The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual. Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms, Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.
Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis.
To subscribe to this list, click here.
The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.
To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website.
You may obtain a free download from
|
MADISON -- PROJECT # 18-04-61-02 2/6/2020 Small Project Letting
|
BADGER CREEK RECREATION AREA
|
CLEAR BRUSH AND TREES -DITCH (REBID) |
Proposal Guarantee:
|
Completion Date: 3/31/2020
|
| Clear Brush & Trees - Ditch (REBID), Badger Creek Recreation Area (120th LN)
Cut down all trees and shrubs along roadway that are 4" in diameter or larger along both sides of paved
roadway.
All trees and shrubs shall be cut at ground level and treated to prevent regrowth.
All cut trees and shrubs shall be placed in road ditch and not in crop fields, no branches shall be left
within 5' of pavement edge.
There is approximately 45 trees on the north side of the roadway, 15 trees on the east side of the roadway
by the boat ramp and 130 trees on the south side of the roadway.
The trees removed along the road in the boat ramp area shall be placed in a pile off the northwest side of
the parking area. Other piles could be made along the roadway if the trees will not fit in the roadway
ditch in areas that are not crop field.
Brush is expected to be removed flush with the ground.
Tearing up or digging in the ground is not expected on this project.
Disturbed areas to be repaired and seeded by contractor at no additional cost to the Iowa DNR.
Contractor shall take extra care to protect trees and property outside the construction area.
Contractor will be responsible for materials and equipment stored on site.
|
Contact: Mark Johnson 515-250-3713 mark.johnson@dnr.iowa.gov
|
|
HARDIN -- PROJECT # 20-02-42-02 2/13/2020 Small Project Letting
|
STEAMBOAT ROCK
|
RIPRAP REPAIR |
Proposal Guarantee: $0
|
Completion Date: 3/20/2020
|
| This project consists of placing 150 tons of Class D Revetment along the end of the dam, to prevent the dam from washing out.
|
Contact: Don Labate 515-250-3714 Don.Labate@dnr.iowa.gov
|
|
PLYMOUTH -- PROJECT # 20-01-75-01 2/13/2020 Small Project Letting
|
DEER CREEK WILDLIFE MANAGEMENT AREA (WMA)
|
DEER CREEK WMA ROAD MAINTENANCE |
Proposal Guarantee: $0
|
Completion Date: 6/19/2020
|
| This project is designed to repair drainage issues and add granular surfacing to the roadways at the Deer Creek Wildlife Management Area (WMA) in Plymouth County, Iowa. Work under this project includes some grading, ditch cleaning, surface leveling, and installation of Macadam & Road Stone granular materials with proper slopes for drainage.
|
Contact: Jeff Felts 515-250-3712 Jeff.Felts@dnr.iowa.gov
|
|
WINNEBAGO -- PROJECT # 19-02-95-03 2/13/2020 Small Project Letting
|
CLEAR LAKE WILDLIFE UNIT
|
LANGESEN WETLAND RESTORATION REBID |
Proposal Guarantee: $0
|
Completion Date: 9/30/2020
|
| This project consists of a wetland restoration by construction of a small earth filled embankment, shallow water excavation, installing a stop log water control structure, and breaking and plugging existing tiles and other work as designated by the DNR Engineer at Winnebago Co IA.
|
Contact: Don Labate 515-250-3714 Don.Labate@dnr.iowa.gov
|
|
EMMET -- PROJECT # 20-01-32-01 2/20/2020 Small Project Letting
|
OKAMANPEDEN STATE PARK
|
ROAD MAINTENANCE |
Proposal Guarantee: $0
|
Completion Date: 6/19/2020
|
| This project is designed to add granular surfacing to select roadway sections at Okamanpedan State Park in Emmet County, Iowa. Work under this project includes some minor grading /surface leveling and installation of Macadam & Class "A" granular material with proper slopes for drainage.
|
Contact: Jeff Felts 515-250-3712 Jeff.Felts@dnr.iowa.gov
|
|
PLYMOUTH -- PROJECT # 19-01-75-01 2/20/2020 Small Project Letting
|
DEER CREEK WILDLIFE MANAGEMENT AREA (WMA)
|
BUILDING SITE DEMOLITION |
Proposal Guarantee: $0
|
Completion Date: 6/30/2020
|
| The intent of this project is the demolition, disposal, and general clean-up of an abandoned farmstead located on the Deer Creek Wildlife Management Area (WMA), in Plymouth County. The majority of the work is involved in the demolition of 24 structures of various size and any associated foundations. Another major component of the project is removal of discovered asbestos containing materials in a house structure
|
Contact: Jeff Felts 515-250-3712 Jeff.Felts@dnr.iowa.gov
|