The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual. Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms, Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.
Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis.
To subscribe to this list, click here.
The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.
To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website.
You may obtain a free download from 


Plans can be ordered by following this link: http://bit.ly/IADNRPlans 
|
|
WARREN -- PROJECT # 15-05-91-02 2/12/2015 Small Project Letting
|
HOOPER AREA
|
| PARKING LOT STABILIZATION |
Proposal Guarantee: $0
|
Completion Date: 6/15/2015
|
| | This project consists of installing a grid system over the existing rock parking lot. The grid system will then be filled with rock. This will prevent erosion of stone surfacing. Send an email to request plans.
|
Contact: Jason Kruse (515) 250-3707 jason.kruse@dnr.iowa.gov
|
|
APPANOOSE -- PROJECT # 13-05-04-03 2/19/2015 Small Project Letting
|
RATHBUN FISH HATCHERY
|
| AQUACULTURE ELECTRICAL SERVICE |
Proposal Guarantee: $0
|
Completion Date: 4/30/2015
|
| | This project consists of feeding electrical service to the new Recirculation Building and providing electricity to several pieces of equipment within that building. A Pre-Bid Meeting will be held at the Recirculation Building at 10:00am, Thursday, February 12, 2015. Contractors should first check in with the receptionist in the main hatchery building. Alternate dates/times can be arranged by calling Jason Kruse.
Send an email to request plans.
|
Contact: Jason Kruse (515) 250-3707 jason.kruse@dnr.iowa.gov
|
|
MUSCATINE -- PROJECT # 14-06-70-02 2/19/2015 Small Project Letting
|
FAIRPORT RECREATION AREA
|
| VALVE REPLACEMENT |
Proposal Guarantee: $0
|
Completion Date: 4/1/2015
|
| | This project consists of replacing two 6" valves comlpete with pneumatic actuators.
|
Contact: Michael Dufoe Michael.dufoe@dnr.iowa.gov
|
|
SHELBY -- PROJECT # 15-04-83-01 2/26/2015 Small Project Letting
|
PRAIRIE ROSE
|
| ROCK CHUTE INCREASE STORAGE |
Proposal Guarantee: $0
|
Completion Date: 8/21/2015
|
| | Remove and dispose of 8,000 cy of sediment from the northeast wetland as shown on the plan. Then seed all disturbed areas.
|
Contact: Mark Johnson 515-250-3713 mark.johnson@dnr.iowa.gov
|
|
JONES -- PROJECT # 14-06-53-01 3/5/2015 Small Project Letting
|
WAPSIPINICON STATE PARK
|
| SAND FILTER AT PARK MANAGER'S RESIDENCE |
Proposal Guarantee: $0
|
Completion Date: 5/29/2015
|
| | This Project consist of removing old septic tank and leach field and installing a new septic tank and a sand filter for Park Manager's residence at Wapsipinicon State park.
|
Contact: Michael Dufoe Michael.dufoe@dnr.iowa.gov
|
|
LINN -- PROJECT # 14-06-57-06 3/5/2015 Small Project Letting
|
PLEASANT CREEK RECREATION AREA
|
| WATER SOFTENER |
Proposal Guarantee: $0
|
Completion Date: 4/30/2015
|
| | This project consists of the installation of a water softener system for the park distribution system, and incidental work as required by the DNR District Engineer.
|
Contact: Michael Dufoe Michael.dufoe@dnr.iowa.gov
|
|
MUSCATINE -- PROJECT # 10-06-70-02 3/5/2015 Small Project Letting
|
WILDCAT DEN STATE PARK
|
| PCC TRAIL |
Proposal Guarantee: $0
|
Completion Date: 5/31/2015
|
| | This project consists of PCC paving a trail from the restroom to the mill, and incidental work as required by the DNR District Engineer
|
Contact: Michael Dufoe Michael.dufoe@dnr.iowa.gov
|
|
PALO ALTO -- PROJECT # 15-01-74-01 3/5/2015 Small Project Letting
|
DEWEY'S PASTURE WMA
|
| KELLEY TRACT WETLAND RESTORATION PHASE II |
Proposal Guarantee: $0
|
Completion Date: 5/15/2015
|
| | This project is designed to create a larger wetland basin from an existing basin on the Kelley Tract of property located in the Dewey's Pasture Wildlife Management Area in Palo Alto County, Iowa. Work under this project includes removal of an existing earthen dike, shallow basin excavation, and some tile search.
|
Contact: Jeff Felts 515-250-3712 Jeff.Felts@dnr.iowa.gov
|