PROJECTS LETTING -  February , 2024

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

BUTLER 23-03-12-01 Big Marsh Wildlife Management Area - Lundie Wetland-Shallow Water Excavation-2024-02-22   Bid Completion detail
CERRO GORDO 23-03-17-07 McIntosh Woods State Park - Shelter Roof Replacements (REBID)-2024-02-22   Bid Completion detail
DICKINSON 22-01-30-06 Spirit Lake Hatchery - Road Maintenance-2024-02-22   Bid Completion detail
JACKSON 24-06-49-02 Maquoketa Caves - Sewer improvements-2024-02-22   Bid Completion detail
JONES 23-06-53-01 Wapsipinicon State Park - FEMA Flood Repairs-2024-02-22   Bid Completion detail
MONONA 21-01-67-05 Lewis and Clark State Park - Visitor Center Water Mitigation-2024-02-22   Bid Completion detail
JONES 23-06-53-02 Wapsipinicon & Palisade-Kepler State Park - Fuel Tank Replacement -2024-02-29   Bid Completion detail
WASHINGTON 23-06-92-02 Lake Darling - culvert replacement on road-2024-03-07   Bid Completion detail
ALLAMAKEE 22-03-03-01 Yellow River State Forest - Road Maintenance-2024-03-21   Bid Completion detail
APPANOOSE 24-05-04-01 Rathbun Wildlife Unit - Build-out Phase I-2024-03-21   Bid Completion detail
MONONA 21-01-67-06 Lewis and Clark State Park - Visitor Center Water Mitigation (REBID)-2024-03-21   Bid Completion detail
MUSCATINE 23-06-70-01 Wiese Slough WMA - Road Maintenance-2024-03-21   Bid Completion detail
TAYLOR 24-04-87-01 Mount Ayr Fisheries Management Unit - Jetty Repair at Lake of 3 Fires-2024-03-21   Bid Completion detail




DICKINSON -- PROJECT # 22-01-30-06                2/22/2024                Large Project Letting
SPIRIT LAKE HATCHERY
ROAD MAINTENANCE
Proposal Guarantee: $6,250
Completion Date: 9/15/2024

   This project consists of grading and placing rock on approximately 0.35 miles rock roads, parking lots, and shoulders. Patching, cleaning and filling cracks and fog sealing approximately 0.3 mile of HMA pavement and parking lots of varying widths.

ESTIMATED QUANTITIES:
    Asphalt Emulsion-Fog Seal (Pavement)     275 GAL.
    Patch, Full-Depth Finish, 6-inch, By Area, HMA     105.6 S.Y.
    Patch, Full-Depth Finish, 6-inch, By Count, HMA     4 Each
    Subbase (Patch)     17.7 C.Y.
    Transverse Joint Repair     24 Tons
    Longitudinal Joint Repair (HMA)     150 L.F.
    Cleaning and Filling Cracks (HMA Surfaces)     0.5 MI.
    Sealer Material (HMA Surfaces)     250 LB.
    Slurry Level     0.5 MI.
    Safety Closure     4 Each
    Painted Pavement Marking, High-Build Waterborne     15 STA.
    Painted Symbol+Legend, High-Build Waterborne     2 Each
    Signing     1 Each
    Reconstruction of Roadbed - Blading/Shaping     19.8 STA.
    Granular Shoulder, Type B     2.2 Tons
    Granular Surface, Class A Crushed Stone     428 Tons
    Traffic Control     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JONES -- PROJECT # 23-06-53-01                2/22/2024                Large Project Letting
WAPSIPINICON STATE PARK
FEMA FLOOD REPAIRS
Proposal Guarantee: $25,000
Completion Date: 9/27/2024

   Project includes constructing 18 weirs in the Wapsipinicon River with 450 large boulders and other revetment stone, also includes a bank repair at Dutch Creek.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Construction Survey     1 L.S.
    Clearing and Grubbing     0.75 Acres
    Large Boulders     900 Each
    Revetment, Class B     540 Tons
    Rock, 6" Minus     270 Tons
    Engineering Fabric     68 S.Y.
    Revetment, Class E     80 Tons
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MONONA -- PROJECT # 21-01-67-05                2/22/2024                Large Project Letting
LEWIS AND CLARK STATE PARK
VISITOR CENTER WATER MITIGATION
Proposal Guarantee: $4,000
Completion Date: 6/30/2024

   Lewis and Clark State Park has a Visitor Center built in 2009, the north side of the building leaks water through a side-wall pipe entrance. The side door area and sidewalk is heaved and in need of replacement. This project will waterproof the incoming pipe, install new subgrade drain pipes and backfill, and concrete sidewalks and stoop footings.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Demolition and Excavation     1 L.S.
    Pipe Caulking     1 L.S.
    4" Perforated Drain Tile     140 L.F.
    6" Dual Wall Pipe     190 L.F.
    8" Dual Wall Pipe     40 L.F.
    HDPE Pipe Fitting     1 L.S.
    Pea Gravel Backfill     100 C.Y.
    EPDM Membrane and Filter Fabric     1 L.S.
    5" PCC Sidewalk and Subbase     55 S.Y.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




ALLAMAKEE -- PROJECT # 22-03-03-01                3/21/2024                Large Project Letting
YELLOW RIVER STATE FOREST
ROAD MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 9/6/2024

   This project consists of granular roadway maintenance (blading/shaping/spreading rock), the replacement of several CMP culverts, extension, aprons, a grate and associated miscellaneous work.

ESTIMATED QUANTITIES:
    2102 - EMBANKMENT-IN-PLACE, CONTRACTOR FURNISHED     60 C.Y.
    2125 - RESHAPING DITCH     5 STA.
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING     199.56 STA.
    2312 - GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE     1,684 Tons
    2312 - GRANULAR SURFACING ON ROAD, CRUSHED STONE - 2 - INCH     216 Tons
    2402 - GRANULAR BACKFILL     50 Tons
    2416 - RMV+REINSTALL RIGID PIPE CULV LE 36" (36-INCH RCP)     36 L.F.
    2417 - APRON, METAL (CMP), 18"     2 Each
    2417 - APRON, METAL (CMP), 24"     1 Each
    2417 - APRON, METAL (CMP), 30"     1 Each
    2417 - APRON, METAL (CMP), 36"     1 Each
    2417 - APRON GUARD, METAL(CMP), 36"     1 Each
    2417 - CULV, CMP RDWY, 18" (30 - FOOT LENGTHS)     60 L.F.
    2417 - CULV, CMP RDWY, 24"     10 L.F.
    2417 - CULV, CMP RDWY, 36"     20 L.F.
    2417 - CONNECTING BAND, CMP RDWY, 18"     2 Each
    2417 - CONNECTING BAND, CMP RDWY, 24"     1 Each
    2417 - CONNECTING BAND, CMP RDWY, 30"     1 Each
    2417 - CONNECTING BAND, CMP RDWY, 36"     1 Each
    2507 - REVETMENT, CLASS E     54 Tons
    2507 - EROSION STONE     70 Tons
    2518 - SAFETY CLOSURE     7 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 24-05-04-01                3/21/2024                Large Project Letting
RATHBUN WILDLIFE UNIT
BUILD-OUT PHASE I
Proposal Guarantee: $4,000
Completion Date: 8/31/2024

   Rathbun Wildlife Unit is located in Appanoose County, Iowa. There is an existing cold storage building on site that has received new close-cell spray foam insulation. This storage building will be built-out into an office and garage area in the future. This Phase I will focus on framing the storage area and office side, installing new steel liner panel in the storage section and electrical throughout this area. The office side will remain blank in preparation of Phase II but will have rough framing completed.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Concrete Slab Demolition     1 L.S.
    Electrical and Lighting     1 L.S.
    Plumbing and Piping     1 L.S.
    Shop Heaters and Accessories     1 L.S.
    Framing and Steel Liner Panel     1 L.S.
    Restroom Concrete     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MUSCATINE -- PROJECT # 23-06-70-01                3/21/2024                Large Project Letting
WIESE SLOUGH WMA
ROAD MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 8/9/2024

   This project consists of granular roadway maintenance - blading/shaping, ditch cleaning, spreading new rock, and the replacement of 2 CMP culverts with RCP culverts. Possible alternate bid items include a granular boat ramp (in water) installation.

ESTIMATED QUANTITIES:
    2101 - CLEARING     1 L.S.
    2104 - EXCAVATION, CL 10, CHANNEL     148 C.Y.
    2125 - RESHAPING/CLEANING DITCHES     5 STA.
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING     97.11 STA.
    2312 - GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE     1,941 Tons
    2402 - GRANULAR BACKFILL     52 Tons
    2416 - APRON, CONC, 30"     2 Each
    2416 - APRON, CONC, 36"     2 Each
    2416 - CULV, CONC RDWY PIPE, 30"     24 L.F.
    2416 - CULV, CONC RDWY PIPE, 36"     24 L.F.
    2507 - REVETMENT, CLASS E     36 Tons
    2507 - EROSION STONE     36 Tons
    2518 - SAFETY CLOSURE     2 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.
Alternate
    2104 - EXCAVATION, CL 10, CHANNEL     76 C.Y.
Alternate
    2402 - GRANULAR BACKFILL     32 Tons
Alternate
    2507 - EROSION STONE     81 Tons
Alternate
    2499 - 6-INCH GEOWEB     900 S.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BUTLER -- PROJECT # 23-03-12-01                2/22/2024                Small Project Letting
BIG MARSH WILDLIFE MANAGEMENT AREA
LUNDIE WETLAND-SHALLOW WATER EXCAVATION
Proposal Guarantee:
Completion Date: 6/15/2024

   Project consists of shallow water excavation of a wetland

Contact:
Kenneth Howe
319-240-3553
Kenneth.howe@dnr.iowa.gov




CERRO GORDO -- PROJECT # 23-03-17-07                2/22/2024                Small Project Letting
MCINTOSH WOODS STATE PARK
SHELTER ROOF REPLACEMENTS (REBID)
Proposal Guarantee: $0
Completion Date: 6/30/2024

   McIntosh Woods State Park has a Shelter and Fish Cleaning Shelter, and Ventura Access also has a shelter. All of these structures are in need of a new roof. This project will include removing all existing roofing, new fascia boards, and new steel roofing and underlayment on the structures. The Fish Cleaning Shelter will have its skylights removed and filled-in. Ventura Access and Fish Cleaning Shelter shall be part of the base bid and McIntosh Woods Shelter as an alternate.

Contact:
Kenneth Howe
319-240-3553
Kenneth.howe@dnr.iowa.gov




JACKSON -- PROJECT # 24-06-49-02                2/22/2024                Small Project Letting
MAQUOKETA CAVES
SEWER IMPROVEMENTS
Proposal Guarantee:
Completion Date: 5/1/2024

   Project includes replacing two air release valves in a sanitary sewer for main, installing two 1,500 gallon septic tanks, jetting 2070 LF of sewer pipe, and widening access road.

Contact:
Mark Moeller
515-214-9532
mark.moeller@dnr.iowa.gov




JONES -- PROJECT # 23-06-53-02                2/29/2024                Small Project Letting
WAPSIPINICON & PALISADE-KEPLER STATE PARK
FUEL TANK REPLACEMENT
Proposal Guarantee:
Completion Date: 10/31/2024

   Project includes replacing existing fuel tanks at Palisades-Kepler State Park and Wapsipinicon State Park.

Contact:
Mark Moeller
515-214-9532
mark.moeller@dnr.iowa.gov




WASHINGTON -- PROJECT # 23-06-92-02                3/7/2024                Small Project Letting
LAKE DARLING
CULVERT REPLACEMENT ON ROAD
Proposal Guarantee:
Completion Date: 5/17/2024

   This project will remove and replace 34 SY of 7" depth PCC pavement, remove 30 LF of 24" CMP culvert and replace with 28 LF of 24" RCP with an apron, and install a new storm sewer manhole. Located at the main road through Lake Darling State Park.

Contact:
Mark Moeller
515-214-9532
mark.moeller@dnr.iowa.gov




MONONA -- PROJECT # 21-01-67-06                3/21/2024                Small Project Letting
LEWIS AND CLARK STATE PARK
VISITOR CENTER WATER MITIGATION (REBID)
Proposal Guarantee: $0
Completion Date: 9/30/2024

   This project is designed to water proof the north wall foundation and pipe penetration location at the Lewis & Clark State Park Visitor Center. Work includes removal of existing sidewalks and door stoop, excavation for the installation of waterproofing foundation membrane, granular backfill with subdrain, new PCC sidewalk and stoop footing, and new underground piping for the building downspouts. Contact Jeff Felts (jeff.felts@dnr.iowa.gov) for plans and contract documents.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




TAYLOR -- PROJECT # 24-04-87-01                3/21/2024                Small Project Letting
MOUNT AYR FISHERIES MANAGEMENT UNIT
JETTY REPAIR AT LAKE OF 3 FIRES
Proposal Guarantee: $0
Completion Date: 8/21/2024

   This project is designed to repair/replace the riprap on 5 fishing jetties at Lake of 3 Fires State Park, Taylor County, Iowa. Work includes some brush removal and bank shaping and then placing 1020 tons of new riprap on five fishing jetties in the park. Site Restoration required on all disturbed areas.

Contact:
Zach Gunsolley

zach.gunsolley@dnr.iowa.gov