The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual. Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms, Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.
Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis.
To subscribe to this list, click here.
The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.
To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website.
You may obtain a free download from
Click on the project names below to view the one(s) which interest you.
During the incident period of the 2010, 2011 spring and summer season heavy rains and flooding caused widespread damage to the Mines of Spain State Park. Damage consist of erosion of 6 hiking and ski trails as well as parking lots and a timber retaining wall.
A mandatory Pre-Bid Meeting is to be scheduled before March 21, 2013. Please contact Mel Pacovsky for information of date and time. (319)240-3553
This project will accommodate the growing staff at the new centralized SW Regional office. Fisheries & Wildlife currently have offices in this building and will be joined by Parks staff. The existing building will remain and a new 1,000 sf addition will house two new open offices (2 staff each), one conference/break room (12 person) and a new restroom. The existing building will have two offices converted into a modern laboratory with fume hood. The exterior of the building will mimic the original construction and site will be minimally disturbed.
ESTIMATED QUANTITIES:
DEMOLITION (INCLUDES SITE RESTORATION)
1 L.S.
CLEARING AND GRUBBING
1 L.S.
ON-SITE TOPSOIL (STRIP, SALVAGE & RESPREAD)
25 C.Y.
EXCAVATION CLASS 10
1 L.S.
SANITARY SERVICE
1 Each
4" PCC SIDEWALK
19 S.Y.
CONVENTIONAL SEEDING (URBAN)
0.1 Acres
12" FILTER SOCK
100 L.F.
COONSTRUCTION STAKING
1 L.S.
NEW ADDITION AND INTERIOR RENOVATION OF EXISTING BUILDING AND ALL COMPONENTS
1 L.S.
ALTERNATE#1
Alternate
REMOVE AND REPLACE SIDING WITH CEMENT BOARD SIDING ON EXISTING BUILDING
1 L.S.
ALTERNATE#2
Alternate
REMOVE AND REPLACE ALL WINDOWS ON EXISTING BUILDING NOT COVERED IN THE BASE BID
1 L.S.
ALTERNATE#3
Alternate
REMOVE AND REPLACE VINYL FLOOR AND RUBBER BASE IN EXISTING BUILDING WITH SPECIFIED FLOOR COVERING
Project Description: Clean out boat access channel over an approximate distance of 9,100 feet, from Blake's Lake boat ramp to the outlet structure on the Mississippi River levy. Dig channel to elevation 581 (avg. depth of 2.5 feet as constructed) with a 10 foot bottom and 2 to 1 side slopes. A new 2,000 foot channel will be constructed into Blake's Lake from the existing channel.
Project consists of providing a 500 gallon fire guard tank with hose reel platform on a concrete slab including a roof & fenced enclosure. Tank accessories shall include overfill valve, tank gauge, PV vents, emergency vents, fill containment, fill cap & adaptor, and interstical gauge. Hose reels shall be equiped with 125' 3/4" hose with 3/4" hose swivels & nozzel. Project shall be complete including electrical hookup, painting, decals & signage, and environmental work required by the State Fire Marshall. Project shall be completed by Iowa certified fuel tank installers. An onsite pre-bid viewing will be held at the Bayside DNR Patrol Facility located at 15398 Crane Street, Clear Lake, IA, 10AM March 28, 2013.
This project is designed to serve as a water outlet area for a future DOT wetland mitigation project in the Welsh Lake wildlife area. Work under this project includes excavation of 1,139 ft of channel, 290 ft of 8" tile installation, tile breaks, and erosion control measures.