PROJECTS LETTING -  April , 2012

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

BOONE 12-02-08-04 Boone Research Station - ANS/Fisheries Storage Building-2012-04-19   Bid Completion detail
DUBUQUE 12-03-31-02 Mines of Spain - trail repair/riprap-2012-04-19   Bid Completion detail
GUTHRIE 11-04-39-02 Springbrook State Park - Sewer System-2012-04-19   Bid Completion detail
MARION 10-05-63-01 Red Rock WMA - Swan - Dike and Control Structures-2012-04-19   Bid Completion detail
RINGGOLD 12-04-80-03 Kellerton Wildlife Area - New headquarters (rebid)-2012-04-19   Bid Completion detail
MONONA 10-01-67-02 Lewis and Clark Park - Pump Station Replacement-2012-04-26   Bid Completion detail
CLAY 12-01-21-01 D.U. Marsh - repair water control structure-2012-05-17   Bid Completion detail
DICKINSON 12-01-30-06 Claire Wilson Access - Sidewalk Repair-2012-05-17   Bid Completion detail
LINN 12-06-57-01 Pleasant Creek State Rec Area - New Restroom-2012-05-17   Bid Completion detail
SCOTT 12-06-82-01 Lost Grove Lake WMA - Concrete Box Culvert Inlet Risers-2012-05-17   Bid Completion detail




BOONE -- PROJECT # 12-02-08-04                4/19/2012                Large Project Letting
BOONE RESEARCH STATION
ANS/FISHERIES STORAGE BUILDING
Proposal Guarantee: $5,000
Completion Date: 12/31/2012

   This project consists of the construction of a one story, pre-engineered post-frame building with a metal roof and metal siding, approximately 40' x 136’, including two heated bays, five cold storage bays and a storage loft. The work also includes concrete and class “A” crushed stone paving, concrete paving and electrical services. Project number 12-02-08-04

ESTIMATED QUANTITIES:
    Earthwork     1 L.S.
    6" Class "A" Crushed Stone Paving     1 L.S.
    Site Restoration     1 L.S.
    6" Thick Exterior Concrete Apron     1 L.S.
    40"-0" x 136'-0" Post-Frame Building     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DUBUQUE -- PROJECT # 12-03-31-02                4/19/2012                Large Project Letting
MINES OF SPAIN
TRAIL REPAIR/RIPRAP
Proposal Guarantee: $10,000
Completion Date: 6/30/2012

   This project consists of repairs to flood damaged portions of Calcite Trail, streambank armoring adjacent to the trail, streambank armoring adjacent to an existing roadway bridge over Catfish Creek, and incidental work as required by the Plans and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Furnish & Install Fill (Trail)     7,021 C.Y.
    Furnish & Install Fill (Bridge)     93 C.Y.
    Engineering Fabric (Trail)     1,164 S.Y.
    Engineering Fabric (Bridge)     249 S.Y.
    Revetment, Class "D" Riprap (Trail)     1,187 Tons
    Revetment, Class "D" Rirpap (Bridge)     716 Tons
    Surfacing, Class "A" Cr. Stone     275 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




GUTHRIE -- PROJECT # 11-04-39-02                4/19/2012                Large Project Letting
SPRINGBROOK STATE PARK
SEWER SYSTEM
Proposal Guarantee: $5,000
Completion Date: 9/30/2012

   This project consists of installing a new 3700 ft. long 2 inch diameter HDPE sewer forcemain along with two lift stations and an equalization tank. Upgrading the existing dump station at the campground by replacing the holding tank. Lining or replacing 225 ft. of existing 8 inch dia. gravity sewer and other miscellaneous related work.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Remove Existing Dump Station Manhole & Plug Lines     1 Each
    Remove Existing Septic Tank & Plug Lines     1 Each
    Demolish Existing Manhole & Plug Lines     1 Each
    Install 1500 Gal. Precast Equalization Basin and Reconnect Services     1 Each
    Quad Lift Station Complete with Valve Pit & Electrical (at Campground)     1 L.S.
    Quad Lift Station Complete with Valve Pit & Electrical (at Midway)     1 L.S.
    Bore or Trench 2" Dia. HDPE SDR 11 Forcemain     3,627 L.F.
    New RV Manhole & Connect to Services     1 Each
    8" Sanitary Sewer Lining OR Replace with 8" Dia. PVC SDR 35 OR Replace by Pipe Bursting     225 L.F.
    8" Dia. PVC SDR 35 Sewer Pipe     173 L.F.
    4" Dia PVC SDR 35 Sewer Pipe     250 L.F.
    Detectable Warning Tape, 3" Sewer     4,275 L.F.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MARION -- PROJECT # 10-05-63-01                4/19/2012                Large Project Letting
RED ROCK WMA
SWAN - DIKE AND CONTROL STRUCTURES
Proposal Guarantee: $5,000
Completion Date: 9/1/2012

   This project consists of the replacement of two CMP Water Control Structures, reconstruction of compacted earthfill dikes damaged by flooding and other related work as required by the Plans and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Removal/Disposal - Existing Structures     1 L.S.
    Excavation, Class 10 Borrow     11,186 C.Y.
    CMP Control Structure, Complete     2 Each
    Excavation, Channel     2,134 C.Y.
    Seeding, Fertilizing & Mulching     4 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




RINGGOLD -- PROJECT # 12-04-80-03                4/19/2012                Large Project Letting
KELLERTON WILDLIFE AREA
NEW HEADQUARTERS (REBID)
Proposal Guarantee: $10,000
Completion Date: 1/31/2013

   This project consists of the construction of a one story, pre-engineered structural insulated panel building with standing seam metal roofing and metal siding, approximately 50’ x 110’, including three heated bays, a mechanical/electrical room, two restrooms, a conference room, open office area, 4 offices, and a storage room. The work also includes concrete and class “A” crushed stone paving, septic sewer, water and electrical services. Project number 12-04-80-03.

ESTIMATED QUANTITIES:
    Earthwodk & all utilities     1 L.S.
    6" Class "A" crushed stone paving     1 L.S.
    Concrete sidewalk     1 L.S.
    50'-0" x 110'-0" SIPs building     1 L.S.
    Furnace HVAC system     1 L.S.
    Septic System     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LINN -- PROJECT # 12-06-57-01                5/17/2012                Large Project Letting
PLEASANT CREEK STATE REC AREA
NEW RESTROOM
Proposal Guarantee: $5,000
Completion Date: 11/15/2012

   Purchase and install a precast concrete toilet building near the east shelter in Pleasant Creek SRA. Work includes all site grading, crushed rock foundation, and sewer, water, and electric utility connections.

ESTIMATED QUANTITIES:
    NEW PRECAST TOILET BUILDING, CONNECTIONS, & SITE WORK     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SCOTT -- PROJECT # 12-06-82-01                5/17/2012                Large Project Letting
LOST GROVE LAKE WMA
CONCRETE BOX CULVERT INLET RISERS
Proposal Guarantee: $5,000
Completion Date: 9/15/2012

   This project consists of extending one concrete box culvert, constructing an inlet riser on two concrete box culverts, and incidental work as required by the Plans and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
North Branch 
    Excavation, Class 10, Roadway and Borrow     10 C.Y.
    Excavation, Class 10, Channel     45 C.Y.
    Structural Concrete (RCB Culvert)     18 C.Y.
    Reinforcing Steel, Epoxy Coated     1,770 LB.
    Construction Survey     1 L.S.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.
    Mulching     0.06 Acres
    Seeding and Fertilizing     0.06 Acres
    Silt Fence     50 L.F.
South Branch 
    Clearing and Grubbing     1 Units
    Embankment-In-Place     312 C.Y.
    Granular Shoulders, Type B     9 Tons
    Removal of Existing Structures     1 L.S.
    Excavation, Class 20     224 C.Y.
    Structural Concrete (RCB Culvert)     114 C.Y.
    Reinforcing Steel, Epoxy Coated     15,682 LB.
    Removal of Cable Guardrail     154 L.F.
    Construction Survey     1 L.S.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.
    Mulching     0.11 Acres
    Seeding and Fertilizing     0.11 Acres
    Silt Fence     74 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MONONA -- PROJECT # 10-01-67-02                4/26/2012                Small Project Letting
LEWIS AND CLARK PARK
PUMP STATION REPLACEMENT
Proposal Guarantee: $0
Completion Date: 7/27/2012

   Existing sanitary pump station rehabilitation including replacement of all pumps and accessories in the existing wet well and electrical service and controls as shown in the contract documents.

Contact:
Jeff Felts
515-250-3712
[email protected]




CLAY -- PROJECT # 12-01-21-01                5/17/2012                Small Project Letting
D.U. MARSH
REPAIR WATER CONTROL STRUCTURE
Proposal Guarantee: $0
Completion Date: 6/29/2012

   This project is designed to repair existing infrastructure that is failing and add a new tile outlet to increase the pool level at DU Marsh in Clay County. Work on this project includes but is not limited to 12” tile installation, replacement of a 64”x43” CMP arch pipe, and installation of a new Agri Drain Water Control Structure.

Contact:
Jeff Felts
515-250-3712
[email protected]




DICKINSON -- PROJECT # 12-01-30-06                5/17/2012                Small Project Letting
CLAIRE WILSON ACCESS
SIDEWALK REPAIR
Proposal Guarantee: $0
Completion Date: 6/29/2012

   This project is designed to repair a sidewalk that is failing do to undermining issues along a wooden sea wall at Claire Wilson Access on East Okoboji Lake, Dickinson County, IA. Work under this project involves removal and replacement of 152 SY of sidewalk, excavation, and rock backfill behind the sea wall.

Contact:
Jeff Felts
515-250-3712
[email protected]