PROJECTS LETTING -  March , 2015

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

JONES 14-06-53-01 Wapsipinicon State Park - Sand Filter At Park Manager’s Residence-2015-03-05   Bid Completion detail
LINN 14-06-57-06 Pleasant Creek Recreation Area - Water Softener-2015-03-05   Bid Completion detail
MUSCATINE 10-06-70-02 Wildcat Den State Park - PCC Trail-2015-03-05   Bid Completion detail
PALO ALTO 15-01-74-01 Dewey's Pasture WMA - Kelley Tract Wetland Restoration Phase II-2015-03-05   Bid Completion detail
APPANOOSE 15-05-04-03 Rathbun Fish Hatchery - Alarm Panel in Recirculation Building-2015-03-12   Bid Completion detail
FREMONT 15-04-36-02 Copeland Bend WMA - Access Road-2015-03-19   Bid Completion detail
MARION 15-05-63-03 Box Car Access - Roadway Reconstruction-2015-03-19   Bid Completion detail
MONONA 15-01-67-01 Louisville Bend WMA - Louisville Bend Flood Repair-2015-03-19   Bid Completion detail
FREMONT 15-04-36-03 Nishnabotna Wildlife Unit - Riverton WMA Dike South Repairs-2015-03-26   Bid Completion detail
FREMONT 15-04-36-01 Waubonsie - campground road repairs-2015-03-26   Bid Completion detail
JACKSON 15-06-49-02 Bellevue State Park - Residence Landscaping-2015-03-26   Bid Completion detail




FREMONT -- PROJECT # 15-04-36-02                3/19/2015                Large Project Letting
COPELAND BEND WMA
ACCESS ROAD
Proposal Guarantee: $5,000
Completion Date: 9/1/2015

   This project involves construction of a granular surfaced access roadway with granular surfaced parking areas at Copeland Bend Area, in Nishnabotna Wildlife Unit and any incidental work as required by the project documents and the D.N.R inspector in Fremont County, Iowa.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clearing and Grubbing     1 L.S.
    Blading and Shaping     1 L.S.
    Surfacing, Class A Crushed stone     2,738 Tons
    Engineering Fabric     11,867 S.Y.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MARION -- PROJECT # 15-05-63-03                3/19/2015                Large Project Letting
BOX CAR ACCESS
ROADWAY RECONSTRUCTION
Proposal Guarantee: $10,000
Completion Date: 9/1/2015

   This project consists of re-grading the existing roadway, adding granular surfacing to the roadway, armoring the foreslope, and incidental work as required by the DNR District Engineer

ESTIMATED QUANTITIES:
    Mobilization & Miscellaneous     1 L.S.
    Traffic Control / Signage     1 L.S.
    Construction Survey     1 L.S.
    Excavation     3,000 C.Y.
    Erosion Control     1 L.S.
    Subgrade Preparation (+2' on either side of granular surfacing)     7,400 S.Y.
    Erosion Stone     1,500 Tons
    Granular Surfacing     1,900 Tons
    Topsoil: Strip, Stockpile & Respread (4")     450 C.Y.
    Seeding - Stabilization Crop     4,000 S.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JONES -- PROJECT # 14-06-53-01                3/5/2015                Small Project Letting
WAPSIPINICON STATE PARK
SAND FILTER AT PARK MANAGER'S RESIDENCE
Proposal Guarantee: $0
Completion Date: 5/29/2015

   This Project consist of removing old septic tank and leach field and installing a new septic tank and a sand filter for Park Manager's residence at Wapsipinicon State park.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




LINN -- PROJECT # 14-06-57-06                3/5/2015                Small Project Letting
PLEASANT CREEK RECREATION AREA
WATER SOFTENER
Proposal Guarantee: $0
Completion Date: 4/30/2015

   This project consists of the installation of a water softener system for the park distribution system, and incidental work as required by the DNR District Engineer.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




MUSCATINE -- PROJECT # 10-06-70-02                3/5/2015                Small Project Letting
WILDCAT DEN STATE PARK
PCC TRAIL
Proposal Guarantee: $0
Completion Date: 5/31/2015

   This project consists of PCC paving a trail from the restroom to the mill, and incidental work as required by the DNR District Engineer

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




PALO ALTO -- PROJECT # 15-01-74-01                3/5/2015                Small Project Letting
DEWEY'S PASTURE WMA
KELLEY TRACT WETLAND RESTORATION PHASE II
Proposal Guarantee: $0
Completion Date: 5/15/2015

   This project is designed to create a larger wetland basin from an existing basin on the Kelley Tract of property located in the Dewey's Pasture Wildlife Management Area in Palo Alto County, Iowa. Work under this project includes removal of an existing earthen dike, shallow basin excavation, and some tile search.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




APPANOOSE -- PROJECT # 15-05-04-03                3/12/2015                Small Project Letting
RATHBUN FISH HATCHERY
ALARM PANEL IN RECIRCULATION BUILDING
Proposal Guarantee: $0
Completion Date: 5/8/2015

   Build, mount, and program alarm/control panel which will control fish feeders and other devices. Alarms will include low water level, low dissolved oxygen, and motor offline. Alarm/Control Panel will communicate with other panels within the Rathbun Fish Hatchery complex. There is not a formal pre-bid meeting scheduled for this project. However, bidders are encouraged to arrange for an onsite meeting to review the scope of work prior to submitting a bid. Please contact Jason Kruse to arrange for a pre-bid meeting. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




MONONA -- PROJECT # 15-01-67-01                3/19/2015                Small Project Letting
LOUISVILLE BEND WMA
LOUISVILLE BEND FLOOD REPAIR
Proposal Guarantee: $0
Completion Date: 6/5/2015

   This project is designed to remove flood deposited sand and add base stone to select areas of a 15' wide access road in the Louisville Bend WMA, Monona County, Iowa. Work under this project includes removal of sand down to the original road surface in deposit areas, and level grading with stone base installation in areas that were cut during flooding. The removed sand shall be hauled and stockpiled near the roadway entrance.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




FREMONT -- PROJECT # 15-04-36-03                3/26/2015                Small Project Letting
NISHNABOTNA WILDLIFE UNIT
RIVERTON WMA DIKE SOUTH REPAIRS
Proposal Guarantee: $0
Completion Date: 6/1/2015

   Repair five slough areas and one hole in the south dike at the Riverton WMA using fill material at the site. Seeding of all disturbed areas required when earthwork completed.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




FREMONT -- PROJECT # 15-04-36-01                3/26/2015                Small Project Letting
WAUBONSIE
CAMPGROUND ROAD REPAIRS
Proposal Guarantee: $0
Completion Date: 4/20/2015

   Fill washout in Waubonsie State Park Campground with soil up to original grade with borrow material from old building site. Construct a 250' long curb and gutter along roadway with a riprap splash apron at outlet. Repair roadway with PCC patch and seed all disturbed areas.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




JACKSON -- PROJECT # 15-06-49-02                3/26/2015                Small Project Letting
BELLEVUE STATE PARK
RESIDENCE LANDSCAPING
Proposal Guarantee: $0
Completion Date: 5/15/2015

   This project consists of grading around the house, sidewalk and driveway replacement, ditch cleanout, downspout tiling, and incidental work as required by the DNR Engineer.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov