PROJECTS LETTING -  April , 2017

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

BLACK HAWK 17-03-07-03 George Wyth State Park - Repair Flood Damaged Campground Electric-2017-04-06   Bid Completion detail
ALLAMAKEE 18-03-03-05 Heytman's Landing Boat Ramp - Boat Ramp Maneuver Area Sediment Cleanout -2017-04-13   Bid Completion detail
JASPER 16-05-50-01 Rock Creek State Park - Boat Ramp Repairs-2017-04-13   Bid Completion detail
LUCAS 17-05-59-05 Colyn Shop - Concrete Work-2017-04-13   Bid Completion detail
WOODBURY 18-01-97-01 Weedland River Access - Weedland River Access Rock Surfacing-2017-04-13   Bid Completion detail
APPANOOSE 16-05-04-05 Honey Creek Resort State Park - Stormwater Project-2017-04-20   Bid Completion detail
HARDIN 17-02-42-03 Pine Lake State Park - Fireplace Repair-2017-04-20   Bid Completion detail
HENRY 17-06-44-01 Geode - CCC SHELTER RESTORATION-2017-04-20   Bid Completion detail
JOHNSON 15-06-52-06 Hawkeye Wildlife Management - Septic System-2017-04-20   Bid Completion detail
JONES 16-06-53-01 Central Park Lake - Mechanical Dredging & Shoreline Armoring-2017-04-20   Bid Completion detail
JONES 16-06-53-01 Central Park Lake - Mechanical Dredging & Shoreline Armoring-2017-04-20   Bid Completion detail
LINN 17-06-57-02 Palisades-Kepler State Park - Campground Electrical Upgrade-2017-04-20   Bid Completion detail
MONONA 17-01-67-01 Missouri River Wildlife Unit - Upper Decatur Bend WMA Boat Ramp-2017-04-20   Bid Completion detail
WOODBURY 17-01-97-01 Stone State Park - Stone Park Multiple Roof Shingle Replacement-2017-04-27   Bid Completion detail
DECATUR 17-05-27-01 Little River Recreation Area - Pit Vault Restroom-2017-05-04   Bid Completion detail




APPANOOSE -- PROJECT # 16-05-04-05                4/20/2017                Large Project Letting
HONEY CREEK RESORT STATE PARK
STORMWATER PROJECT
Proposal Guarantee: $5,000
Completion Date: 8/31/2017

   The purpose of this project is to install a curb, gutter and stormwater intake system along the existing road; install a pcc culvert riser to an existing culvert; install rock lined chutes; install granular shoulders; and place shoreline armoring at the boat ramp area.

ESTIMATED QUANTITIES:
    2' Curb and Gutter     333 L.F.
    SW-501 Manhole #1     1 Each
    SW-501 Manhole #2     1 Each
    SW-501 Manhole #3     1 Each
    18" RCP Storm Sewer     128 L.F.
    18" RCP Apron w/ Footing     2 Each
    Granular Shoulder     34 Tons
    Erosion Stone     104 Tons
    Revetment, Class E     1,788 Tons
    Engineering Fabric     1,935 S.Y.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HARDIN -- PROJECT # 17-02-42-03                4/20/2017                Large Project Letting
PINE LAKE STATE PARK
FIREPLACE REPAIR
Proposal Guarantee: $2,500
Completion Date: 2/28/2018

   Pine Lake State Park Cabins are some of the most iconic cabins in the entire Iowa State Park system. Build by the CCC, these cabins are unique and special. The fireplace and chimney of these cabins are in need of repair and the firebox, because they are too large, need to be reduced. Being sensitive to the historic and architectural style, the reduction of the fireboxes will be done with the utmost care and will utilize historic stone on site. Also a new concrete chimney liner, firebox brick and restoration of the mantel and hearth area will take place, extending the life of these amazing cabins.

ESTIMATED QUANTITIES:
    DEMOLITION (EXISTING LINER, FIREBOX, STONE, DAMPER, ETC.)     1 L.S.
    REPOINTING CHIMNEY/HEARTH AND REPLACEMENT STONES     4 Each
    INSTALL OF NEW FIREBOX     4 Each
    NEW CONCRETE CHIMNEY LINER AND DAMPER     4 Each
    CLEANING OF CHIMNEY STRUCTURE     4 Each
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HENRY -- PROJECT # 17-06-44-01                4/20/2017                Large Project Letting
GEODE
CCC SHELTER RESTORATION
Proposal Guarantee: $2,500
Completion Date: 9/1/2017

   Geode State Park CCC Shelter is a structure which has major architectural significance. This shelter had been closely replicated by the CCC throughout the State of Iowa in many CCC parks becoming an icon for State Parks in Iowa. Restoration of this structure will include removal of roof, some deteriorated roof decking and purlins, all building columns and cob blasting and restoring all wood. Replacement of wood products with like hardwood of same dimensions. All masonry to be cleaned and tuckpointed, replace the fire-box in both fireplaces with fire-brick, sand-blast and paint hood on interior fireplace. Alternates will include a huffcutt pit-latrine, ADA parking area and sidewalk, and restoration of the existing CCC restroom building.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    CCC SHELTER RESTORATION AND CONCRETE SLAB REPLACEMENT     1 L.S.
    MOBILIZATION     1 L.S.
Alternate
    5" REINFORCED PCC SIDEWALK & GRANULAR SUBBASE (SHELTER)     960 S.F.
Alternate
    6" REINFORCED PCC PARKING AREA WITH ALL ASSOCIATED ITEMS     1 L.S.
Alternate
    5" REINFORCED PCC SIDEWALK & GRANULAR SUBBASE (LATRINE)     270 S.F.
Alternate
    PRECAST 1-HOLE PIT LATRINE     1 Each
    CCC RESTROOM RESTORATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JONES -- PROJECT # 16-06-53-01                4/20/2017                Large Project Letting
CENTRAL PARK LAKE
MECHANICAL DREDGING & SHORELINE ARMORING
Proposal Guarantee: $60,000
Completion Date: 3/15/2018

   This project consists of mechanically dredging approximately 100,000 CY of deposited sediment and native soils, armoring 8,129 LF of shoreline with rock revetment, replace the principal RCP spillway, and replace a CMP water control structure.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Stabilizing Crop Seeding and Fertilizing     18 Acres
    Seeding and Fertilizing     18 Acres
    Tile Investigation     80 L.F.
    8" Perf HDPE Tile     2,999 L.F.
    8" Tile Intake     11 Each
    Tile Outlet     5 Each
    6" Triple Wall HDPE     86 L.F.
    Traffic Control     1 L.S.
    Revetment, Class E     10,931.5 Tons
    Shot Rock     2,535 Tons
    Porous Backfill     11 Tons
    Porous Backfill (Pea Gravel)     560 Tons
    Fine Drainfill (Sand)     612 Tons
    Granular Backfill     159 Tons
    Engineering Fabric     16,652 S.Y.
    7" PCC     391 S.Y.
    Structural Concrete     76 S.Y.
    Earth Shoulder     320 L.F.
    Pavement Removal     467 S.Y.
    Excavation, Class 10 (Main Lake)     98,000 C.F.
    Excavation, Class 10 (Upper End)     5,000 C.F.
    Earthfill (Habitat Mounds)     2,180 C.Y.
    Earthfill (Spillway Replacement)     2,300 C.F.
    Narrow Base Terrace     2,740 L.F.
    36" Dia Smooth Steel Pipe (SSP)     173 L.F.
    12" RCP, 2000D     60 L.F.
    SSP Footing     1 Each
    72" Dia Sanitary Sewer Manhole     1 Each
    72" Dia Trash Rack     1 Each
    12" x 12" Sluice Gate     1 Each
    36" Dia CMP     56 L.F.
    36" Dia CMP Aprons     2 Each
    Silt Fence     4,151 L.F.
    Misc. Excavator Work     24 HR.
Alternate No. 1 
Alternate
    Excavation, Class 10     22,000 C.Y.
Alternate No. 2 
Alternate
    Excavation, Class 10     10,000 C.Y.
Alternate No. 3 
Alternate
    Excavation, Class 10     15,000 C.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LINN -- PROJECT # 17-06-57-02                4/20/2017                Large Project Letting
PALISADES-KEPLER STATE PARK
CAMPGROUND ELECTRICAL UPGRADE
Proposal Guarantee: $7,000
Completion Date: 3/15/2018

   The project consists of upgrading the electrical wiring and pedestals to 50 Amp. service, resurfacing of the pads and removal of edging on the pads and other miscellaneous improvements as described in the project's plans and specifications.

ESTIMATED QUANTITIES:
 
    MOBILIZATION     1 L.S.
    TRENCH, SINGLE CIRCUIT SECONDARY     2,070 L.F.
    DETECTABLE WARNING TAPE, 3" ELECTRICAL     2,070 L.F.
    ROADWAY CROSSING CONDUIT - SCHEDULE 80 PVC     130 L.F.
    SINGLE CAMPSITE OUTLET POST (METALIC POWER CENTER) 50 AMP     31 Each
    No. 8 AWG GROUNDING CONDUCTOR CABLE. TYPE THW OR USE     262 L.F.
    No. 6 AWG GROUNDING CONDUCTOR CABLE. TYPE THW OR USE     735 L.F.
    No. 4 AWG GROUNDING CONDUCTOR CABLE. TYPE THW OR USE     453 L.F.
    No. 2 AWG GROUNDING CONDUCTOR CABLE. TYPE THW OR USE     1,083 L.F.
    No. 3 AWG SINGLE CONDUCTOR CABLE, TYPE USE     678 L.F.
    No. 2 AWG SINGLE CONDUCTOR CABLE, TYPE USE     786 L.F.
    No. 1 AWG SINGLE CONDUCTOR CABLE, TYPE USE     930 L.F.
    No. 1/0 AWG SINGLE CONDUCTOR CABLE, TYPE USE     597 L.F.
    No. 3/0 AWG SINGLE CONDUCTOR CABLE, TYPE USE     2,217 L.F.
    No. 4/0 AWG SINGLE CONDUCTOR CABLE, TYPE USE     537 L.F.
    No.250 AWG SINGLE CONDUCTOR CABLE, TYPE USE     516 L.F.
    No. 300 AWG SINGLE CONDUCTOR CABLE, TYPE USE     1,338 L.F.
    REPLACE OLD PANEL WITH NEW 600 AMP DISTRIBUTION PANEL, COMPLETE     1 Each
    REPLACE DRINKING FOUNTAIN INCLDG. CONCRETE BASE WITH HAWS PEDESTAL MODEL 3202G     2 Each
Alternate
    EARTHFILL     39 C.Y.
Alternate
    GRANULAR SURFACING, 3/8 INCH MINUS CRUSHED LIME STONE (2" DEPTH)     558 Tons
Alternate
    6-INCH 140 PCF GRANULAR BASE     22 Tons
Alternate
    6-INCH NON-REINFORCHED ACC     71 S.Y.
Alternate
    REMOVE RAILROAD TIE EDGING & FILL VOID WITH 3/8 INCH MINUS CRUSHED LIME STONE     38 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MONONA -- PROJECT # 17-01-67-01                4/20/2017                Large Project Letting
MISSOURI RIVER WILDLIFE UNIT
UPPER DECATUR BEND WMA BOAT RAMP
Proposal Guarantee: $5,000
Completion Date: 6/1/2018

   This project involves construction of a boat ramp 160 feet in length into the Missouri River at Upper Decatur Bend. This will include excavation and grading, placing riprap revetment, and other incidental work as required by the DNR construction inspector.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    6" STRUCTURAL CONCRETE, CLASS "C" MIX     249 S.Y.
    REVETMENT, CLASS "E" RIPRAP     933 Tons
    CLASS "A" CRUSHED STONE     78 Tons
    MACADAM STONE     73 Tons
    EXCAVATION, CLASS 13     1,609 C.Y.
    SITE RESTORATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BLACK HAWK -- PROJECT # 17-03-07-03                4/6/2017                Small Project Letting
GEORGE WYTH STATE PARK
REPAIR FLOOD DAMAGED CAMPGROUND ELECTRIC
Proposal Guarantee: $0
Completion Date: 5/1/2017

   This project consists cleaning and replacing outlets & breakers in 46 camp power pedestals and raising, cleaning,& replacing like distribution breakers and installing new conduit and copper wiring feeds from Mid-American Energy transformer to two (2) 600amp main breaker panels at G. Wyth State Park, Waterloo, Iowa. Proposal may be obtain by e-mailing, name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




ALLAMAKEE -- PROJECT # 18-03-03-05                4/13/2017                Small Project Letting
HEYTMAN'S LANDING BOAT RAMP
BOAT RAMP MANEUVER AREA SEDIMENT CLEANOUT
Proposal Guarantee: $0
Completion Date: 6/30/2017

   Project consists of removal and off-site disposal of sediment in the boat ramp maneuvering area, an area approximately 100' X 60', and the channel from maneuver area to railroad bridge to a desired depth of 5' at normal Mississippi River levels. Proposal may be obtained by e-mailing name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




JASPER -- PROJECT # 16-05-50-01                4/13/2017                Small Project Letting
ROCK CREEK STATE PARK
BOAT RAMP REPAIRS
Proposal Guarantee: $0
Completion Date: 6/15/2017

   This project includes placing articulated concrete blocks at the ends of boat ramps, underwater, to extend boat ramps to deeper water. Also, minor concrete work such as sidewalks and placing riprap to protect boat ramps. Send an email to request plans. Estimate is $49,557.60.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




LUCAS -- PROJECT # 17-05-59-05                4/13/2017                Small Project Letting
COLYN SHOP
CONCRETE WORK
Proposal Guarantee: $0
Completion Date: 6/30/2017

   This project consists of pouring two concrete slabs, 19.5 CY and 5.3 CY. Send an email to request plans. Estimate is $11,270.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




WOODBURY -- PROJECT # 18-01-97-01                4/13/2017                Small Project Letting
WEEDLAND RIVER ACCESS
WEEDLAND RIVER ACCESS ROCK SURFACING
Proposal Guarantee: $0
Completion Date: 6/23/2017

   This project is designed to add Class "A" granular surfacing to an existing entrance road and parking area at the Weedland River Access in Woodbury County, Iowa. Work under this project includes some minor grading/surface leveling of the existing access and installation of 3" of Class "A" granular material with proper slopes for drainage.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




JOHNSON -- PROJECT # 15-06-52-06                4/20/2017                Small Project Letting
HAWKEYE WILDLIFE MANAGEMENT
SEPTIC SYSTEM
Proposal Guarantee:
Completion Date: 6/30/2017

   This project includes removal of existing septic tanks and installation of a new septic system including a 1,500 gal septic tank, 540 LF of 4" sanitary sewer service, and an absorption field at 2564 Amana Road NW, Swisher, Iowa within the Hawkeye Wilidlife Management Area. Cost estimate is $38,000.

Contact:
Michael Dufoe

Michael.dufoe@dnr.iowa.gov




WOODBURY -- PROJECT # 17-01-97-01                4/27/2017                Small Project Letting
STONE STATE PARK
STONE PARK MULTIPLE ROOF SHINGLE REPLACEMENT
Proposal Guarantee: $0
Completion Date: 5/23/2018

   The scope of this project includes the removal and replacement of approximately 3,850 square feet of asphalt shingle roof on 3 separate structures located in Stone State Park, Woodbury County, IA. Work will include removal of all existing roof surfacing, replacement of any deteriorated roof sheeting, and installation of new asphalt shingle roofing and associated flashings. Call or e-mail Jeff for a project packet.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




DECATUR -- PROJECT # 17-05-27-01                5/4/2017                Small Project Letting
LITTLE RIVER RECREATION AREA
PIT VAULT RESTROOM
Proposal Guarantee: $0
Completion Date: 9/15/2017

   Install precast concrete pit vault restroom at south boat ramp at Little River Recreation Area in Decatur County, Iowa. Send an email to request plans. Estimate is $32,880.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov