PROJECTS LETTING -  April , 2013

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

CERRO GORDO 12-03-17-04 Bayside Lake Patrol Statiion - Bayside Fueling Station-2013-04-04   Bid Completion detail
DICKINSON 14-01-30-01 Welsh Lake WPA - DOT Wetland Mitigation - Lago Site #2 Channel-2013-04-11   Bid Completion detail
CASS 13-04-15-01 SW Regional Office, Lewis - Office remodel/addition-2013-04-18   Bid Completion detail
JACKSON 12-06-49-03 Green Island - Channel Clean Out-2013-04-18   Bid Completion detail
JOHNSON 09-06-52-08 Hawkeye Wildlife Management Area - Scour Hole Repair-2013-04-18   Bid Completion detail
LUCAS 12-05-59-04 Chariton Research Station - Parking Lot Paving-2013-04-18   Bid Completion detail
LUCAS 13-05-59-02 Williamson Pond - Boat Ramp-2013-04-18   Bid Completion detail
MARSHALL 13-05-64-01 Hendrickson Marsh - Outlet Repair-2013-04-18   Bid Completion detail
GUTHRIE 13-04-39-06 Springbrook - Ed. Center water system repair-2013-04-23   Bid Completion detail
FREMONT 13-04-36-03 Other - Riverton WMA - Riverton WMA - Channel Cleanout-2013-04-25   Bid Completion detail
JOHNSON 12-06-52-01 Lake Macbride State Park - Universally accessible path-2013-04-25   Bid Completion detail
POLK 12-05-77-17 State Fair Building - Chiller -2013-04-25   Bid Completion detail
POLK 14-05-77-03 State Fair DNR Building - Building Renovations-2013-05-01   Bid Completion detail
UNION 12-04-88-01 Green Valley State Park - Trail construction-2013-05-01   Bid Completion detail
APPANOOSE 14-05-04-01 Sedan Bottoms - Stoplog Structure-2013-05-02   Bid Completion detail
CERRO GORDO 13-03-17-01 Ventura Marsh WMA - Construct Sediment Basins-2013-05-02   Bid Completion detail
WINNESHIEK 13-03-96-02 Decorah Fisheries Management Unit - Coldwater Cr habitat improvemen-2013-05-02   Bid Completion detail




CASS -- PROJECT # 13-04-15-01                4/18/2013                Large Project Letting
SW REGIONAL OFFICE, LEWIS
OFFICE REMODEL/ADDITION
Proposal Guarantee: $10,000
Completion Date: 12/31/2013

   This project will accommodate the growing staff at the new centralized SW Regional office. Fisheries & Wildlife currently have offices in this building and will be joined by Parks staff. The existing building will remain and a new 1,000 sf addition will house two new open offices (2 staff each), one conference/break room (12 person) and a new restroom. The existing building will have two offices converted into a modern laboratory with fume hood. The exterior of the building will mimic the original construction and site will be minimally disturbed.

ESTIMATED QUANTITIES:
    DEMOLITION (INCLUDES SITE RESTORATION)     1 L.S.
    CLEARING AND GRUBBING     1 L.S.
    ON-SITE TOPSOIL (STRIP, SALVAGE & RESPREAD)     25 C.Y.
    EXCAVATION CLASS 10     1 L.S.
    SANITARY SERVICE     1 Each
    4" PCC SIDEWALK     19 S.Y.
    CONVENTIONAL SEEDING (URBAN)     0.1 Acres
    12" FILTER SOCK     100 L.F.
    COONSTRUCTION STAKING     1 L.S.
    NEW ADDITION AND INTERIOR RENOVATION OF EXISTING BUILDING AND ALL COMPONENTS     1 L.S.
ALTERNATE#1 
Alternate
    REMOVE AND REPLACE SIDING WITH CEMENT BOARD SIDING ON EXISTING BUILDING     1 L.S.
ALTERNATE#2 
Alternate
    REMOVE AND REPLACE ALL WINDOWS ON EXISTING BUILDING NOT COVERED IN THE BASE BID     1 L.S.
ALTERNATE#3 
Alternate
    REMOVE AND REPLACE VINYL FLOOR AND RUBBER BASE IN EXISTING BUILDING WITH SPECIFIED FLOOR COVERING     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JACKSON -- PROJECT # 12-06-49-03                4/18/2013                Large Project Letting
GREEN ISLAND
CHANNEL CLEAN OUT
Proposal Guarantee: $5,000
Completion Date: 9/30/2013

   Project Description: Clean out boat access channel over an approximate distance of 9,100 feet, from Blake's Lake boat ramp to the outlet structure on the Mississippi River levy. Dig channel to elevation 581 (avg. depth of 2.5 feet as constructed) with a 10 foot bottom and 2 to 1 side slopes. A new 2,000 foot channel will be constructed into Blake's Lake from the existing channel.

ESTIMATED QUANTITIES:
 
    Mobilization     1 L.S.
    Channel Excavation (Approx. 11,100 LF)     1 L.S.
    Seeding     1 L.S.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POLK -- PROJECT # 14-05-77-03                5/1/2013                Large Project Letting
STATE FAIR DNR BUILDING
BUILDING RENOVATIONS
Proposal Guarantee: $5,000
Completion Date: 7/31/2013

   Considerable damage has occurred to the brick of the shell structure at the Iowa DNR building. This is primarily caused by poor water management, the roof has leaked and will continue to leak as it is not properly maintained and infrequently used. Also, security issues over the past couple of State Fairs have lead to the need for better lighting around the building at night. The restroom is also not functional nor ADA compliant, we will be updating the restroom to code compliance. New LED site lighting will be used to brighten the area and help with security issues. The roof will be removed and a new fully-adhered EPDM roof will be placed instead, halting the continual deterioration of the building.

ESTIMATED QUANTITIES:
    NEW FULLY-ADHERED EPDM ROOFING AND ALL ASSOCIATED EQUIPMENT AND MISC. ITEMS     1 L.S.
    NEW SECURITY LIGHTS AND POLE BASES AND ALL ASSOCIATED EQUIPMENT     1 L.S.
    RESTROOM RENOVATION AND ALL ASSOCIATED EQUIPMENT AND FIXTURES     1 L.S.
    COMPLETE DEMO OF ROOF, RESTROOM AND ELECTRICAL     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




UNION -- PROJECT # 12-04-88-01                5/1/2013                Large Project Letting
GREEN VALLEY STATE PARK
TRAIL CONSTRUCTION
Proposal Guarantee: $30,000
Completion Date: 12/1/2013

   This project consists of installing an 8-foot wide concrete recreational trail around the eastern side of the lake with a granular sub-base and will require clearing, grading, culvert pipes, seeding/fertilizing/mulching disturbed areas and highway signage.

ESTIMATED QUANTITIES:
    Clearing and Grubbing      1 L.S.
    Grading     1 L.S.
    Seeding, Fertilizing and Mulching     1 L.S.
    8-inch Filter Sock     750 L.F.
    Granular Base     4,708 Tons
    5" PCC Pavement     15,067 S.Y.
    12" ADS Pipe     180 L.F.
    15" ADS Pipe     960 L.F.
    18" ADS Pipe     62 L.F.
    24" ADS Pipe     20 L.F.
    18" ADS Coupler Pipe Part #1868AG     3 Each
    24" ADS Coupler Pipe Part #2468AG     1 Each
    48" RCP Class III     46.5 L.F.
    48" 60 Degree RCP Fabricated Bends Type III     2 Each
    Class ‘E’ Riprap     65 Tons
    PCC Sidewalk Removal     10.7 S.Y.
    Concrete Pipe Bollards     7 Each
    Precast Concrete Parking Wheel Stops     10 Each
    Highway Bicycle Traffic Signage     1 L.S.
    Traffic Control     1 L.S.
    Construction Staking     1 L.S.
    NPDES Permit & SWPPP     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CERRO GORDO -- PROJECT # 12-03-17-04                4/4/2013                Small Project Letting
BAYSIDE LAKE PATROL STATIION
BAYSIDE FUELING STATION
Proposal Guarantee:
Completion Date: 5/17/2013

   Project consists of providing a 500 gallon fire guard tank with hose reel platform on a concrete slab including a roof & fenced enclosure. Tank accessories shall include overfill valve, tank gauge, PV vents, emergency vents, fill containment, fill cap & adaptor, and interstical gauge. Hose reels shall be equiped with 125' 3/4" hose with 3/4" hose swivels & nozzel. Project shall be complete including electrical hookup, painting, decals & signage, and environmental work required by the State Fire Marshall. Project shall be completed by Iowa certified fuel tank installers. An onsite pre-bid viewing will be held at the Bayside DNR Patrol Facility located at 15398 Crane Street, Clear Lake, IA, 10AM March 28, 2013.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




DICKINSON -- PROJECT # 14-01-30-01                4/11/2013                Small Project Letting
WELSH LAKE WPA
DOT WETLAND MITIGATION - LAGO SITE #2 CHANNEL
Proposal Guarantee: $0
Completion Date: 6/21/2013

   This project is designed to serve as a water outlet area for a future DOT wetland mitigation project in the Welsh Lake wildlife area. Work under this project includes excavation of 1,139 ft of channel, 290 ft of 8" tile installation, tile breaks, and erosion control measures.

Contact:
Jeff Felts

[email protected]




JOHNSON -- PROJECT # 09-06-52-08                4/18/2013                Small Project Letting
HAWKEYE WILDLIFE MANAGEMENT AREA
SCOUR HOLE REPAIR
Proposal Guarantee: $0
Completion Date: 5/15/2013

   This project consists of repairing a scour hole with broken concrete and incidental work as required by the DNR construction inspector.

Contact:
Bruce Flippin

[email protected]




LUCAS -- PROJECT # 12-05-59-04                4/18/2013                Small Project Letting
CHARITON RESEARCH STATION
PARKING LOT PAVING
Proposal Guarantee: $0
Completion Date: 8/31/2013

   This project consists of the construction of a concrete (PCC) parking lot to serve the needs of the Chariton Research Facility.

Contact:
Jason Kruse

[email protected]




LUCAS -- PROJECT # 13-05-59-02                4/18/2013                Small Project Letting
WILLIAMSON POND
BOAT RAMP
Proposal Guarantee: $0
Completion Date: 10/31/2013

   This project consists of the construction of a concrete boat ramp and rock surfacing of an adjacent parking lot.

Contact:
Jason Kruse

[email protected]




MARSHALL -- PROJECT # 13-05-64-01                4/18/2013                Small Project Letting
HENDRICKSON MARSH
OUTLET REPAIR
Proposal Guarantee: $0
Completion Date: 7/31/2013

   This project consists of placement of riprap with revetment grout at the outlet of the spillway.

Contact:
Jason Kruse

[email protected]




GUTHRIE -- PROJECT # 13-04-39-06                4/23/2013                Small Project Letting
SPRINGBROOK
ED. CENTER WATER SYSTEM REPAIR
Proposal Guarantee: $0
Completion Date: 5/3/2013

   This project consists of abandoning an existing underground pressure tank, installing three pressure tanks and associated controls.

Contact:
Mark Johnson
515-250-3713
[email protected]




FREMONT -- PROJECT # 13-04-36-03                4/25/2013                Small Project Letting
OTHER - RIVERTON WMA
RIVERTON WMA - CHANNEL CLEANOUT
Proposal Guarantee: $0
Completion Date: 7/26/2013

   Remove sediment 2' deep and 25' wide from 4300' of channel placing and shaping spoil material on one side and 2' deep and 50' wide from 2000' of channel placing and shaping spoil on both sides. Site restoration required for areas above normal water levels.

Contact:
Mark Johnson
515-250-3713
[email protected]




JOHNSON -- PROJECT # 12-06-52-01                4/25/2013                Small Project Letting
LAKE MACBRIDE STATE PARK
UNIVERSALLY ACCESSIBLE PATH
Proposal Guarantee: $0
Completion Date: 5/31/2013

   Construct approximately 828' of handicap accessible trail along the west side of the causeway road. 200' will consist of 5' wide 5" PCC with 1 bumpout, and 628' will be 5' wide granular material. [email protected]

Contact:
Heath Delzell

[email protected]




POLK -- PROJECT # 12-05-77-17                4/25/2013                Small Project Letting
STATE FAIR BUILDING
CHILLER
Proposal Guarantee: $0
Completion Date: 6/15/2013

   This project consists of installation of a water chiller, heat exchanger, and power supply at the DNR Building on the Iowa State Fairgrounds. A Pre-Bid Meeting will be held at the DNR Building on the State Fairgrounds at 10:00am, Monday, April 22, 2013. Attendance is not mandatory to bid but is recommended so that contractors can make themselves familiar with the scope of work. Call Jason Kruse at the number given if you are not able to make the meeting so that an alternate time can be arranged.

Contact:
Jason Kruse

[email protected]




APPANOOSE -- PROJECT # 14-05-04-01                5/2/2013                Small Project Letting
SEDAN BOTTOMS
STOPLOG STRUCTURE
Proposal Guarantee: $0
Completion Date: 8/31/2013

   This project consists of installation of a stoplog structure for water control. The structure is made of 36" diameter smooth metal pipe with a 48" diameter smooth metal pipe riser. Please send an email to [email protected] to request plans. Plans are not distributed by Beeline & Blue for this project.

Contact:
Jason Kruse

[email protected]




CERRO GORDO -- PROJECT # 13-03-17-01                5/2/2013                Small Project Letting
VENTURA MARSH WMA
CONSTRUCT SEDIMENT BASINS
Proposal Guarantee: $0
Completion Date: 7/19/2013

   Project consists of excavating two (2) sediment basins in the SW corner if Ventura Marsh WMA. Excavated material to be placed in a designated spoil area. Spoil area will be seeded with a stabilizing crop seeding.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




WINNESHIEK -- PROJECT # 13-03-96-02                5/2/2013                Small Project Letting
DECORAH FISHERIES MANAGEMENT UNIT
COLDWATER CR HABITAT IMPROVEMEN
Proposal Guarantee: $0
Completion Date: 9/13/2013

   Project consists of trout habitat improvement on 10 locations on Coldwater Cr., shaping & stabilizing stream banks, installing bank hides, root balls, J-Hook weirs, providing angling access, and seeding disturbed areas.

Contact:
Mel Pacovsky
319-240-3553
[email protected]