-DIP     1 Each
    Gate Valve - 24"     1 Each
    Riser Inlest Structure     1 L.S.
    Valve Vault     1 L.S.
    Impact Basin     1 L.S.
    Subdrain - 8" CMP     100 L.F.
    Filter Diaphragm     1 L.S.
    Revetment Stone, Class D     200 Tons
    Fertilizing Seed Mulching     1,000 S.Y.
    Erosion Control Matting     275 S.Y.
    Silt Fence     250 L.F.
    Floating Silt Curtain     100 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




FAYETTE -- PROJECT # 19-03-33-01                4/26/2018                Small Project Letting
GRANNIS CREEK WMA
REPAIR FISHING ACCESS WALKWAY
Proposal Guarantee: $0
Completion Date: 6/1/2018

   The project consists of repairing flood damaged concrete fishing access (848SF), furnishing & placing riprap revetment (220 Ton) and reshaping & seeding stream bank on Grannis Creek WMA near Wadena, Fayette Co. Iowa. Proposal may be obtained by e-mailing name, address, and phone number to melvin.pacovsky@dnr.iowa.gov. Bid closes at 3:00 PM CST on April 26, 2018.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




HUMBOLDT -- PROJECT # 18-01-46-01                4/26/2018                Small Project Letting
THREE RIVERS WMA
LARSON TRACT WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 9/1/2018

   This project is designed to restore/create seven wetland pool areas on the Larson Tract of the Three Rivers Wildlife Management area in Humboldt County, Iowa. Work under this project includes earthfill (dike construction), shallow water excavation, tile search, and tile breaks. The estimated project cost is $25,000.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




APPANOOSE -- PROJECT # 18-05-04-05                5/3/2018                Small Project Letting
RATHBUN FISH HATCHERY RESEARCH BUILDING
ELECTRIC FOR FISH CULTURE SYSTEMS
Proposal Guarantee: $0
Completion Date: 11/21/2018

   This project consists of providing electrical power to several DNR-supplied components including motors, heaters, lighting, pumps, UV disinfection, feeder controllers, etc, for a new aquaculture system. The project includes installation of an electrical panel and phase converter. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




CERRO GORDO -- PROJECT # 18-03-17-02                5/3/2018                Small Project Letting
CLEAR LAKE PONDS WMA
MODIFY WATER CONTROL STRUCTURE
Proposal Guarantee: $0
Completion Date: 8/3/2018

   Project consists of modifying existing water control structure by filling the inside drop of the structure with PC Concrete to approximately 8" above the existing inlet ledge, installing steel stop log channel guides near the front vertically and across floor, cutting a new 24" diameter outlet through back side, installing 24" CMP culvert from structure to county drainage ditch, and placing steel grating on top of structure at Clear Lake Pond WMA north of Clear Lake, Cerro Gordo County Iowa. Proposal may be obtained by e-mailing melvin.pacovsky@dnr.iowa.gov your name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




JOHNSON -- PROJECT # 18-06-52-04                5/3/2018                Small Project Letting
LAKE MACBRIDE STATE PARK
AIR CONDITIONER REPLACEMENT
Proposal Guarantee: $0
Completion Date: 6/21/2018

   Replace existing air conditioner at residence within Lake Macbride State Park with 5-zone, mini-split system. Includes demolition of old air conditioner and installation of new system.

Contact:
Michael Dufoe

Michael.dufoe@dnr.iowa.gov




LUCAS -- PROJECT # 18-05-59-01                5/3/2018                Small Project Letting
STEPHENS FOREST HEADQUARTERS
DRIVEWAY REPLACEMENT
Proposal Guarantee: $0
Completion Date: 9/30/2018

   This project involves replacement of a concrete driveway, 92 square yards, 6" thick with reinforcement. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




WASHINGTON -- PROJECT # 18-06-92-03                5/9/2018                Small Project Letting
LAKE DARLING STATE PARK
D4FY19-1 TRAIL REPAIR AT BRIDGE
Proposal Guarantee: $0
Completion Date: 10/31/2018

   This project consists of constructing approaches for the existing pedestrian foot bridge located at Lake Darling State Park. Included in this contract is mobilization, de-mobilization, rock stripping and respreading, earthfill, riprap, engineering fabric, and riprap. The contractor shall strip the existing granular sufacing from an area approximately 36'x70' at each approach. 300 CY of clay shall be placed at each approach. Clay is available at the DNR's stockpile location. The edges of the approach shall be armored with riprap over engineering fabric. A single 15 ton load of riprap shall be placed at each corner, totaling 60 tons.

Contact:
Michael Dufoe

Michael.dufoe@dnr.iowa.gov




WORTH -- PROJECT # 17-03-98-03                5/10/2018                Small Project Letting
RICE LAKE WMA
REPAIR FLOOD DAMAGED DIKE & WATER CONTROL STRUCTURE
Proposal Guarantee: $0
Completion Date: 8/31/2018

    The project consists of furnishing & placing off-site fill (450 CY), scarifying & reshaping top of dikes, resetting a water control structure, and furnishing & placing 2 CMP culverts at Rice Lake WMA near Lake Mills, Worth County Iowa. Proposal may be obtained by e-mailing melvin.pacovsky@dnr.iowa.gov your name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




DICKINSON -- PROJECT # 17-01-30-02                5/17/2018                Small Project Letting
GULL POINT STATE PARK
GULL POINT RESIDENCE WINDOW & DOOR REPLACEMENT
Proposal Guarantee: $0
Completion Date: 8/17/2018

   This project is designed to replace the existing windows and doors in the residence house at Gull Point State Park in Dickinson County, Iowa. Work under this project includes removal of the existing windows and doors, supply and installation of new windows and doors along with the associated trim work and finishing.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




CASS -- PROJECT # 19-04-15-01                5/24/2018                Small Project Letting
LAKE ANITA
SHORELINE RIP-RAP
Proposal Guarantee: $0
Completion Date: 10/4/2018

   This project involves Shoreline Stabilization at Lake Anita with Class 'E' Revetment and any incidental work as required by the D.N.R Field Engineer in Cass County. IA North Area: 150 Linear Feet - 130 tons Class "E" Riprap South Area: 180 Linear Feet - 150 tons Class "E" Riprap * Site Restoration required on the access route and both sites. Proposal may be obtained by e-mailing name, address, and phone number.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov