PROJECTS LETTING -  March , 2025

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DICKINSON 22-01-30-08 Spring Run Wildlife Management Area - Shooting Range Upgrade-2025-03-20   Bid Completion detail
JACKSON 25-06-49-03 Green Island WMA - Levee Repair-2025-03-20   Bid Completion detail
O'BRIEN 21-01-71-01 Williams Wildlife Management Area - Williams WMA Wetland Restoration-2025-03-20   Bid Completion detail
BOONE 25-02-08-02 Ledges State Park - Foundation Removal and Fill-2025-03-27   Bid Completion detail
MONTGOMERY 25-04-69-01 Viking Lake - Viking Lake SOH Remediation -2025-03-27   Bid Completion detail
APPANOOSE 25-05-04-02 Rathbun Hatchery - Pond Liner Replacement-2025-04-17   
BOONE 20-02-08-03 Upper Fraser - Boat Ramp-2025-04-17   
POTTAWATTAMIE 22-04-78-01 Lake Manawa State Park - Rock Reef & Outlet Pipe Work-2025-04-17   




DICKINSON -- PROJECT # 22-01-30-08                3/20/2025                Large Project Letting
SPRING RUN WILDLIFE MANAGEMENT AREA
SHOOTING RANGE UPGRADE
Proposal Guarantee: $25,000
Completion Date: 9/15/2025

   This project consists of improving the existing shooting range by constructing earthen berms, concrete sidewalks, storm sewer, gravel parking, and steel-framed shooting structures for a 30-yard range, a 100-yard range, and a shotgun area.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Construction Staking     1 L.S.
    NPDES General Permit #2     1 L.S.
    8" Mulch Sock     2,539 L.F.
    Class A Crushed Stone     212 Tons
    Class 10 Excavation, Embankment (on site)     3,290 C.Y.
    Class 10 Excavation, Embankment (import)     4,586 C.Y.
    Fence - Barbed     272 L.F.
    Parking Posts     37 Each
    Granular Subbase     105 Tons
    ADA Sign     1 Each
    5" Reinforced Concrete     496 S.Y.
    6" Reinforced Concrete     36 S.Y.
    Pavement Striping     96 L.F.
    Type 1, Class "A" Subdrain, 6" dia.     418 L.F.
    12" RCP Class III     213 L.F.
    12" RCP FES     1 Each
    SW-512 Circular Area Intake     4 Each
    30 Yd Shooting Structure     1 L.S.
    100 Yd Shooting Structure     1 L.S.
    Shooting Benches (install only)     4 Each
    Baffle A     1 Each
    Baffle B     1 Each
    Baffle C     1 Each
Alternate
    Baffle D     1 Each
Alternate
    Baffle A     3 Each
Alternate
    Eyebrow Structure     1 Each
Alternate
    Adjacent Borrow Location     4,586 C.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JACKSON -- PROJECT # 25-06-49-03                3/20/2025                Large Project Letting
GREEN ISLAND WMA
LEVEE REPAIR
Proposal Guarantee: $12,500
Completion Date: 6/20/2025

   This project will repair a breach in the main levee along the Mississippi River within the Green Island Wildlife Management Area.

ESTIMATED QUANTITIES:
    CHANNEL EXCAVATION, CLASS 13 WASTE     2,400 C.Y.
    EMBANKMENT-IN-PLACE     5,794 C.Y.
    GRANULAR MATERIAL     135 Tons
    MOBILIZATION     1 L.S.
    DE-WATERING     1 L.S.
    SEEDING AND FERTILIZING     0.8 Acres
    WOOD EXCELSIOR MAT     2,788 S.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 25-05-04-02                4/17/2025                Large Project Letting
RATHBUN HATCHERY
POND LINER REPLACEMENT
Proposal Guarantee: $375,000
Completion Date: 12/31/2025

   The base bid for the Rathbun State Fish Hatchery improvement project includes the work necessary to remove the existing liner, repair any grading issues, install new liner, install concrete apron around the existing kettles and stairs, and repair the existing sluice gates. Bid alternate 1 includes the removal of the existing concrete stairs and installation of 6- aluminum stairs with railing. Bid alternate 2 includes removal and replacement of the existing aerators and all electrical service required to power the aerators. Bid alternate 3 includes removal and replacement of all 6-in. butterfly valves and one 8-in. butterfly valve located in Manhole 1.

ESTIMATED QUANTITIES:
    Base Bid     1 L.S.
Alternate
    Alternate 1     1 L.S.
Alternate
    Alternate 2     1 L.S.
Alternate
    Alternate 3     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BOONE -- PROJECT # 20-02-08-03                4/17/2025                Large Project Letting
UPPER FRASER
BOAT RAMP
Proposal Guarantee: $6,250
Completion Date: 11/30/2025

   This project consists of adding a portland cement concrete approach to the existing boat ramp, replace/repair the existing parking area that has been washed away by flooding, install rock veins into the Des Moines River and installing riprap to the upstream riverbank to protect the boat ramp in Boone County, Iowa and includes clearing and grubbing, grading, and installation of a new concrete approach to the existing boat ramp with adjacent gravel parking area along with rock veins and adding riprap to the riverbanks upstream and downstream of the existing boat ramp.

ESTIMATED QUANTITIES:
    Clearing & Grubbing     1 L.S.
    Grading     1 L.S.
    Seeding and Mulching     0.3 Acres
    8-inch Filter Sock     105 L.F.
    Class 'A' Crushed Stone     260 Tons
    Class 'E' Riprap     990 Tons
    6-inch Reinforced PCC     183.4 S.Y.
    Grout or K-Crete     10 C.Y.
    Handicap Parking Cross Hatch Markings and Signage     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POTTAWATTAMIE -- PROJECT # 22-04-78-01                4/17/2025                Large Project Letting
LAKE MANAWA STATE PARK
ROCK REEF & OUTLET PIPE WORK
Proposal Guarantee: $12,500
Completion Date: 12/31/2025

   This project consists of constructing underwater fish habitat rock reefs and extending the existing Mosquito Creek outlet pipe. Habitat construction consists of placing approximately 1,140 tons of class D revetment in the lake by barge in 15-ton piles. Extending the Mosqiuto Creek outlet pipe consists of removing rock from the outlet, sliding in a 40-foot long stick of HPDE pipe, and armoring the shoreline above the pipe. Site restoration is required on all disturbed areas. All work to start after Labor Day.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Class D Revetment     1,140 Tons
    Rock Removal     8 HR.
    42" Dia. IPS DR 23.5 HDPE Pipe (furnish and install)     40 L.F.
    Class E Revetment     45 Tons
    Additional Subsurface Investigation     16 HR.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




O'BRIEN -- PROJECT # 21-01-71-01                3/20/2025                Small Project Letting
WILLIAMS WILDLIFE MANAGEMENT AREA
WILLIAMS WMA WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 9/12/2025

   This project is designed to create a wetland pool located on the Williams Wildlife Management Area (WMA), O'Brien County, IA. Work under this project includes earthfill (+-8,000 CY), excavation of a spillway, tile work (investigation, installation, breaks, surface outlets) and installation of an inline water control structure.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




BOONE -- PROJECT # 25-02-08-02                3/27/2025                Small Project Letting
LEDGES STATE PARK
FOUNDATION REMOVAL AND FILL
Proposal Guarantee: $0
Completion Date: 6/15/2025

   The Ranger's house located at 1519 250th Street, Madrid, IA 50156 is scheduled to be moved to another location by May 1, 2025. The remaining portions of the residence need to be removed and disposed of offsite. Remaining portions consists of concrete foundations, concrete flatwork, a wooden deck, a gravel drive, a lift station, a light pole, and an electrical panel. Clean fill material obtained from behind the park office is to be hauled in to fill in the excavation and compacted to level ground.

Contact:
Heath Delzell
(515) 979-0104
heath.delzell@dnr.iowa.gov




MONTGOMERY -- PROJECT # 25-04-69-01                3/27/2025                Small Project Letting
VIKING LAKE
VIKING LAKE SOH REMEDIATION
Proposal Guarantee: $0
Completion Date: 6/13/2025

   The Ranger's house at Viking Lake State Park, 2910 Aldersgate Drive, Villisca, IA 50864 has been moved to another location leaving the foundations, floors and miscellaneous items that need to be demolished and disposed of offsite. The contractor shall provide all materials, labor, and equipment necessary to complete this work as well as fill foundation void with adjacent soils placed and compacted to match surrounding ground.

Contact:
Zach Gunsolley
515-250-3713
zach.gunsolley@dnr.iowa.gov