PROJECTS LETTING -  April , 2014

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

BLACK HAWK 13-03-07-01 George Wyth State Park - Install Solar Lights @4 Ramps-2014-04-10   Bid Completion detail
DES MOINES 14-06-29-01 Geode - replace road culvert-2014-04-10   Bid Completion detail
LINN 13-06-57-06 Pleasant Creek Recreation Area - Shoreline Armoring-2014-04-10   Bid Completion detail
BOONE 13-02-08-04 Boone Fisheries Management Unit - OSHA UPDATES-2014-04-17   Bid Completion detail
DICKINSON 13-01-30-10 Iowa Great Lakes Area - 2014 Great Lakes Boat Ramp Repairs-2014-04-17   Bid Completion detail
DICKINSON 14-01-30-02 Spirit Lake Hatchery - Replace Backup Generator-2014-04-17   Bid Completion detail
FAYETTE 13-03-33-01 Volga River State Rec Area - Trailer Dump Station -2014-04-17   Bid Completion detail
FAYETTE 13-03-33-03 Volga River State Recreation Area - Boat Ramp Parking Lot-2014-04-17   Bid Completion detail
HENRY 14-06-44-02 Geode - Shoreline Armoring-2014-04-17   Bid Completion detail
JACKSON 13-06-49-01 Maquoketa Caves State Park - Design Guide Restroom & Pits-2014-04-17   Bid Completion detail
LINN 13-06-57-04 Pleasant Creek Recreation Area - demo old and install 3 new pit RR-2014-04-17   Bid Completion detail
MARION 14-05-63-02 Elk Rock State Park - PCC Roadway and Parking-2014-04-17   Bid Completion detail
SCOTT 14-06-82-03 Lost Grove Lake WMA - Shoreline Armoring and Sediment Pond-2014-04-17   Bid Completion detail
SCOTT 14-06-82-04 Lost Grove Lake WMA - Parking Lot Expansion-2014-04-17   Bid Completion detail
UNION 14-04-88-01 Other-Twelve Mile WMA - Twelve Mile WMA wetland-2014-04-17   Bid Completion detail
WASHINGTON 14-06-92-03 Lake Darling - Pump House-2014-04-17   Bid Completion detail
WEBSTER 13-02-94-03 Brushy Creek Recreation Area - Installation of Pre-Fab Bridge-2014-04-17   Bid Completion detail
GUTHRIE 14-04-39-04 Springbrook - new septic system for CEC shop-2014-05-01   Bid Completion detail
TAMA 14-05-86-02 Union Grove - Cabin Road-2014-05-01   Bid Completion detail
DICKINSON 15-01-30-02 Silver Lake WMA - Silver Lake Fen Wetland Repair -2014-05-08   Bid Completion detail




BOONE -- PROJECT # 13-02-08-04                4/17/2014                Large Project Letting
BOONE FISHERIES MANAGEMENT UNIT
OSHA UPDATES
Proposal Guarantee: $1,000
Completion Date: 8/1/2014

   The original building for Fisheries was built two years ago, since then a few issues with OSHA have arisen and need to be addressed. The partition wall between two spaces needs to be fire-rated and a ventilation requirement will be needed for the use of the building. Project number 13-02-08-04

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    NEW FIREWALL & FIRE RATED ASSEMBLIES     1 L.S.
    ELECTRICAL REWIRING AND POWER VENT     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 14-01-30-02                4/17/2014                Large Project Letting
SPIRIT LAKE HATCHERY
REPLACE BACKUP GENERATOR
Proposal Guarantee: $5,000
Completion Date: 8/1/2014

   CURRENT SPIRIT LAKE FISH HATCHERY HAS A GENERATOR THAT IS NO LONGER OPERATIONAL, THIS PROJECT WILL UPDATE ELECTRICAL CODE ISSUES, ELECTRICAL SERVICE AND PROVIDE A NEW BACKUP GENERATOR TO THE FACILITY.

ESTIMATED QUANTITIES:
    ELECTRICAL EQUIPMENT DEMOLITION (INCLUDES SITE DEMO)     1 L.S.
    NEW 120/208 3-PHASE ELECTRICAL SERVICE (INCLUDES NEW PAD FOR UTILITY TRANSFORMER, CT CABINET, AND METER)     1 L.S.
    NEW ELECTRICAL EQUIPMENT AND INSTALLATION     1 L.S.
    EMERGENCY LIGHTING (INCLUDES FIXTURES AND INSTALLATION)     1 L.S.
Alternate
    INSTALL NEW 150KW NATURAL GAS GENERATOR (INCLUDES SERVICE ENTRANCE RATED TRANSFER SWITCH AND SIGNAL LINE TO EXISTING PUMP HOUSE GENERATOR)     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




FAYETTE -- PROJECT # 13-03-33-03                4/17/2014                Large Project Letting
VOLGA RIVER STATE RECREATION AREA
BOAT RAMP PARKING LOT
Proposal Guarantee: $10,000
Completion Date: 6/13/2015

   This project consists of the removal and reconstruction of the parking lot and a portion of the boat ramp. This includes all earthwork and incidental work as required by the project documents and the IDNR inspector at Volga River State Recreation Area in Fayette County, Iowa.

ESTIMATED QUANTITIES:
    CLEARING AND GRUBBING     1 L.S.
    PARKING LOT, PCC, 6"     684.9 S.Y.
    CURB AND GUTTER, P.C. CONCRETE, 2.5 FT.     1,301.6 L.F.
    SIGNING     1 Each
    REMOVAL OF PAVEMENT     764.2 S.Y.
    REMOVAL OF INTAKE     4 Each
    REVETMENT, REMOVE AND REPLACE     1 L.S.
    STORM SEWER ABANDONMENT, FILL/PLUG, LESS THAN/EQUAL TO 36 IN. DIA.     12 L.F.
    GRANULAR SUBBASE     7,371.12 S.Y.
    SITE WORK     1 L.S.
    MANHOLE, STORM SEWER, SW-401, 48 IN.     1 Each
    STORM SEWER GRAVITY MAIN, TRENCHED, RCP, 2000D, 18 IN.     513.5 L.F.
    INTAKE, SW-501     1 Each
    INTAKE, SW-505     3 Each
    STC2400     1 Each
    APRONS, CONCRETE, 18 IN. DIA.     1 Each
    INTAKE, TRENCH DRAIN     58.44 L.F.
    REVETMENT, CLASS E     58 Tons
    EROSION CONTROL     800 L.F.
    PAINTED PAVEMENT MARKINGS, WATERBORNE/SOLVENT     21.1 STA.
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JACKSON -- PROJECT # 13-06-49-01                4/17/2014                Large Project Letting
MAQUOKETA CAVES STATE PARK
DESIGN GUIDE RESTROOM & PITS
Proposal Guarantee: $5,000
Completion Date: 9/26/2014

   DNR will be installing one new design guide flush restroom and septic system out of CMU, and installing three new HuffCutt pit latrines in the area shown in the day-camp.

ESTIMATED QUANTITIES:
    CLEARING AND GRUBBING     1 L.S.
    GRADING     1 L.S.
    SEEDING, FERTILIZING AND MULCHING     1 L.S.
    8" FILTER SOCK     110 L.F.
    GRANULAR BASE     18 Tons
    5" REINFORCED PCC SIDEWALK     71 S.Y.
    SANITARY SEWER, SEPTIC TANK, LEACH FIELD & APPURTBENCES     1 L.S.
    1" WATER SERVICE     194 L.F.
    1" CURB STOP     1 Each
    ELECTRICAL SERVICE TO BUILDING     1 L.S.
    CXT PRECAST RIGHT HANDED CASCADIAN VAULT BUILDINGS     3 Each
    DRAIN DOWN PIT     1 Each
    DESIGN GUIDE RESTROOM     1 L.S.
    MOBILIZATION     1 L.S.
    CONSTRUCTION STAKING     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LINN -- PROJECT # 13-06-57-04                4/17/2014                Large Project Letting
PLEASANT CREEK RECREATION AREA
DEMO OLD AND INSTALL 3 NEW PIT RR
Proposal Guarantee: $10,000
Completion Date: 11/1/2014

   This project consists of the demolition of 3 existing latrine buildings and their access sidewalks and installing 3 new CXT Vault Buildings (2 right-handed single cascadian and 1 double cascadian, or equivalents) with access sidewalks, and seeding/fertilizing/mulching all disturbed areas located at Pleasant Creek Recreation Area in Linn County, Iowa.

ESTIMATED QUANTITIES:
    Demolition     1 L.S.
    Grading     1 L.S.
    Precast Right Hand Single Vault Building With Solar Light     2 Each
    Precast Double Vault Building With Solar Light     1 Each
    Solar Tower     1 L.S.
    1-inch PE Water Service     97 L.F.
    1-inch Curb Stop     1 Each
    Yard Hydrant     1 Each
    5-inch Reinforced PCC Sidewalk     73 S.Y.
    Granular Base     13 Tons
    Seeding, Fertilizing and Mulching     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MARION -- PROJECT # 14-05-63-02                4/17/2014                Large Project Letting
ELK ROCK STATE PARK
PCC ROADWAY AND PARKING
Proposal Guarantee: $40,000
Completion Date: 9/2/2014

   This project consists of PCC Paving two parking lots and the access road.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Excavation, Class 10     2,355 C.Y.
    7" PCC      20,834 S.Y.
    Special Backfill     4,237 Tons
    Trench Drain     82 L.F.
    12" PVC Pipe     30 L.F.
    18" RCP     280 L.F.
    18" RCP Apron     1 Each
    6" Curb     273 L.F.
    SW-501 Manhole, Complete     4 Each
    Construction Staking     1 L.S.
    Pavement Striping     77.62 STA.
    Handicap Sign, Complete     5 Each
    Rigging Lane Sign, Complete     3 Each
    Remove and Replace Parking Bumpers     1 L.S.
    Granular Shoulders     246 Tons
    Earth Shoulders     1,924 L.F.
    Parking Posts     657 L.F.
    Cable Gate     1 Each
    Oil/Sand Separator     1 Each
    Site Restoration     1 L.S.
    18" CMP     40 L.F.
    18" Apron, Metal     2 Each
    5" PCC     9 S.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SCOTT -- PROJECT # 14-06-82-03                4/17/2014                Large Project Letting
LOST GROVE LAKE WMA
SHORELINE ARMORING AND SEDIMENT POND
Proposal Guarantee: $10,000
Completion Date: 8/15/2014

   This project consists of shoreline armoring and sediment pond construction

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    6" Trash Rack     1 Each
    6" SSP     77 L.F.
    Earthfill     9,427 C.Y.
    Class "E" Revetment     4,684 Tons
    Engineering Fabric     5,044 S.Y.
    Seeding, Fertilizing, and Mulching     3.4 Acres
    Clearing and Grubbing     5 Acres
    Anti-Seep Collars 48"x48"     3 Each
    3/8" Minus Crushed Stone     14 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SCOTT -- PROJECT # 14-06-82-04                4/17/2014                Large Project Letting
LOST GROVE LAKE WMA
PARKING LOT EXPANSION
Proposal Guarantee: $10,000
Completion Date: 9/15/2014

   This project consists of the construction of a concrete parking lot.

ESTIMATED QUANTITIES:
    Mobilzation     1 L.S.
    Excavation, Class 10     7,463 C.Y.
    Special Backfill     1,677 Tons
    7" PCC     5,304 S.Y.
    Striping     58.8 STA.
    Parking Posts     883 L.F.
    Clearing and Grubbing     1.8 Acres
    Seed and Fertilize     0.7 Acres
    Mulch     0.7 Acres
    Granular Shoulders     14 Tons
    Silt Fence     200 L.F.
    Keep Right Sign     1 Each
    Construction Staking     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




UNION -- PROJECT # 14-04-88-01                4/17/2014                Large Project Letting
OTHER-TWELVE MILE WMA
TWELVE MILE WMA WETLAND
Proposal Guarantee: $20,000
Completion Date: 10/1/2014

   CONSTRUCTION OF A RIP-RAP ROCK CHUTE FOR CREATION/ENHANCEMENT OF WETLAND AREA. THE PROJECT SHALL INCLUDE EARTHWORK AND IMPLEMENT CONCRETE GROUT, GEOTEXTILE FABRIC, CORRUGATED METAL PIPES, SEEDING, FERTILIZING, AND MULCHING

ESTIMATED QUANTITIES:
    EARTH FILL     8,415 C.Y.
    EXCAVATION     4,726 C.Y.
    Class "E" Rip-Rap     4,634 Tons
    Concrete Grout     927 C.Y.
    Geotextile     4,634 S.Y.
    Stop Log Riser     2 Each
    30" Dia. Corrugated Metal Pipe     152 L.F.
    Site Dewatering     1 L.S.
    Seed, Fertilize, & Mulch      1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WEBSTER -- PROJECT # 13-02-94-03                4/17/2014                Large Project Letting
BRUSHY CREEK RECREATION AREA
INSTALLATION OF PRE-FAB BRIDGE
Proposal Guarantee: $5,000
Completion Date: 11/1/2014

   This project consists of installing a new pre-fabricated equestrian bridge over the spillway, fence reconstruction, grading, seeding all disturbed areas located at Brushy Creek State Park in Webster County, Iowa.

ESTIMATED QUANTITIES:
    Clearing and Grubbing     1 L.S.
    Access Route     1 L.S.
    Class 'E' Riprap     15 Tons
    Grading     1 L.S.
    Contech Connector 75' Span x 10' Width Equestrian Bridge (or Equivalent)     1 L.S.
    Contech Precast Abutment System (or Equivalent)     1 L.S.
    Concrete Base With TS3x3x1/4 Galvanized Square Tubular Fence Post     4 Each
    Fence Reconstruction     1 L.S.
    Seeding, Fertilizing and Mulching     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BLACK HAWK -- PROJECT # 13-03-07-01                4/10/2014                Small Project Letting
GEORGE WYTH STATE PARK
INSTALL SOLAR LIGHTS @4 RAMPS
Proposal Guarantee: $0
Completion Date: 6/13/2014

   Project consists of furnishing & installing 4 solar lights at 4 boat ramp locations in G. Wyth SP, Blackhawk Co. Plans may be obtained by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




DES MOINES -- PROJECT # 14-06-29-01                4/10/2014                Small Project Letting
GEODE
REPLACE ROAD CULVERT
Proposal Guarantee: $0
Completion Date: 5/31/2014

   This project consists of replacing an existing road culvert and patching a small trench through HMA pavement.

Contact:
Heath Delzell
(515) 979-0104
heath.delzell@dnr.iowa.gov




LINN -- PROJECT # 13-06-57-06                4/10/2014                Small Project Letting
PLEASANT CREEK RECREATION AREA
SHORELINE ARMORING
Proposal Guarantee: $0
Completion Date: 5/31/2014

   This project involves constructino of shoreline armoring at Pleasant Creek SRA.

Contact:
Heath Delzell
(515) 979-0104
heath.delzell@dnr.iowa.gov




DICKINSON -- PROJECT # 13-01-30-10                4/17/2014                Small Project Letting
IOWA GREAT LAKES AREA
2014 GREAT LAKES BOAT RAMP REPAIRS
Proposal Guarantee: $0
Completion Date: 5/22/2014

   The scope of this project includes the removal and replacement of failed sections of concrete at 3 separate boat ramp sites in the Iowa Great Lakes area, Dickinson Co., IA. Site #1 - Tri Boji Access involves removal and replacement of a boat ramp section and some adjacent sidewalk. Site #2 - Marble Beach Access involves removal and replacement of a boat ramp section and installation of Rip Rap protection. Site #3 - Mini Wakan Access involves removal and replacement of a section of walk between the two ramps.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




FAYETTE -- PROJECT # 13-03-33-01                4/17/2014                Small Project Letting
VOLGA RIVER STATE REC AREA
TRAILER DUMP STATION
Proposal Guarantee: $0
Completion Date: 6/13/2014

   Project consists of constructing new trailer dump station at Volga River SRA Campground and connecting same to existing water & sewer lines. Dump station will placed in an existing drive thru and will require removal & replacement of concrete. Plans may be obtained by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




HENRY -- PROJECT # 14-06-44-02                4/17/2014                Small Project Letting
GEODE
SHORELINE ARMORING
Proposal Guarantee: $0
Completion Date: 6/30/2014

   This project consists of armoring approximately 983 feet of shoreline with riprap.

Contact:
Heath Delzell
(515) 979-0104
heath.delzell@dnr.iowa.gov




WASHINGTON -- PROJECT # 14-06-92-03                4/17/2014                Small Project Letting
LAKE DARLING
PUMP HOUSE
Proposal Guarantee: $0
Completion Date: 6/30/2014

   This project consists of furnishing and installing a precast concrete utility building, complete with booster pump, pressure tanks, and controls at Lake Darling State Park in Washington County, Iowa.

Contact:
Heath Delzell
(515) 979-0104
heath.delzell@dnr.iowa.gov




GUTHRIE -- PROJECT # 14-04-39-04                5/1/2014                Small Project Letting
SPRINGBROOK
NEW SEPTIC SYSTEM FOR CEC SHOP
Proposal Guarantee: $0
Completion Date: 6/30/2014

   THIS PROJECT CONSIST OF INSTALLING A NEW 1250 GALLON SEPTIC TANK AND A 88 FT. LONG CHAMBER LEACH FIELD FOR AN EXISTING OFFICE/SHOP FACILITY AT SPRINGBROOK STATE PARK.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




TAMA -- PROJECT # 14-05-86-02                5/1/2014                Small Project Letting
UNION GROVE
CABIN ROAD
Proposal Guarantee: $0
Completion Date: 10/15/2014

   This project consists of construction of a PCC roadway 260' in length and a 117 SY parking lot constructed of porous concrete. The work period for this project is September 15 - October 15, 2014. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




DICKINSON -- PROJECT # 15-01-30-02                5/8/2014                Small Project Letting
SILVER LAKE WMA
SILVER LAKE FEN WETLAND REPAIR
Proposal Guarantee: $0
Completion Date: 6/20/2014

   This project is designed repair elements of an existing wetland dike located on the Silver Lake Fen WMA in Dickinson County, Iowa. Specific repairs include tree stump removal, removal of the existing water control structures, installation of earth fill, excavation of an emergency spillway, and installation of a new agridrain water control structure

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov