PROJECTS LETTING -  February , 2025

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

CLAY 24-01-21-01 Elk Lake WPA - Elk Lake WPA Wetland Restoration-2025-02-27   Bid Completion detail
LUCAS 25-05-59-03 Red Haw State Park - Shower Building Roof Replacement-2025-02-27   Bid Completion detail
TAYLOR 25-04-87-01 Lake of Three Fires - Spillway Rehabilitation -2025-02-27   Bid Completion detail
CERRO GORDO 23-03-17-08 Clear Lake State Park - Water Meter Enclosure-2025-03-06   Bid Completion detail
WINNEBAGO 24-02-95-01 Clear Lake Wildlife Unit - Langesen WPA 2 - NAWCA-2025-03-13   Bid Completion detail
DICKINSON 22-01-30-08 Spring Run Wildlife Management Area - Shooting Range Upgrade - contracted-2025-03-20   Bid Completion detail
DICKINSON 22-01-30-08 Spring Run Wildlife Management Area - Shooting Range Upgrade-2025-03-20   Bid Completion detail
JACKSON 25-06-49-03 Green Island WMA - Levee Repair-2025-03-20   Bid Completion detail
O'BRIEN 21-01-71-01 Williams Wildlife Management Area - Williams WMA Wetland Restoration-2025-03-20   Bid Completion detail




DICKINSON -- PROJECT # 22-01-30-08                3/20/2025                Large Project Letting
SPRING RUN WILDLIFE MANAGEMENT AREA
SHOOTING RANGE UPGRADE - CONTRACTED
Proposal Guarantee: $25,000
Completion Date: 9/15/2025

   This project consists of improving the existing shooting range by constructing earthen berms, concrete sidewalks, storm sewer, gravel parking, and steel-framed shooting structures for a 30-yard range, a 100-yard range, and a shotgun area.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Construction Staking     1 L.S.
    NPDES General Permit #2     1 L.S.
    8" Mulch Sock     2,539 L.F.
    Class A Crushed Stone     212 Tons
    Class 10 Excavation, Embankment (on site)     3,290 C.Y.
    Class 10 Excavation, Embankment (import)     4,586 C.Y.
    Fence - Barbed     272 L.F.
    Parking Posts     37 Each
    Granular Subbase     105 Tons
    ADA Sign     1 Each
    5" Reinforced Concrete     496 S.Y.
    6" Reinforced Concrete     36 S.Y.
    Pavement Striping     96 L.F.
    Type 1, Class "A" Subdrain, 6" dia.     418 L.F.
    12" RCP Class III     213 L.F.
    12" RCP FES     1 Each
    SW-512 Circular Area Intake     4 Each
    30 Yd Shooting Structure     1 L.S.
    100 Yd Shooting Structure     1 L.S.
    Shooting Benches (install only)     4 Each
    Baffle A     1 Each
    Baffle B     1 Each
    Baffle C     1 Each
Alternate
    Baffle D     1 Each
Alternate
    Baffle A     3 Each
Alternate
    Eyebrow Structure     1 Each
Alternate
    Adjacent Borrow Location     4,586 C.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JACKSON -- PROJECT # 25-06-49-03                3/20/2025                Large Project Letting
GREEN ISLAND WMA
LEVEE REPAIR
Proposal Guarantee: $12,500
Completion Date: 6/20/2025

   This project will repair a breach in the main levee along the Mississippi River within the Green Island Wildlife Management Area.

ESTIMATED QUANTITIES:
    CHANNEL EXCAVATION, CLASS 13 WASTE     2,400 C.Y.
    EMBANKMENT-IN-PLACE     5,794 C.Y.
    GRANULAR MATERIAL     135 Tons
    MOBILIZATION     1 L.S.
    DE-WATERING     1 L.S.
    SEEDING AND FERTILIZING     0.8 Acres
    WOOD EXCELSIOR MAT     2,788 S.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CLAY -- PROJECT # 24-01-21-01                2/27/2025                Small Project Letting
ELK LAKE WPA
ELK LAKE WPA WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 10/3/2025

   This project is designed to enhance a wetland pool located on the south side of Elk Lake, Clay County, IA. Work under this project includes removal of an existing culvert, earthfill (2,700 CY of berm construction), excavation of a spillway, tile investigation, tile breaks, and installation of an inline water control structure. Call or e-mail for plans and specs.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




LUCAS -- PROJECT # 25-05-59-03                2/27/2025                Small Project Letting
RED HAW STATE PARK
SHOWER BUILDING ROOF REPLACEMENT
Proposal Guarantee: $0
Completion Date: 6/30/2025

   This project consists of replacing shingles, underlayment, drip edge, and gutters on the shower building in the campground at Red Haw State Park. Send an email to jason.kruse@dnr.iowa.gov to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




TAYLOR -- PROJECT # 25-04-87-01                2/27/2025                Small Project Letting
LAKE OF THREE FIRES
SPILLWAY REHABILITATION
Proposal Guarantee: $0
Completion Date: 10/17/2025

   Exploratory project. Excavate, examine, and repair the drain pipe and the drain pipe connection if repairs are needed. Cut holes in the reinforced spillway floor and determine if a void exists under the spillway floor. If a void exists, completely fill the void with flowable mortar. Place joint sealer and backer rod along deteriorated keyway joint. Send an email to request plans and proposal form.

Contact:
Zach Gunsolley
515-250-3713
zach.gunsolley@dnr.iowa.gov




CERRO GORDO -- PROJECT # 23-03-17-08                3/6/2025                Small Project Letting
CLEAR LAKE STATE PARK
WATER METER ENCLOSURE
Proposal Guarantee: $0
Completion Date: 5/29/2025

   This project shall install a water meter and backflow prevention for a 3" water service connection at the office in Clear Lake State Park. Includes an aluminum heated enclosure on a concrete pad to house the meter and backflow assembly.

Contact:
Kenneth Howe
319-240-3553
Kenneth.howe@dnr.iowa.gov




WINNEBAGO -- PROJECT # 24-02-95-01                3/13/2025                Small Project Letting
CLEAR LAKE WILDLIFE UNIT
LANGESEN WPA 2 - NAWCA
Proposal Guarantee: $0
Completion Date: 9/15/2025

   The purpose of this project is to construct three earthen ditch plugs and one concrete water control structure. Contractor to complete final grading, seedbed preparation, and furnish seed and mulch. The DNR will plant the seed and place the mulch.

Contact:
Heath Delzell
(515) 979-0104
heath.delzell@dnr.iowa.gov




O'BRIEN -- PROJECT # 21-01-71-01                3/20/2025                Small Project Letting
WILLIAMS WILDLIFE MANAGEMENT AREA
WILLIAMS WMA WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 9/12/2025

   This project is designed to create a wetland pool located on the Williams Wildlife Management Area (WMA), O'Brien County, IA. Work under this project includes earthfill (+-8,000 CY), excavation of a spillway, tile work (investigation, installation, breaks, surface outlets) and installation of an inline water control structure.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov