PROJECTS LETTING -  March , 2012

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

ALLAMAKEE 11-03-03-01 Yellow River State Forest - Repair pond spillway/dike-2012-03-22   Bid Completion detail
ALLAMAKEE 11-03-03-02 Yellow River State Forest - Yellow River Bank Stabilization-2012-03-22   Bid Completion detail
DICKINSON 12-01-30-09 Garlock Slough - Graff Tract Wetland Restoration Rebid-2012-03-22   Bid Completion detail
POTTAWATTAMIE 11-04-78-03 Lake Manawa State Park - Lake control structure renovation-2012-03-22   Bid Completion detail
POTTAWATTAMIE 12-04-78-07 Lake Manawa State Park - Flooding repairs-2012-03-22   Bid Completion detail
APPANOOSE 12-05-04-01 Honey Creek State Park - sewage lagoon repairs-2012-03-29   Bid Completion detail
CERRO GORDO 12-03-17-03 Bayside Lake Patrol UST - Remove two UST-2012-04-05   Bid Completion detail
CERRO GORDO 12-03-17-01 McIntosh Woods State Park - Repair Prop Washouts on Ramps-2012-04-05   Bid Completion detail
DELAWARE 12-03-28-04 Backbone State Park - Backbone Barn roof recovering-2012-04-05   Bid Completion detail
POTTAWATTAMIE 12-04-78-10 Lake Manawa State Park - Beach sand & wall replacement-2012-04-05   Bid Completion detail
POTTAWATTAMIE 12-04-78-12 Lake Manawa State Park - Shoreline rip rap-2012-04-05   Bid Completion detail
WINNESHIEK 12-03-96-02 Decorah Fish Hatchery - Removal of UST at the hatchery-2012-04-05   Bid Completion detail
BOONE 12-02-08-04 Boone Research Station - ANS/Fisheries Storage Building-2012-04-19   Bid Completion detail
DUBUQUE 12-03-31-02 Mines of Spain - trail repair/riprap-2012-04-19   Bid Completion detail
GUTHRIE 11-04-39-02 Springbrook State Park - Sewer System-2012-04-19   Bid Completion detail
MARION 10-05-63-01 Red Rock WMA - Swan - Dike and Control Structures-2012-04-19   Bid Completion detail
RINGGOLD 12-04-80-03 Kellerton Wildlife Area - New headquarters (rebid)-2012-04-19   Bid Completion detail




BOONE -- PROJECT # 12-02-08-04                4/19/2012                Large Project Letting
BOONE RESEARCH STATION
ANS/FISHERIES STORAGE BUILDING
Proposal Guarantee: $5,000
Completion Date: 12/31/2012

   This project consists of the construction of a one story, pre-engineered post-frame building with a metal roof and metal siding, approximately 40' x 136', including two heated bays, five cold storage bays and a storage loft. The work also includes concrete and class "A" crushed stone paving, concrete paving and electrical services. Project number 12-02-08-04

ESTIMATED QUANTITIES:
    Earthwork     1 L.S.
    6" Class "A" Crushed Stone Paving     1 L.S.
    Site Restoration     1 L.S.
    6" Thick Exterior Concrete Apron     1 L.S.
    40"-0" x 136'-0" Post-Frame Building     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DUBUQUE -- PROJECT # 12-03-31-02                4/19/2012                Large Project Letting
MINES OF SPAIN
TRAIL REPAIR/RIPRAP
Proposal Guarantee: $10,000
Completion Date: 6/30/2012

   This project consists of repairs to flood damaged portions of Calcite Trail, streambank armoring adjacent to the trail, streambank armoring adjacent to an existing roadway bridge over Catfish Creek, and incidental work as required by the Plans and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Furnish & Install Fill (Trail)     7,021 C.Y.
    Furnish & Install Fill (Bridge)     93 C.Y.
    Engineering Fabric (Trail)     1,164 S.Y.
    Engineering Fabric (Bridge)     249 S.Y.
    Revetment, Class "D" Riprap (Trail)     1,187 Tons
    Revetment, Class "D" Rirpap (Bridge)     716 Tons
    Surfacing, Class "A" Cr. Stone     275 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




GUTHRIE -- PROJECT # 11-04-39-02                4/19/2012                Large Project Letting
SPRINGBROOK STATE PARK
SEWER SYSTEM
Proposal Guarantee: $5,000
Completion Date: 9/30/2012

   This project consists of installing a new 3700 ft. long 2 inch diameter HDPE sewer forcemain along with two lift stations and an equalization tank. Upgrading the existing dump station at the campground by replacing the holding tank. Lining or replacing 225 ft. of existing 8 inch dia. gravity sewer and other miscellaneous related work.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Remove Existing Dump Station Manhole & Plug Lines     1 Each
    Remove Existing Septic Tank & Plug Lines     1 Each
    Demolish Existing Manhole & Plug Lines     1 Each
    Install 1500 Gal. Precast Equalization Basin and Reconnect Services     1 Each
    Quad Lift Station Complete with Valve Pit & Electrical (at Campground)     1 L.S.
    Quad Lift Station Complete with Valve Pit & Electrical (at Midway)     1 L.S.
    Bore or Trench 2" Dia. HDPE SDR 11 Forcemain     3,627 L.F.
    New RV Manhole & Connect to Services     1 Each
    8" Sanitary Sewer Lining OR Replace with 8" Dia. PVC SDR 35 OR Replace by Pipe Bursting     225 L.F.
    8" Dia. PVC SDR 35 Sewer Pipe     173 L.F.
    4" Dia PVC SDR 35 Sewer Pipe     250 L.F.
    Detectable Warning Tape, 3" Sewer     4,275 L.F.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MARION -- PROJECT # 10-05-63-01                4/19/2012                Large Project Letting
RED ROCK WMA
SWAN - DIKE AND CONTROL STRUCTURES
Proposal Guarantee: $5,000
Completion Date: 9/1/2012

   This project consists of the replacement of two CMP Water Control Structures, reconstruction of compacted earthfill dikes damaged by flooding and other related work as required by the Plans and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Removal/Disposal - Existing Structures     1 L.S.
    Excavation, Class 10 Borrow     11,186 C.Y.
    CMP Control Structure, Complete     2 Each
    Excavation, Channel     2,134 C.Y.
    Seeding, Fertilizing & Mulching     4 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




RINGGOLD -- PROJECT # 12-04-80-03                4/19/2012                Large Project Letting
KELLERTON WILDLIFE AREA
NEW HEADQUARTERS (REBID)
Proposal Guarantee: $10,000
Completion Date: 1/31/2013

   This project consists of the construction of a one story, pre-engineered structural insulated panel building with standing seam metal roofing and metal siding, approximately 50' x 110', including three heated bays, a mechanical/electrical room, two restrooms, a conference room, open office area, 4 offices, and a storage room. The work also includes concrete and class "A" crushed stone paving, septic sewer, water and electrical services. Project number 12-04-80-03.

ESTIMATED QUANTITIES:
    Earthwodk & all utilities     1 L.S.
    6" Class "A" crushed stone paving     1 L.S.
    Concrete sidewalk     1 L.S.
    50'-0" x 110'-0" SIPs building     1 L.S.
    Furnace HVAC system     1 L.S.
    Septic System     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




ALLAMAKEE -- PROJECT # 11-03-03-01                3/22/2012                Small Project Letting
YELLOW RIVER STATE FOREST
REPAIR POND SPILLWAY/DIKE
Proposal Guarantee: $0
Completion Date: 6/1/2012

   Project consists of repairing pond spillway using on-site material, placing erosion control engineering fabric on the spillway slope, placing revetment on the spillway and dike, and seeding diturbed area with a stabilizing crop mix.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




ALLAMAKEE -- PROJECT # 11-03-03-02                3/22/2012                Small Project Letting
YELLOW RIVER STATE FOREST
YELLOW RIVER BANK STABILIZATION
Proposal Guarantee:
Completion Date: 6/1/2012

   Project consists of reshaping river bank to approx 2:1 slopes, placing erosion control engineering fabric on the slope, placing revetment on the bank , and seeding disturbed area with a stabilizing crop mix.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




DICKINSON -- PROJECT # 12-01-30-09                3/22/2012                Small Project Letting
GARLOCK SLOUGH
GRAFF TRACT WETLAND RESTORATION REBID
Proposal Guarantee: $0
Completion Date: 8/31/2012

   This project is designed to expand the wetland complex known as Garlock Slough in Dickinson County. The majority of the work is on the newly purchased Graff Tract with a portion on the existing Ortmeier Tract. Work under this project includes excavations, earthfill (dike construction), tile breaks, tile installation (multiple sizes), 3 water control structures, and seeding.

Contact:
Jeff Felts
515-250-3712
[email protected]




POTTAWATTAMIE -- PROJECT # 11-04-78-03                3/22/2012                Small Project Letting
LAKE MANAWA STATE PARK
LAKE CONTROL STRUCTURE RENOVATION
Proposal Guarantee: $0
Completion Date: 5/10/2012

   Replace 3 crank operated floor stand hoists and the stems on the Mosquito Creek inlet gates and remove the silt in front of the inlet gates.

Contact:
Mark Johnson
515-250-3713
[email protected]




POTTAWATTAMIE -- PROJECT # 12-04-78-07                3/22/2012                Small Project Letting
LAKE MANAWA STATE PARK
FLOODING REPAIRS
Proposal Guarantee:
Completion Date: 5/10/2012

   Repair the riprap on 2 river boat ramps and repair the riprap and rock surfacing on 4 fishing jetties.

Contact:
Mark Johnson
515-250-3713
[email protected]




APPANOOSE -- PROJECT # 12-05-04-01                3/29/2012                Small Project Letting
HONEY CREEK STATE PARK
SEWAGE LAGOON REPAIRS
Proposal Guarantee: $0
Completion Date: 5/30/2012

   This project consists of riprap protection of a lagoon dike, replacement of a 24" CMP, and other miscellaneous work.

Contact:
Jason Kruse
(515) 250-3707
[email protected]




CERRO GORDO -- PROJECT # 12-03-17-03                4/5/2012                Small Project Letting
BAYSIDE LAKE PATROL UST
REMOVE TWO UST
Proposal Guarantee:
Completion Date: 6/15/2012

   Project consists of removing two double walled fiberglass underground fuel storage tanks and associated equipment. The tanks are under a concrete parking area which shall be repaired. Bidders must be licensed removers/installers in the state of Iowa.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




CERRO GORDO -- PROJECT # 12-03-17-01                4/5/2012                Small Project Letting
MCINTOSH WOODS STATE PARK
REPAIR PROP WASHOUTS ON RAMPS
Proposal Guarantee:
Completion Date: 6/15/2012

   Project consists work at two lacations of grading slope approx. 12' out from end of the ramp, placing a subbase of clean 2" cr. stone, placing 'Armorflex' articulating concrete block revetment system, or equal, with a top dressing of clean 2" cr. stone. Contractor will have to move docks in order to complete ramp work.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




DELAWARE -- PROJECT # 12-03-28-04                4/5/2012                Small Project Letting
BACKBONE STATE PARK
BACKBONE BARN ROOF RECOVERING
Proposal Guarantee:
Completion Date: 6/15/2012

   Project consists of furnishing & placing metal roofing system on Backbone State Park office.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




POTTAWATTAMIE -- PROJECT # 12-04-78-10                4/5/2012                Small Project Letting
LAKE MANAWA STATE PARK
BEACH SAND & WALL REPLACEMENT
Proposal Guarantee:
Completion Date: 5/10/2012

   Provide and grade sand for the beach and seed disturbed areas.

Contact:
Mark Johnson
515-250-3713
[email protected]




POTTAWATTAMIE -- PROJECT # 12-04-78-12                4/5/2012                Small Project Letting
LAKE MANAWA STATE PARK
SHORELINE RIP RAP
Proposal Guarantee:
Completion Date: 5/10/2012

   Provide and grade Class "E" Riprap to the south shore and boat ramp and seed disturbed areas.

Contact:
Mark Johnson
515-250-3713
[email protected]




WINNESHIEK -- PROJECT # 12-03-96-02                4/5/2012                Small Project Letting
DECORAH FISH HATCHERY
REMOVAL OF UST AT THE HATCHERY
Proposal Guarantee:
Completion Date: 6/15/2012

   Project consists of removal of two underground fiberglass double walled fuel tanks, associated electric & piping, and testing of the soils. Bidders must be licensed removers/installers in the state of Iowa.

Contact:
Mel Pacovsky
319-240-3553
[email protected]