PROJECTS LETTING -  March , 2013

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

CLAYTON 06-03-22-02 Pikes Peak State Park - Well Replacement-2013-03-20   Bid Completion detail
CASS 13-04-15-02 Lake Anita - East Silt Pond Renovation-2013-03-21   Bid Completion detail
DUBUQUE 11-03-31-02 Mines of Spain - FEMA 2010 & 2011 Flood Damage-2013-03-21   Bid Completion detail
JASPER 12-05-50-01 Rock Creek State Park - ADA Accessible fishing pier-2013-03-21   Bid Completion detail
HARDIN 12-02-42-01 Pine Lake State Park - Plug old well at Park Residence-2013-03-28   Bid Completion detail
CERRO GORDO 12-03-17-04 Bayside Lake Patrol Statiion - Bayside Fueling Station-2013-04-04   Bid Completion detail
DICKINSON 14-01-30-01 Welsh Lake WPA - DOT Wetland Mitigation - Lago Site #2 Channel-2013-04-11   Bid Completion detail
CASS 13-04-15-01 SW Regional Office, Lewis - Office remodel/addition-2013-04-18   Bid Completion detail
JACKSON 12-06-49-03 Green Island - Channel Clean Out-2013-04-18   Bid Completion detail
JOHNSON 09-06-52-08 Hawkeye Wildlife Management Area - Scour Hole Repair-2013-04-18   Bid Completion detail
LUCAS 12-05-59-04 Chariton Research Station - Parking Lot Paving-2013-04-18   Bid Completion detail
LUCAS 13-05-59-02 Williamson Pond - Boat Ramp-2013-04-18   Bid Completion detail
MARSHALL 13-05-64-01 Hendrickson Marsh - Outlet Repair-2013-04-18   Bid Completion detail




CASS -- PROJECT # 13-04-15-02                3/21/2013                Large Project Letting
LAKE ANITA
EAST SILT POND RENOVATION
Proposal Guarantee: $3,500
Completion Date: 8/31/2013

   MECHANICAL DREDGE OF SEDIMENT POND, HAUL MATERIAL AND DISPOSE OF ON-SITE. MODIFICATION OF EXISTING CONCRETE BOX CULVERT.

ESTIMATED QUANTITIES:
    Sediment/Soil Dredge & Haul     8,000 C.Y.
    Box Culvert Modification      1 L.S.
    Seed, Fertilize, & Mulch     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DUBUQUE -- PROJECT # 11-03-31-02                3/21/2013                Large Project Letting
MINES OF SPAIN
FEMA 2010 & 2011 FLOOD DAMAGE
Proposal Guarantee: $5,000
Completion Date: 6/15/2013

   During the incident period of the 2010, 2011 spring and summer season heavy rains and flooding caused widespread damage to the Mines of Spain State Park. Damage consist of erosion of 6 hiking and ski trails as well as parking lots and a timber retaining wall. A mandatory Pre-Bid Meeting is to be scheduled before March 21, 2013. Please contact Mel Pacovsky for information of date and time. (319)240-3553

ESTIMATED QUANTITIES:
    Surfacing, 3/4" Crushed Stone     223 Tons
    Mobilization     1 L.S.
    Excavation, Class 10     1,665 C.Y.
    Revetment, Class D Riprap     221 Tons
    Install Silt Fence     400 L.F.
    Reshaping Exisitng Trails     1,850 L.F.
    Reposition Floating Trail Bridges     1 L.S.
    Straighten and/or Replace 1-1/2" Anchor Pipes     25 Each
    Boards, Pressure Treated 2"x6"x10'     5 Each
    Replace Floating Trail Bridge Abutment     1 Each
    Repair Wood Retaining Wall     1 L.S.
    Replace 2" Pipe Collar     3 Each
    Construct Check Dams     4 Each
    Engineering Fabric     220 S.Y.
    Stabilization, Crop Seeding     2 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JASPER -- PROJECT # 12-05-50-01                3/21/2013                Large Project Letting
ROCK CREEK STATE PARK
ADA ACCESSIBLE FISHING PIER
Proposal Guarantee: $6,000
Completion Date: 7/31/2013

   A fishing pier with an aggregate trail and parking in Rock Creek State Park, Jasper County, Iowa.

ESTIMATED QUANTITIES:
    6" Topsoil Cut & Waste     12 C.Y.
    Geofabric     124 S.Y.
    Revetment, Class "D" Rip-Rap     455 Tons
    Fishing Pier ( Exclude Pilings)     1 L.S.
    Surfacing, Class "A" Crushed Stone     39 Tons
    Supply HP 12 x 53 Steel Piling     300 L.F.
    Drive HP 12 x 53 Steel Piling     300 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CASS -- PROJECT # 13-04-15-01                4/18/2013                Large Project Letting
SW REGIONAL OFFICE, LEWIS
OFFICE REMODEL/ADDITION
Proposal Guarantee: $10,000
Completion Date: 12/31/2013

   This project will accommodate the growing staff at the new centralized SW Regional office. Fisheries & Wildlife currently have offices in this building and will be joined by Parks staff. The existing building will remain and a new 1,000 sf addition will house two new open offices (2 staff each), one conference/break room (12 person) and a new restroom. The existing building will have two offices converted into a modern laboratory with fume hood. The exterior of the building will mimic the original construction and site will be minimally disturbed.

ESTIMATED QUANTITIES:
    DEMOLITION (INCLUDES SITE RESTORATION)     1 L.S.
    CLEARING AND GRUBBING     1 L.S.
    ON-SITE TOPSOIL (STRIP, SALVAGE & RESPREAD)     25 C.Y.
    EXCAVATION CLASS 10     1 L.S.
    SANITARY SERVICE     1 Each
    4" PCC SIDEWALK     19 S.Y.
    CONVENTIONAL SEEDING (URBAN)     0.1 Acres
    12" FILTER SOCK     100 L.F.
    COONSTRUCTION STAKING     1 L.S.
    NEW ADDITION AND INTERIOR RENOVATION OF EXISTING BUILDING AND ALL COMPONENTS     1 L.S.
ALTERNATE#1 
Alternate
    REMOVE AND REPLACE SIDING WITH CEMENT BOARD SIDING ON EXISTING BUILDING     1 L.S.
ALTERNATE#2 
Alternate
    REMOVE AND REPLACE ALL WINDOWS ON EXISTING BUILDING NOT COVERED IN THE BASE BID     1 L.S.
ALTERNATE#3 
Alternate
    REMOVE AND REPLACE VINYL FLOOR AND RUBBER BASE IN EXISTING BUILDING WITH SPECIFIED FLOOR COVERING     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JACKSON -- PROJECT # 12-06-49-03                4/18/2013                Large Project Letting
GREEN ISLAND
CHANNEL CLEAN OUT
Proposal Guarantee: $5,000
Completion Date: 9/30/2013

   Project Description: Clean out boat access channel over an approximate distance of 9,100 feet, from Blake's Lake boat ramp to the outlet structure on the Mississippi River levy. Dig channel to elevation 581 (avg. depth of 2.5 feet as constructed) with a 10 foot bottom and 2 to 1 side slopes. A new 2,000 foot channel will be constructed into Blake's Lake from the existing channel.

ESTIMATED QUANTITIES:
 
    Mobilization     1 L.S.
    Channel Excavation (Approx. 11,100 LF)     1 L.S.
    Seeding     1 L.S.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HARDIN -- PROJECT # 12-02-42-01                3/28/2013                Small Project Letting
PINE LAKE STATE PARK
PLUG OLD WELL AT PARK RESIDENCE
Proposal Guarantee: $0
Completion Date: 5/15/2013

   This project is for the plugging of an abandoned 6" diameter, 110 feet deep water well at the park residence at Pine Lake State Park in Hardin County.

Contact:
Don Labate
515-250-3714
[email protected]




CERRO GORDO -- PROJECT # 12-03-17-04                4/4/2013                Small Project Letting
BAYSIDE LAKE PATROL STATIION
BAYSIDE FUELING STATION
Proposal Guarantee:
Completion Date: 5/17/2013

   Project consists of providing a 500 gallon fire guard tank with hose reel platform on a concrete slab including a roof & fenced enclosure. Tank accessories shall include overfill valve, tank gauge, PV vents, emergency vents, fill containment, fill cap & adaptor, and interstical gauge. Hose reels shall be equiped with 125' 3/4" hose with 3/4" hose swivels & nozzel. Project shall be complete including electrical hookup, painting, decals & signage, and environmental work required by the State Fire Marshall. Project shall be completed by Iowa certified fuel tank installers. An onsite pre-bid viewing will be held at the Bayside DNR Patrol Facility located at 15398 Crane Street, Clear Lake, IA, 10AM March 28, 2013.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




DICKINSON -- PROJECT # 14-01-30-01                4/11/2013                Small Project Letting
WELSH LAKE WPA
DOT WETLAND MITIGATION - LAGO SITE #2 CHANNEL
Proposal Guarantee: $0
Completion Date: 6/21/2013

   This project is designed to serve as a water outlet area for a future DOT wetland mitigation project in the Welsh Lake wildlife area. Work under this project includes excavation of 1,139 ft of channel, 290 ft of 8" tile installation, tile breaks, and erosion control measures.

Contact:
Jeff Felts

[email protected]




JOHNSON -- PROJECT # 09-06-52-08                4/18/2013                Small Project Letting
HAWKEYE WILDLIFE MANAGEMENT AREA
SCOUR HOLE REPAIR
Proposal Guarantee: $0
Completion Date: 5/15/2013

   This project consists of repairing a scour hole with broken concrete and incidental work as required by the DNR construction inspector.

Contact:
Bruce Flippin

[email protected]




LUCAS -- PROJECT # 12-05-59-04                4/18/2013                Small Project Letting
CHARITON RESEARCH STATION
PARKING LOT PAVING
Proposal Guarantee: $0
Completion Date: 8/31/2013

   This project consists of the construction of a concrete (PCC) parking lot to serve the needs of the Chariton Research Facility.

Contact:
Jason Kruse

[email protected]




LUCAS -- PROJECT # 13-05-59-02                4/18/2013                Small Project Letting
WILLIAMSON POND
BOAT RAMP
Proposal Guarantee: $0
Completion Date: 10/31/2013

   This project consists of the construction of a concrete boat ramp and rock surfacing of an adjacent parking lot.

Contact:
Jason Kruse

[email protected]




MARSHALL -- PROJECT # 13-05-64-01                4/18/2013                Small Project Letting
HENDRICKSON MARSH
OUTLET REPAIR
Proposal Guarantee: $0
Completion Date: 7/31/2013

   This project consists of placement of riprap with revetment grout at the outlet of the spillway.

Contact:
Jason Kruse

[email protected]