PROJECTS LETTING -  April , 2016

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

CLAY 16-01-21-02 Prairie Lakes Wildlife Headquarters - Prairie Lakes Wildlife HQ Building Pad Grading & Electrical-2016-04-21   Bid Completion detail
LINN 15-06-57-03 Pleasant Creek State Recreation Area - Shoreline Stabilization - Contract-2016-04-21   Bid Completion detail
LINN 15-06-57-03 Pleasant Creek State Recreation Area - Shoreline Stabilization-2016-04-21   Bid Completion detail
MONONA 13-01-67-02 Lewis and Clark - Water Treatment System Replacement-2016-04-21   Bid Completion detail
POLK 16-05-77-06 DNR Fair Building - Phase III Renovations-2016-04-21   Bid Completion detail
SAC 13-01-81-06 Black Hawk Marsh WMA - Inlet Dredging-2016-04-21   Bid Completion detail
TAMA 14-05-86-03 Union Grove - Hydraulic Dredging-2016-04-21   Bid Completion detail
APPANOOSE 15-05-04-10 Stephens State Forest, Unionville Unit - Pond Spillway Repair-2016-04-28   Bid Completion detail
CERRO GORDO 16-03-17-04 Lekwa Marsh, Clear Lake State Park - Lekwa Access Development-2016-04-28   Bid Completion detail
CLAY 16-01-21-03 Prairie Lakes Wildlife Unit Headquarters - Prairie Lakes Wildlife HQ - Storage Building Relocation-2016-04-28   Bid Completion detail
FREMONT 16-04-36-02 Nishnabotna Wildlife Unit - Riverton Dike Fix-2016-04-28   Bid Completion detail
WASHINGTON 15-06-92-07 Lake Darling State Park - Cabin Road Construction - PCC Testing-2016-04-28   Bid Completion detail




LINN -- PROJECT # 15-06-57-03                4/21/2016                Large Project Letting
PLEASANT CREEK STATE RECREATION AREA
SHORELINE STABILIZATION - CONTRACT
Proposal Guarantee: $120,000
Completion Date: 3/31/2017

   This project consists of placing shoreline stabilization in various parts of the lake.

ESTIMATED QUANTITIES:
    EXCAVATION, CLASS 10     37,207 C.Y.
    REVETMENT, CLASS E - SHORELINE     47,318 Tons
    REVETMENT, CLASS E - ISLAND     1,330 Tons
    ENGINEERING FABRIC - SHORELINE     15,310 S.Y.
    ENGINEERING FABRIC - ISLAND     3,356 S.Y.
    ENGINEERING FABRIC - HABITAT     23,968 S.Y.
    CONCRETE GROUT     167 C.Y.
    SHOT ROCK - WASTE POINTS     4,120 Tons
    SHOT ROCK - HABITAT     2,990 Tons
    3/8" MINUS CRUSHED STONE     231 Tons
    6" STRUCTURAL CONCRETE - BOAT RAMP     1,314 S.Y.
    6" PCC SIDEWALK     72 S.Y.
    CLASS A CRUSHED STONE     3,734 Tons
    ROAD GRADING     5,069 L.F.
    DITCH CLEANOUT     10,138 L.F.
    PAVEMENT REMOVAL     955 S.Y.
    GEOCELL, 6"     8,388 S.F.
    POROUS BACKFILL (IDOT GRAD. 20, 21) PEA GRAVEL     434 Tons
    SHEET PILE     940 S.F.
    BRIDGE PLANKS     282 L.F.
    ALUMINUM RAIL SECTION     5 Each
    RELOCATE POWER POLE     1 Each
    SITE RESTORATION     1 L.S.
    CONSTRUCTION SURVEY     1 L.S.
    MOBILIZATION     1 L.S.
Alternate
    LOWER LAKE EARLY     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MONONA -- PROJECT # 13-01-67-02                4/21/2016                Large Project Letting
LEWIS AND CLARK
WATER TREATMENT SYSTEM REPLACEMENT
Proposal Guarantee: $10,000
Completion Date: 9/15/2016

   THIS PROJECT CONSISTS OF CONSTRUCTING A NEW WELL AND A BRAND NEW TREATMENT SYSTEM, INCLUDING DEMOLITION OF THE OLD FACILITIES AND OTHER INCIDENTAL WORK AS REQUIRED BY THE IDNR CONSTRUCTION INSPECTOR.

ESTIMATED QUANTITIES:
    MOBILIZATION      1 L.S.
    CLEARING & GRUBBING     1 L.S.
    38’ X 22’ WATER TREAMENT BUILDING COMPLETE WITH GRADING     1 L.S.
    158 GALLONS WX-451 AMTROL PRESSURE TANK     2 Each
    STORAGE BUILDING MANIFOLD: WATER METER, VALVES, PRESSURE SWITCH, PRESSURE GAUGE, SCH. 80 PVC PIING ETC.     1 L.S.
    CHLORINE FEED SYSTEM WITH ONE PUMP, 20 GALLON TANK AND SPILL PALLET COMPLETE     1 L.S.
    TRIPLEX MULTI-MEDIA IRON FILTER SYSTEM COMPLETE WITH CHLORINE INJECTION PUMP, COMPLETE     1 L.S.
    DUPLEX AUTOMAIC SOFTENER SYSTEM WITH BRINE TANK COMPLETE     1 L.S.
    ELECTRICAL SERVICE AND PUMP CONTROLS COMPLETE WITH LIGHTING , HEATER AND 200 AMP CONTROL PANEL AND OTHER ACCESSORIES SHOWN IN PLANS     1 L.S.
    NEW ELECTRICAL SERVICE TO THE BULDING FROM 70 FT. WITH DISCONECT.     1 L.S.
    SUMP AND SUBMERSIBLE PUMP INSIDE BUILDING, COMPLETE     1 L.S.
    3" DIA. HDPE (DR 11) WATERMAIN, BORED OR TRENCHED IN PLACE TO SETTLING BASIN     150 L.F.
    SETTLING BASIN     1 L.S.
    3" DIA. HDPE DR 11 WATERMAIN TRANCHED OR BORED IN PLACE     200 L.F.
    TRACER WIRE #12 OR 3" DETACTABLE "WATER " TAPE     350 L.F.
    SYSTEM DISINFECTION     1 L.S.
    DRILL 12" HOLE, FURNISH 6" PVC SDR 21 WELL CASING PIPE AND PCC GROUT     80 L.F.
    6" DIA X 20’ OF PVC SLOTTED WELL SCREEN WITH GRAVEL PACK IN 12" HOLE     20 L.F.
    2"X 60’ SCH 120 PVC DROP PIPE     80 L.F.
    5 HP 3PH SUBMERSIBLE VARIABLE SPEED PUMP RATED TO PROVIDE 65 GPM AT 70 PSI AT SURFACE. INCLUDING 3PH WIRING TO THE VFD TO TREATMENT BUILDING     1 L.S.
    PITLESS ADAPTER UNIT     1 Each
    STATIC WATER PRESSURE LINE AND GUAGE     1 L.S.
    INSTALL WELL BELOW-OFF ASSEMBLY & PVC CL 160 WATER LINE FROM WELL TO BUILDING     1 L.S.
    DEVELOP WELL AND TEST PLUMBING     1 L.S.
    DISINFECTION AND CHEMICAL ANALYSIS     1 L.S.
    GRADE AREA AROUND WELL HEAD AS SHOWN AND SEED     1 L.S.
    DRILL 12" HOLE AND 6" PVC SDR 21 WELL CASING AND GROUT FOR ADDITONAL DEPTH     1 L.F.
    REMOVE PUMP & PLUG EXISTING WELL     1 L.S.
    DEMOLISH APP. 28’X28’ EXSTNG TREAT. BLDNG INC. ASBESTOS ABTMNT, REMOVE PRESSURE TANKS, MIXING TANKS, INTERNAL PIPING ETC. HAUL AND DISPOSE OFF SITE     1 L.S.
    DEMOLISH 28’X24’X6’ DEEP CONCRETE STORAGE TANK, HAUL AND DISPOSE OFF SITE     1 L.S.
    SEED ALL DISTURBED AREAS     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SAC -- PROJECT # 13-01-81-06                4/21/2016                Large Project Letting
BLACK HAWK MARSH WMA
INLET DREDGING
Proposal Guarantee: $100,000
Completion Date: 12/31/2016

   This project consists of sediment removal from the inlet of Black Hawk Lake.

ESTIMATED QUANTITIES:
    DREDGING, HYDRAULIC     330,000 C.Y.
    CONTROL STRUCTION     1 L.S.
    MOBILIZATOIN     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




TAMA -- PROJECT # 14-05-86-03                4/21/2016                Large Project Letting
UNION GROVE
HYDRAULIC DREDGING
Proposal Guarantee: $80,000
Completion Date: 12/31/2016

   This project consists of removing approximately 249,000 CY of sediment from Union Grove Lake, with an alternate bid to remove an additional 18,500 CY of native material.

ESTIMATED QUANTITIES:
    DREDGING, HYDRAULIC     249,000 C.Y.
    IN-LAKE SILT DAM CROSSING     1 L.S.
    Control Structure     1 L.S.
    Mobilization     1 L.S.
Alternate
    Dredging, Hydraulic     18,500 C.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CLAY -- PROJECT # 16-01-21-02                4/21/2016                Small Project Letting
PRAIRIE LAKES WILDLIFE HEADQUARTERS
PRAIRIE LAKES WILDLIFE HQ BUILDING PAD GRADING & ELECTRICAL
Proposal Guarantee: $0
Completion Date: 5/27/2016

   This project is designed to create a level building pad area, and supply an electrical service for a future building that will be moved from another location. The building site is located at the Prairie Lakes Wildlife area headquarters (Ruthven) in Clay County, Iowa. Work includes clearing existing grass/vegetation, installation of compacted fill material (Approx. 125'x70'), miscellaneous grading for drainage, installation of a new electrical service, and installation of rock approaches at the door locations of the new building.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




POLK -- PROJECT # 16-05-77-06                4/21/2016                Small Project Letting
DNR FAIR BUILDING
PHASE III RENOVATIONS
Proposal Guarantee: $0
Completion Date: 7/29/2016

   THE DNR BUILDING AT THE IOWA STATE FAIRGROUNDS HAS BEEN A MARQUEE DESTINATION FOR FAIR GOERS FOR CLOSE TO 85 YEARS. THE DNR BELIEVES THE IOWA STATE FAIR IS AN OPPORTUNITY TO SHOWCASE IT'S MISSION AND ACHIEVEMENTS TO THE CITIZENS OF IOWA DURING THIS TIME. THIS YEAR, THE DNR IS PROPOSING A FEW IMPROVEMENTS TO MAKE CIRCULATION AND DEMONSTRATION BETTER.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




APPANOOSE -- PROJECT # 15-05-04-10                4/28/2016                Small Project Letting
STEPHENS STATE FOREST, UNIONVILLE UNIT
POND SPILLWAY REPAIR
Proposal Guarantee: $0
Completion Date: 7/31/2016

   This project includes placement of 370 CY of contractor supplied fill dirt, engineering fabric, and 140 tons class E revetment. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




CERRO GORDO -- PROJECT # 16-03-17-04                4/28/2016                Small Project Letting
LEKWA MARSH, CLEAR LAKE STATE PARK
LEKWA ACCESS DEVELOPMENT
Proposal Guarantee: $0
Completion Date: 6/17/2016

   Project consists of furnishing and placing field stone riprap (80 ton), fill material (280 CY), and crushed stone surfacing (180 ton); some minor bank shaping & seeding disturbed areas on Clear Lakes south shore near Lekwa Marsh at Clear Lake State Park. Proposal & site plan may be obtained by emailing name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




CLAY -- PROJECT # 16-01-21-03                4/28/2016                Small Project Letting
PRAIRIE LAKES WILDLIFE UNIT HEADQUARTERS
PRAIRIE LAKES WILDLIFE HQ - STORAGE BUILDING RELOCATION
Proposal Guarantee: $0
Completion Date: 6/24/2016

   The scope of this contract is to relocate a 55' x 110' pole style storage building approximately 9 miles from its existing location to the Prairie Lakes Wildlife Unit Headquarters in Clay County, Iowa. Work includes but is not limited to; preparing the building for relocation, moving the building with all necessary permits, law enforcement/utility coordination, and resetting the building on a pre-prepared pad.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




FREMONT -- PROJECT # 16-04-36-02                4/28/2016                Small Project Letting
NISHNABOTNA WILDLIFE UNIT
RIVERTON DIKE FIX
Proposal Guarantee: $0
Completion Date: 6/17/2016

   Repair slough areas and one hole in the south dike at the Riverton WMA using fill material at the site. Seeding of all disturbed areas required when earthwork completed.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




WASHINGTON -- PROJECT # 15-06-92-07                4/28/2016                Small Project Letting
LAKE DARLING STATE PARK
CABIN ROAD CONSTRUCTION - PCC TESTING
Proposal Guarantee:
Completion Date: 6/30/2016

   Daily testing of PCC being placed for an Iowa DOT funded roadway project at Lake Darling State Park in Washington County, Iowa.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov