PROJECTS LETTING -  March , 2018

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

ALLAMAKEE 18-03-03-07 Yellow River State Forest - Fueling Station-2018-03-01   Bid Completion detail
APPANOOSE 18-05-04-10 Rathbun Fish Hatchery - Boiler Room Roof Replacement (REBID)-2018-03-01   Bid Completion detail
PLYMOUTH 18-01-75-01 Deer Creek WMA - Diversion Channel Repairs-2018-03-01   Bid Completion detail
UNION 17-04-88-05 Other - 3 Mile Lake erosion control -2018-03-01   Bid Completion detail
PALO ALTO 18-01-74-01 Fallow Marsh Wetland Complex - Mesenbrink Tract Wetland Restoration-2018-03-15   Bid Completion detail
APPANOOSE 18-05-04-12 Honey Creek Resort - Three Park Benches-2018-03-22   Bid Completion detail
BOONE 17-02-08-03 Ledges - Road Repair-2018-03-22   Bid Completion detail
DALLAS 18-04-25-01 Beaver Lake - Beaver Lake Shoreline Stabilization-2018-03-22   Bid Completion detail
LYON 18-01-60-01 Big Sioux River Complex - Lee Tract Pond Structure Replacement-2018-03-22   Bid Completion detail
SAC 13-01-81-01 Black Hawk Lake - Fishing Pier and Shelter-2018-03-22   Bid Completion detail
SAC 13-01-81-01 Black Hawk Lake - Fishing Pier and Shelter-2018-03-22   Bid Completion detail
VAN BUREN 17-06-89-02 Lake Sugema WMA - PCC Parking Lot Paving-2018-03-22   Bid Completion detail
EMMET 18-01-32-02 Ingham-High Wildlife Unit Headquarters - Ingham-High HQ Wetland Restoration-2018-03-29   Bid Completion detail




BOONE -- PROJECT # 17-02-08-03                3/22/2018                Large Project Letting
LEDGES
ROAD REPAIR
Proposal Guarantee: $25,000
Completion Date: 7/27/2018

   This project consists of the repair of a slide area in Ledges State Park. 2350 CY of excavation, 3700 ton of shot rock, 463 ton of revetment, 250 ton of roadstone, 212 ton of porous backfill, 420 LF of ditch grading, 450 LF of perforated subdrain, 462 SY of pavement removal and replacement, 305 LF of storm sewer, 5 intakes, 3 anti-seepage collars, the removal of 3 existing culverts, 0.5 acres of seeding and 460 LF of 8-inch wattles.

ESTIMATED QUANTITIES:
    MOBILIZATION & DEMOBILIZATION     1 L.S.
    TRAFFIC CONTROL     1 L.S.
    SITE PREP & CLEARING     1 L.S.
    CULVERT REMOVAL & DISPOSAL     3 Each
    CULVERT PLUGGING     1 Each
    DITCH GRADING     420 L.F.
    EXCAVATION     2,350 C.Y.
    TOPSOIL IMPORT     65 C.Y.
    HMA REMOVAL & DISPOSAL     462 S.Y.
    PCC PAVEMENT (7")     462 S.Y.
    POROUS BACKFILL     360 Tons
    CLASS A ROADSTONE     340 Tons
    CLASS E REVETMENT (BANK STABILIZATION)     370 Tons
    CLASS E REVETMENT (CHECK DAM)     120 Tons
    SHOT ROCK (BENCH BACKFILL)     3,870 Tons
    CLASS E REVETMENT (PIPE OUTLET)     8 Tons
    SUBDRAIN, PERFORATED, DUAL WALL HDPE, 6"     450 L.F.
    STORM SEWER, NON-PERFORATED, DUAL WALL HDPE, 18"     305 L.F.
    INTAKE, SW-512, 30"     5 Each
    ANTI-SEEPAGE COLLAR     3 Each
    SEEDING, DITCH MIX     0.5 Acres
    EROSION CONTROL, 8" WATTLES     460 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DALLAS -- PROJECT # 18-04-25-01                3/22/2018                Large Project Letting
BEAVER LAKE
BEAVER LAKE SHORELINE STABILIZATION
Proposal Guarantee: $7,500
Completion Date: 9/7/2018

   This project involves 3,540 Linear Feet of Shoreline Stabilization at Beaver Lake with Class 'E' Revetment and any incidental work as required by the D.N.R Field Engineer in Dallas Co. IA

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Class "E" Riprap     2,800 Tons
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SAC -- PROJECT # 13-01-81-01                3/22/2018                Large Project Letting
BLACK HAWK LAKE
FISHING PIER AND SHELTER
Proposal Guarantee: $14,000
Completion Date: 8/31/2018

   Black Hawk State Park and lake needs a fishing pier and shelter. This new pier will provide access for fishing on the lake year round and in inclement weather as the structural will provide shelter. This pier and structural will be accessible, have accessible parking nearby and have lighting in low-light conditions.

ESTIMATED QUANTITIES:
    6" PCC PARKING PAD AND SUBBASE     600 S.F.
    ADA SIGNAGE, STRIPING, AND PRECAST WHEEL STOPS     1 L.S.
    5" PCC TRAIL AND SUBBASE     590 S.F.
    FISHING PIER, BOARDWALK, STEEL PILING, ABUTMENT & ACCESSORIES     1 L.S.
    FISHING SHELTER AND ACCESSORIES     1 L.S.
    ELECTRICAL AND LIGHTING     1 L.S.
    RIPRAP / SHORELINE ARMORING     20 Tons
    FINISHING, SEEDING, RESTORATION     1 L.S.
    MOBILIZATION     1 L.S.
Alternate
    COMPOSITE DECKING     2,640 S.F.
Alternate
    TREATED DECKING     2,640 S.F.
Alternate
    PLASTIC LUMBER RAILS     1 L.S.
Alternate
    TREATED RAILS     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




VAN BUREN -- PROJECT # 17-06-89-02                3/22/2018                Large Project Letting
LAKE SUGEMA WMA
PCC PARKING LOT PAVING
Proposal Guarantee: $80,000
Completion Date: 9/30/2018

   This project consists of removing the existing HMA pavement and base material and placing 6" PCC pavement over 6" granular subbase at two boat ramp parking lots.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Construction Survey     1 L.S.
    Parking Bumpers - Remove and Replace     54 Each
    Striping     9,159 L.F.
    ADA Parking Signs     12 Each
    Pavement Removal     21,884 S.Y.
    Class 10 Excavation, Waste     3,624 C.F.
    6" PCC     21,736 S.Y.
    Special Backfill     7,091 Tons
    6" Sloped Curb     524 L.F.
    24" Dia. RCP     250 L.F.
    24" Dia. RCP Apron     8 Each
    Site Restoration     1 L.S.
    Traffic Control     1 L.S.
    Rigging Lane Signs     8 Each
    Painted Handicap Parking Pavement Marking     12 Each
    Extend 24" Dia. CMP Culvert     40 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




ALLAMAKEE -- PROJECT # 18-03-03-07                3/1/2018                Small Project Letting
YELLOW RIVER STATE FOREST
FUELING STATION
Proposal Guarantee: $0
Completion Date: 5/1/2018

   The project consists of contractor furnishing and installation of two 530 gallon double walled fuel tanks on a concrete slab including tank venting equipment & monitoring, product fill & dispensing accessories, and provide power from a DNR block storage building at Yellow River State Forest saw mill area near Harpers Ferry, Iowa. Estimated cost $15,000. Proposal may be obtained by e-mailing name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




APPANOOSE -- PROJECT # 18-05-04-10                3/1/2018                Small Project Letting
RATHBUN FISH HATCHERY
BOILER ROOM ROOF REPLACEMENT (REBID)
Proposal Guarantee: $0
Completion Date: 6/29/2018

   Rathbun Fish Hatchery's boiler room has a ballasted EPDM roof which needs to be replaced. The membrane is stretched and has many different leaks. The contractor shall remove all ballast on the roof, then remove the entire EPDM membrane and all associated items. Existing rigid insulation to remain. Clean entire roof, add new 1/4" dens deck prime and, if needed, new wood substrate. Contractor to install new PVC membrane roof following all manufacturer's instructions for install and create new drainage flow as shown on plans. Contractor to install new pipe, vent and curb flashing, boots and drainage items. Contractor to install new curb and scupper flashing and two new head box downspouts. As an alternate bid item on this contract the contractor shall remove existing liners from all gutters and install new PVC membrane within all gutters. Contractor must demonstrate a minimum of ten (10) previous projects installing fully-adhered PVC, TPO or EPDM membrane projects similar to the scope of this project.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




PLYMOUTH -- PROJECT # 18-01-75-01                3/1/2018                Small Project Letting
DEER CREEK WMA
DIVERSION CHANNEL REPAIRS
Proposal Guarantee: $0
Completion Date: 6/8/2018

   This project is designed to repair two soil erosion areas on an existing diversion channel located in the Deer Creek Wildlife Management Area (WMA). Work will include earthen excavation and fill to re-grade the repair areas and improve the function of the channel. Installation of rolled erosion control products to stabilize the repairs, and seeding will also be required.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




UNION -- PROJECT # 17-04-88-05                3/1/2018                Small Project Letting
OTHER
3 MILE LAKE EROSION CONTROL
Proposal Guarantee: $0
Completion Date: 5/17/2018

   Erosion Repairs West Boundary - 3 Mile Lake, Union County, Iowa. North Area: -30 tons Class "E" Riprap Contractor to clear all trees and brush form the north area (approx. 50'x70') and reshape drainage area then purchase and install Class "E" riprap on the top of the drainage area. Trees and brush from the clearing and grubbing to be placed in the washout below the riprap. South Area: -45 tons Class "E" Riprap Contractor to clear and grub all trees and brush from the pond dike and within 20 feet of the emergency spillway. (approx. 90'x100') Brush to be placed in drainage area below the emergency spillway then purchase and install Class "E" riprap on the top of the drainage area. * Site Restoration required on the access route and both sites.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




PALO ALTO -- PROJECT # 18-01-74-01                3/15/2018                Small Project Letting
FALLOW MARSH WETLAND COMPLEX
MESENBRINK TRACT WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 8/15/2018

   This project is designed to repair and reconfigure an existing wetland pool along with creation of two new wetland elements on the Mesenbrink Tract of land in the Fallow Marsh Wetland Complex, Palo Alto County, Iowa. Work under this project includes earthfill (dike construction), excavation (channel & shallow water), tile investigation, tile breaks, tile/pipe installation (multiple sizes), and a 48" diameter water control structure.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




APPANOOSE -- PROJECT # 18-05-04-12                3/22/2018                Small Project Letting
HONEY CREEK RESORT
THREE PARK BENCHES
Proposal Guarantee: $0
Completion Date: 4/30/2018

   Contractor will assemble and install three park benches on concrete slabs in Honey Creek Resort. Contractor will pour concrete. DNR will provide bench kits. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




LYON -- PROJECT # 18-01-60-01                3/22/2018                Small Project Letting
BIG SIOUX RIVER COMPLEX
LEE TRACT POND STRUCTURE REPLACEMENT
Proposal Guarantee: $0
Completion Date: 6/15/2018

   This project is designed to replace an existing 18" CMP culvert that controls the water level of a pond located on the Lee Tract of the Big Sioux River Wildlife Complex (Lyon, Co.). Work will include removal of the old pipe, installation of 115' of new 18" CMP, backfill & grading, along with a small amount of stone protection at both ends of the pipe. Installation of rolled erosion control product to stabilize the repair, and seeding will also be required.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




EMMET -- PROJECT # 18-01-32-02                3/29/2018                Small Project Letting
INGHAM-HIGH WILDLIFE UNIT HEADQUARTERS
INGHAM-HIGH HQ WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 8/1/2018

   This project is designed to restore/create two wetland pool areas at the Ingham-High Wildlife Unit Headquarters, Emmet County, Iowa. Work under this project includes earthfill (dike construction), excavation (channel), tile investigation, tile breaks, and 12" CMP culvert installation.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov