PROJECTS LETTING -  March , 2013

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

BOONE 10-02-08-05 Boone Waterworks Dam - Des Moines - Rock Placement-2013-03-07   Bid Completion detail
BOONE 10-02-08-05 Boone Waterworks Dam - Des Moines - Rock and Delivery-2013-03-07   Bid Completion detail
FREMONT 14-04-36-01 Nishnabotna Wildlife Unit - Repair boat ramp-2013-03-07   Bid Completion detail
SHELBY 13-04-83-04 Prairie Rose - Rock Chute Sediment Removal-2013-03-07   Bid Completion detail
JOHNSON 10-06-52-06 Hawkeye Wildlife Area - Plum Creek inlet repair/ HM-2013-03-11   Bid Completion detail
POLK 12-02-77-16 Big Creek - East Boat Ramp Extensions-2013-03-14   Bid Completion detail
WEBSTER 12-02-94-04 Brushy Creek Recreation Area - Demolition of PK RES Garage-2013-03-14   Bid Completion detail
WEBSTER 11-02-94-9 Brushy Creek SRA - Construct New 2 Car Garage-2013-03-14   Bid Completion detail
CLAYTON 06-03-22-02 Pikes Peak State Park - Well Replacement-2013-03-20   Bid Completion detail
CASS 13-04-15-02 Lake Anita - East Silt Pond Renovation-2013-03-21   Bid Completion detail
DUBUQUE 11-03-31-02 Mines of Spain - FEMA 2010 & 2011 Flood Damage-2013-03-21   Bid Completion detail
JASPER 12-05-50-01 Rock Creek State Park - ADA Accessible fishing pier-2013-03-21   Bid Completion detail
HARDIN 12-02-42-01 Pine Lake State Park - Plug old well at Park Residence-2013-03-28   Bid Completion detail
CERRO GORDO 12-03-17-04 Bayside Lake Patrol Statiion - Bayside Fueling Station-2013-04-04   Bid Completion detail




BOONE -- PROJECT # 10-02-08-05                3/7/2013                Large Project Letting
BOONE WATERWORKS DAM - DES MOINES
ROCK PLACEMENT
Proposal Guarantee: $9,761
Completion Date: 1/31/2014

   Rock Placement

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Place Base Stone     6,100 Tons
    Place Crushed Stone Fill - 6" Minus     610 Tons
    Place Derrick Stone     1,525 Tons
    Place 3 Ft. x 3 Ft. Weir Stone     245 Each
    Grading, Demo and Misc. Work     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BOONE -- PROJECT # 10-02-08-05                3/7/2013                Large Project Letting
BOONE WATERWORKS DAM - DES MOINES
ROCK AND DELIVERY
Proposal Guarantee: $37,153
Completion Date: 1/31/2014

   Rock and Delivery

ESTIMATED QUANTITIES:
    Base Stone - SG 2.6     6,100 Tons
    Crushed Stone Fill - 6" Minus     610 Tons
    Derrick Stone - SG 2.6     1,525 Tons
    3 Ft. x 3 Ft. Weir Stone     245 Each
    2" Road Gravel - Unwashed     300 Tons

See Plans & Specs for Notice to Bidders

Drawings and Specs are not available in electronic format for this project

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CASS -- PROJECT # 13-04-15-02                3/21/2013                Large Project Letting
LAKE ANITA
EAST SILT POND RENOVATION
Proposal Guarantee: $3,500
Completion Date: 8/31/2013

   MECHANICAL DREDGE OF SEDIMENT POND, HAUL MATERIAL AND DISPOSE OF ON-SITE. MODIFICATION OF EXISTING CONCRETE BOX CULVERT.

ESTIMATED QUANTITIES:
    Sediment/Soil Dredge & Haul     8,000 C.Y.
    Box Culvert Modification      1 L.S.
    Seed, Fertilize, & Mulch     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DUBUQUE -- PROJECT # 11-03-31-02                3/21/2013                Large Project Letting
MINES OF SPAIN
FEMA 2010 & 2011 FLOOD DAMAGE
Proposal Guarantee: $5,000
Completion Date: 6/15/2013

   During the incident period of the 2010, 2011 spring and summer season heavy rains and flooding caused widespread damage to the Mines of Spain State Park. Damage consist of erosion of 6 hiking and ski trails as well as parking lots and a timber retaining wall. A mandatory Pre-Bid Meeting is to be scheduled before March 21, 2013. Please contact Mel Pacovsky for information of date and time. (319)240-3553

ESTIMATED QUANTITIES:
    Surfacing, 3/4" Crushed Stone     223 Tons
    Mobilization     1 L.S.
    Excavation, Class 10     1,665 C.Y.
    Revetment, Class D Riprap     221 Tons
    Install Silt Fence     400 L.F.
    Reshaping Exisitng Trails     1,850 L.F.
    Reposition Floating Trail Bridges     1 L.S.
    Straighten and/or Replace 1-1/2" Anchor Pipes     25 Each
    Boards, Pressure Treated 2"x6"x10'     5 Each
    Replace Floating Trail Bridge Abutment     1 Each
    Repair Wood Retaining Wall     1 L.S.
    Replace 2" Pipe Collar     3 Each
    Construct Check Dams     4 Each
    Engineering Fabric     220 S.Y.
    Stabilization, Crop Seeding     2 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JASPER -- PROJECT # 12-05-50-01                3/21/2013                Large Project Letting
ROCK CREEK STATE PARK
ADA ACCESSIBLE FISHING PIER
Proposal Guarantee: $6,000
Completion Date: 7/31/2013

   A fishing pier with an aggregate trail and parking in Rock Creek State Park, Jasper County, Iowa.

ESTIMATED QUANTITIES:
    6" Topsoil Cut & Waste     12 C.Y.
    Geofabric     124 S.Y.
    Revetment, Class "D" Rip-Rap     455 Tons
    Fishing Pier ( Exclude Pilings)     1 L.S.
    Surfacing, Class "A" Crushed Stone     39 Tons
    Supply HP 12 x 53 Steel Piling     300 L.F.
    Drive HP 12 x 53 Steel Piling     300 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




FREMONT -- PROJECT # 14-04-36-01                3/7/2013                Small Project Letting
NISHNABOTNA WILDLIFE UNIT
REPAIR BOAT RAMP
Proposal Guarantee: $0
Completion Date: 3/29/2013

   Provide 200 ton of Class "E" riprap fill and a 20' long, 14' wide section of concrete boat ramp.

Contact:
Mark Johnson
515-250-3713
[email protected]




SHELBY -- PROJECT # 13-04-83-04                3/7/2013                Small Project Letting
PRAIRIE ROSE
ROCK CHUTE SEDIMENT REMOVAL
Proposal Guarantee: $0
Completion Date: 8/23/2013

   Remove and dispose of 8,000 cy of sediment from the southeast wetland. Then seed all disturbed areas.

Contact:
Mark Johnson
515-250-3713
[email protected]




JOHNSON -- PROJECT # 10-06-52-06                3/11/2013                Small Project Letting
HAWKEYE WILDLIFE AREA
PLUM CREEK INLET REPAIR/ HM
Proposal Guarantee:
Completion Date: 5/15/2013

   Plum Creek Inlet Structure Repair: Flood damage repair including rip rap replacement, bank fill /reconstruction, and sheet piling/concrete wall reconstruction on the existing Plum Creek water control structure in the Hawkeye Wildlife Management Area, Johnson County, Iowa.

Contact:
Bruce Flippin

[email protected]




POLK -- PROJECT # 12-02-77-16                3/14/2013                Small Project Letting
BIG CREEK
EAST BOAT RAMP EXTENSIONS
Proposal Guarantee: $0
Completion Date: 5/15/2013

   This project entails the purchase and placement of Armorflex (cable connected concrete blocks) and associated work at the East Boat Ramp at Big Creek State Park in Polk County.

Contact:
Don Labate
515-250-3714
[email protected]




WEBSTER -- PROJECT # 12-02-94-04                3/14/2013                Small Project Letting
BRUSHY CREEK RECREATION AREA
DEMOLITION OF PK RES GARAGE
Proposal Guarantee: $0
Completion Date: 5/1/2013

   This project entails the demolition and removal from site of an existing two car garage, with an alternate to remove the foundation and slab. Also a part of this project is the demolition and removal of a damaged concrete, wood roofed, shelter house along an equestrian trail. All work is at Brushy Creek State Park in Webster County.

Contact:
Don Labate
515-250-3714
[email protected]




WEBSTER -- PROJECT # 11-02-94-9                3/14/2013                Small Project Letting
BRUSHY CREEK SRA
CONSTRUCT NEW 2 CAR GARAGE
Proposal Guarantee: $0
Completion Date: 7/1/2013

   This project entails the addition of a two car garage and other miscellaneous work to an existing residence with an alternate to replace the siding on the entire residence at Brushy Creek State Park in Webster County.

Contact:
Don Labate
515-250-3714
[email protected]




HARDIN -- PROJECT # 12-02-42-01                3/28/2013                Small Project Letting
PINE LAKE STATE PARK
PLUG OLD WELL AT PARK RESIDENCE
Proposal Guarantee: $0
Completion Date: 5/15/2013

   This project is for the plugging of an abandoned 6" diameter, 110 feet deep water well at the park residence at Pine Lake State Park in Hardin County.

Contact:
Don Labate
515-250-3714
[email protected]




CERRO GORDO -- PROJECT # 12-03-17-04                4/4/2013                Small Project Letting
BAYSIDE LAKE PATROL STATIION
BAYSIDE FUELING STATION
Proposal Guarantee:
Completion Date: 5/17/2013

   Project consists of providing a 500 gallon fire guard tank with hose reel platform on a concrete slab including a roof & fenced enclosure. Tank accessories shall include overfill valve, tank gauge, PV vents, emergency vents, fill containment, fill cap & adaptor, and interstical gauge. Hose reels shall be equiped with 125' 3/4" hose with 3/4" hose swivels & nozzel. Project shall be complete including electrical hookup, painting, decals & signage, and environmental work required by the State Fire Marshall. Project shall be completed by Iowa certified fuel tank installers. An onsite pre-bid viewing will be held at the Bayside DNR Patrol Facility located at 15398 Crane Street, Clear Lake, IA, 10AM March 28, 2013.

Contact:
Mel Pacovsky
319-240-3553
[email protected]