PROJECTS LETTING -  March , 2023

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

CERRO GORDO 23-03-17-02 Clear Lake Fisheries Management Unit - Flooring Replacement-2023-03-23   Bid Completion detail
HARRISON 21-04-43-02 Missouri River Wildlife Unit - Flood Damage Repairs-2023-03-23   Bid Completion detail
JOHNSON 21-06-52-04 Iowa River Wildlife Unit - Swan Lake Road Culvert Replacement-2023-03-23   Bid Completion detail
UNION 21-04-88-03 Green Valley State Park - Spillway Repair-2023-03-23   Bid Completion detail
JACKSON 23-06-49-04 Maquoketa Caves State Park - Lagoon Liner Repairs REBID-2023-04-06   Bid Completion detail
DAVIS 23-05-26-01 Lake Wapello State Park - Office and Storage Building-2023-04-20   Bid Completion detail
POLK 21-02-77-08 Big Creek State Park - Fishing Pier & Path-2023-04-20   Bid Completion detail
POTTAWATTAMIE 21-04-78-02 Lake Manawa State Park - PCC Parking and Boat Ramp-2023-04-20   Bid Completion detail
STORY 23-02-85-01 State Forest Nursery - Hoop Building-2023-04-20   Bid Completion detail
WARREN 23-05-91-02 Lake Ahquabi State Park - Beach Area Lift Station-2023-04-20   Bid Completion detail




HARRISON -- PROJECT # 21-04-43-02                3/23/2023                Large Project Letting
MISSOURI RIVER WILDLIFE UNIT
FLOOD DAMAGE REPAIRS
Proposal Guarantee: $37,500
Completion Date: 9/30/2023

   This project consists of FEMA repairs by removing sediment, fixing parking lots, water control structures, pipes and roadways in various locations in Woodbury, Monona, Harrison and Shelby Counties.

ESTIMATED QUANTITIES:
    Granular Surfacing, 1" Roadstone (Weedland Access - Site #1)     203 Tons
    Mobilization     1 L.S.
    Base Hauled and Placed, Macadam Stone Base     65 Tons
    Earthwork, Fill Hauled and Placed, Native Soil     1 L.S.
    Granular Surfacing, 1" Roadstone     70 Tons
    Mobilization     1 L.S.
    Revetment, Class E (Site 1: Levee Embankment)     74 Tons
    Filtration Material B (Site 1: Levee Embankment)     39 C.Y.
    Stop Log Structure Repairs     1 L.S.
    Sluice Gate, Remove And Replace (Site 2: Lift Pump Station)     1 Each
    Pipe Clean-Out, 36" (Site 2: Lift Pump Station)     1 L.S.
    Pump Station Repairs     1 L.S.
    Mobilization     1 L.S.
    Granular Surfacing, 1" Roadstone (Site 1: Gravel Access Road)     245 Tons
    Granular Surfacing, 1" Roadstone (Site 2: Gravel Access Road)     464 Tons
    Granular Surfacing, 1" Roadstone (Site 3: Gravel Access Road)     480 Tons
    Pipe Clean-Out, 18" (Site 4: North Pump Access Road)     1 L.S.
    Granular Surfacing, 1" Roadstone (Site 4: North Pump Access Road)     959 Tons
    Sediment, Removal and Disposal (Site 5: North Pump Access Road)     305.8 C.Y.
    Base Hauled and Placed, 1 1/2" Roadstone (Site 5: North Pump Access Road)     289 Tons
    Subbase Hauled and Placed, Macadam Stone Base (Site 5: North Pump Access Road)     269 Tons
    Granular Surfacing, 1" Roadstone (Site 5: North Pump Access Road)     289 Tons
    Earthwork, Fill Hauled and Placed, Unclassified (Site 6)     1 L.S.
    Base Hauled and Placed, 1 1/2" Roadstone (Site 6)     104 Tons
    Subbase Hauled and Placed, Macadam Stone Base (Site 6)     97 Tons
    Granular Surfacing, 1" Roadstone (Site 6)     104 Tons
    Mobilization     1 L.S.
    Sediment, Removal and Disposal (Site 3: Parking Lot)     660 C.Y.
    Granular Surfacing, 1" Roadstone (Site 3: Parking Lot)     312 Tons
    Sediment, Removal and Disposal (Site 4: Boat Ramp)     15 C.Y.
    Mobilization     1 L.S.
    Earthwork, Fill Hauled and Placed, Clay Mix     1 L.S.
    Culvert, CMP Entrance, 36"     34 L.F.
    Mobilization     1 L.S.
    Granular Surfacing, 1" Roadstone (Site 1)     24 Tons
    Earthwork, Fill Hauled and Placed, Native Soil (Site 3)     1 L.S.
    Earthwork, Fill Hauled and Placed, Native Soil (Site 4)     1 L.S.
    Base Hauled and Placed, 1 1/2" Roadstone (Site 4)     161 Tons
    Subbase Hauled and Placed, Macadam Stone Base (Site 4)     150 Tons
    Granular Surfacing, 1" Roadstone (Site 4)     110 Tons
    Earthwork, Fill Hauled and Placed, Native Soil (Site 5)     1 L.S.
    Base Hauled and Placed, 1 1/2" Roadstone (Site 5)     69 Tons
    Subbase Hauled and Placed, Macadam Stone Base (Site 5)     64 Tons
    Granular Surfacing, 1" Roadstone (Site 5)     46 Tons
    Sediment, Removal and Disposal (Site 6)     3,091 C.Y.
    Granular Surfacing, 1" Roadstone (Site 6)     1,099 Tons
    Base Hauled and Placed, 1 1/2" Roadstone (Site 7)     69 Tons
    Subbase Hauled and Placed, Macadam Stone Base (Site 7)     64 Tons
    Granular Surfacing, 1" Roadstone (Site 7)     48 Tons
    Mobilization     1 L.S.
    Sediment, Removal and Disposal     5 C.Y.
    Mobilization     1 L.S.
    Sediment, Removal and Disposal (Site 1: Low Water Crossing Road)     204 C.Y.
    Granular Surfacing, Macadam Stone Base (Site 2)     57 Tons
    Revetment, Class E (Site 2)     51 Tons
    Vegetation Obstacles, Removal (Site 3)     47 C.Y.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JOHNSON -- PROJECT # 21-06-52-04                3/23/2023                Large Project Letting
IOWA RIVER WILDLIFE UNIT
SWAN LAKE ROAD CULVERT REPLACEMENT
Proposal Guarantee: $12,500
Completion Date: 8/15/2023

   THIS PROJECT CONSISTS OF REPLACING AN EXISTING REINFORCED CONCRETE BOX ON SWAN LAKE ROAD IN THE IOWA RIVER WILDLIFE UNIT.

ESTIMATED QUANTITIES:
    Concrete Box Culvert Construction     1 L.S.
    Modified Subbase     204 Tons
    1" Roadstone     23 Tons
    Remove Existing Structure     1 L.S.
    Revetment, Class E     65 Tons
    Filter Sock, 8"     120 L.F.
    Construction Staking     1 L.S.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




UNION -- PROJECT # 21-04-88-03                3/23/2023                Large Project Letting
GREEN VALLEY STATE PARK
SPILLWAY REPAIR
Proposal Guarantee: $25,000
Completion Date: 9/15/2023

   Miscellaneous repair work for dam spillway that includes slab/wall joint & seal, partial depth concrete repair, concrete demolition, structural concrete wall and reinforced concrete slabs.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    SLAB JOINT CLEAN AND SEAL     1,990 L.F.
    WALL JOINT CLEAN AND SEAL     460 L.F.
    PARTIAL DEPTH CONCRETE REPAIR     362 S.F.
    CONCRETE DEMOLITION     154 C.Y.
    STRUCTURAL CONCRETE (WALL)     23 C.Y.
    REINF. CONCRETE SLAB, 12"     129 C.Y.
    EXCAVATE AND DEWATER     1 Each
    DUCTILE IRON PIPE, 10"     16 L.F.
    COMPACTED GRANULAR SUBBASE     134 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DAVIS -- PROJECT # 23-05-26-01                4/20/2023                Large Project Letting
LAKE WAPELLO STATE PARK
OFFICE AND STORAGE BUILDING
Proposal Guarantee: $50,000
Completion Date: 3/1/2024

   Lake Wapello State Park is located in Davis County, Iowa. The park will receive a new office/shop and storage building as shown in the documents. The office/shop will have a garage/storage area which will have three (3) heated bays. The office will have one large open office space, one storage area, one restroom, mechanical room and a conference/breakroom. There will be a rock drive into the garage bays and a storage yard to the rear of the building. The public entry will have a large overhang with a decorative heavy timber truss in accordance with the Iowa State Parks design guide.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Construction Staking     1 L.S.
    NPDES General Permit #2     1 L.S.
    Grading     1 L.S.
    8" Filter Sock     420 L.F.
    Seeding, Fertilizing and Mulching     1 L.S.
    Class A Crushed Stone     855 Tons
    Sanitary/Septic/Sand Filter System     1 L.S.
    12" RCP Class III     104 L.F.
    12" RCP Class III FES     4 Each
    1" Type K Copper Water Service     80 L.F.
    4x4x1 Tapping Tee     1 Each
    1" Curb Stop     1 Each
    1" LP Service Line     60 L.F.
    Black PVC Coated Chain Link Fencing     6 L.F.
    Black PVC Coated Chain Link Fencing 12' Swing Gate     1 Each
    6" Non-Reinforced PCC Pavement     32 S.Y.
    5" Non-Reinforced PCC Sidewalk     27.5 S.Y.
    Precast Concrete Parking Wheel Stops     4 Each
    Parking Space Cross Hatch Paint Striping     1 L.S.
    Handicap Signage     1 L.S.
    Office / Shop Building and All Associated Items     1 L.S.
    LP Tank, Fuel Tank, and Pad     1 L.S.
    Traffic Bollards and Sleeves     15 Each
    Microwave and Refrigerator     1 L.S.
    Washer and Dryer     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POLK -- PROJECT # 21-02-77-08                4/20/2023                Large Project Letting
BIG CREEK STATE PARK
FISHING PIER & PATH
Proposal Guarantee: $25,000
Completion Date: 10/31/2023

   This project consists of demolishing the existing damaged wooden accessible fishing pier and constructing a new steel framed accessible fishing pier and fishing path along the shoreline north of the pier. Work includes pile driving, steel framing, field welding, deck and railing construction, and finishing. The new accessible fishing path entails grading of the shoreline to create a bench, constructing PCC sidewalk, riprap of the band, seeding of the cut bank, and incidental work as required by the DNR District Engineer.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Excavation, Class 10, Waste     992 C.Y.
    Excavation, Class 10, Embankment     26 C.Y.
    Demolition of Existing Pier     1 L.S.
    Sediment Log, 8"     300 L.F.
    PCC Sidewalk Removal     10 S.Y.
    5" Reinforced PCC Sidewalk     239 S.Y.
    Class A Crushed Stone     75 Tons
    Revetment, Class D     385 Tons
    Seeding, Fertilizing, and Mulching     1 L.S.
    Fishing Pier, Complete     1 L.S.
    6" PCC Patch     193 S.Y.
    Construction Staking     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POTTAWATTAMIE -- PROJECT # 21-04-78-02                4/20/2023                Large Project Letting
LAKE MANAWA STATE PARK
PCC PARKING AND BOAT RAMP
Proposal Guarantee: $37,500
Completion Date: 9/29/2023

   This project consists of replacing the west boat ramp and parking lot at Lake Manawa State Park by removing all asphalt and concrete pavements and placing new PCC boat ramp and parking lot.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Construction Survey     1 L.S.
    Site Restoration     1 L.S.
    Pavement Removal     5,370 S.Y.
    Excavation, Class 10, Waste     1,337 C.Y.
    Grading     1 L.S.
    Class "A" Crushed Stone     85 Tons
    Class "E" Revetment     76 Tons
    5" PCC, Sidewalk     357 S.Y.
    6" PCC     5,200 S.Y.
    6" PCC, Reinforced, Boat Ramp     117 S.Y.
    Special Backfill     1,802 Tons
    Truncated Dome Panel     62 S.F.
    Sign - ADA Parking     1 Each
    12-Inch RCP, Class III     48 L.F.
    12-Inch RCP Flared End Section, Class III     2 Each
    6-Inch CMP     20 L.F.
    Pavement Marking - ADA Parking     1 Each
    Pavement Marking - Traffic Flow     5 Each
    Pavement Striping     3,927 L.F.
    PCC, Curb and Gutter     540 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




STORY -- PROJECT # 23-02-85-01                4/20/2023                Large Project Letting
STATE FOREST NURSERY
HOOP BUILDING
Proposal Guarantee: $12,500
Completion Date: 10/27/2023

   State Forest Nursery is installing a new hoop building structure over their cob storage area. This cob storage area currently has a 75'-0" x 85'-0" concrete slab with 3x3x6 concrete blocks on it's perimeter. The contractor shall purchase 26 new blocks of the same dimension then remove all blocks and stack them two (2) high around the perimeter. The contractor shall order a new 88'-0" wide truss hoop-building as specified and installed as instructed.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    3 x 3 x 6 Concrete Blocks     26 Each
    Pavement Cleaning and Block Installation     1 L.S.
    Concrete Footings     16 Each
    1" Clean Rock     40 Tons
    Hoop Building, Installation, and All Associated Items     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CERRO GORDO -- PROJECT # 23-03-17-02                3/23/2023                Small Project Letting
CLEAR LAKE FISHERIES MANAGEMENT UNIT
FLOORING REPLACEMENT
Proposal Guarantee: $0
Completion Date: 6/30/2023

   This project consists of flooring replacement at the Clear Lake FMU in Cerro Gordo County, and other work as directed by the DNR Engineer.

Contact:
Kenneth Howe
319-240-3553
Kenneth.howe@dnr.iowa.gov




JACKSON -- PROJECT # 23-06-49-04                4/6/2023                Small Project Letting
MAQUOKETA CAVES STATE PARK
LAGOON LINER REPAIRS REBID
Proposal Guarantee:
Completion Date: 5/24/2023

   Project includes repairing the lagoon liner in the sewage treatment lagoon located at Maquoketa Caves State Park. contact Mark Moeller for plans and specs.

Contact:
Mark Moeller
515-214-9532
mark.moeller@dnr.iowa.gov




WARREN -- PROJECT # 23-05-91-02                4/20/2023                Small Project Letting
LAKE AHQUABI STATE PARK
BEACH AREA LIFT STATION
Proposal Guarantee: $0
Completion Date: 6/30/2023

   Replace lift station pumps, rails, floats, and controls. The existing wet well can be reused. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707