PROJECTS LETTING -  January , 2012

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

FREMONT 12-04-36-01 Waubonsie State Park - Interpretive kiosk-2012-01-26   Bid Completion detail
PLYMOUTH 09-01-75-01 Stone State Park - Septic System Replacement-2012-01-26   Bid Completion detail
DELAWARE 11-03-28-06 Bixby State Park - Flood repairs-2012-02-02   Bid Completion detail
PALO ALTO 12-01-74-02 Lost Island Lake - Lost Island Restoration Phase II-2012-02-02   Bid Completion detail
JOHNSON 12-06-52-04 Lake Macbride State Park - Steel Piling Support Structure for Boardwalk-2012-02-16   Bid Completion detail
KEOKUK 09-05-54-01 Hayesville Bend WMA - Flood Damage Repairs-2012-02-16   Bid Completion detail
LUCAS 12-05-59-01 Chariton Fisheries Research Station - Remodel-2012-02-16   Bid Completion detail
LUCAS 12-05-59-02 Chariton Fisheries Research Station - HVAC System Replacement-2012-02-16   Bid Completion detail
LUCAS 12-05-59-03 Chariton Fisheries Research Station - Phone System Replacement-2012-02-16   Bid Completion detail
MAHASKA 05-05-62-03 Lake Keomah State Park - Office & Service Facility-2012-02-16   Bid Completion detail
RINGGOLD 12-04-80-01 Kellerton Wildlife Area - New headquarters -2012-02-16   Bid Completion detail
DELAWARE 12-03-28-02 Twin Bridges Park Fishing Area - Stocking Road and Bank Repair-2012-02-23   Bid Completion detail
POLK 12-02-77-09 Big Creek State Park - Trails Program Building Demolition-2012-02-23   Bid Completion detail




KEOKUK -- PROJECT # 09-05-54-01                2/16/2012                Large Project Letting
HAYESVILLE BEND WMA
FLOOD DAMAGE REPAIRS
Proposal Guarantee: $10,000
Completion Date: 7/1/2012

   This project consists of the repair of an existing earthen dike damaged by floods, installation of a revetment emergency spillway, a new CMP water control structure and incidental work as required by the Plans and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Excavation, Dike Repair, In Place     4,584 C.Y.
    Excavation, Silt Removal     3,222 C.Y.
    Revetment, Class "D" Riprap     4,500 Tons
    Engineering Fabric     5,556 S.Y.
    Seeding, Fertilizing & Mulching     1 L.S.
Alternate
    Excavation, Structural     300 C.Y.
Alternate
    Water Control Structure, Complete     1 L.S.
Alternate
    Bedding, Class "A" Cr. Stone     52 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MAHASKA -- PROJECT # 05-05-62-03                2/16/2012                Large Project Letting
LAKE KEOMAH STATE PARK
OFFICE & SERVICE FACILITY
Proposal Guarantee: $10,000
Completion Date: 10/31/2012

   This project consists of the construction of a one story, pre-engineered structural insulated panel (SIP) building with standing seam metal roofing and cement board siding, approximately 45' x 80', including three heated bays, a mechanical/electrical room, one restroom, a conference room, open office area and a storage room. The work also includes concrete and class "A" crushed stone paving, concrete paving, septic sewer, water and electrical services. Project number 05-05-62-03

ESTIMATED QUANTITIES:
    Earthwork & All Underground Utilities     1 L.S.
    6" Class "A" Crushed Stone Paving     1 L.S.
    Site Restoration     1 L.S.
    Chain Link Fence & Gate     1 L.S.
    6" Exterior Concrete Apron     1 L.S.
    Concrete Parking Lot, Paving and Sidewalk     1 L.S.
    45'-0"x80'-0" SIPs Building with All internal components and Vertical Geothermal Wells     1 L.S.
    Rain Garden     1 L.S.
Alternate
    Horizontal Trench Geothermal Wells     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




RINGGOLD -- PROJECT # 12-04-80-01                2/16/2012                Large Project Letting
KELLERTON WILDLIFE AREA
NEW HEADQUARTERS
Proposal Guarantee: $10,000
Completion Date: 10/31/2012

   This project consists of the construction of a one story, pre-engineered structural insulated panel building (alt. - pole building) with standing seam metal roofing and metal siding, approximately 50' x 110', including three heated bays, a mechanical/electrical room, two restrooms, a conference room, open office area, 4 offices, and a storage room. The work also includes concrete and class "A" crushed stone paving, concrete paving, septic sewer, water and electrical services. Project number 12-04-80-01.

ESTIMATED QUANTITIES:
    Earthwork & All Utilities     1 L.S.
    6" Class "A" Crushed Stone Paving     1 L.S.
    Site Restoration     1 L.S.
    Chain Link Fence & Gate     1 L.S.
    6" Exterior Concrete Apron     1 L.S.
    Concrete Parking Lot, Driving Loop and Sidewalk     1 L.S.
    50'-0"x110'-0" SIPs Building w/ Furnace HVAC System     1 L.S.
Alternate
    50'-0"x110'-0" SIPs Building w/ Geothermal (vertical wells) HVAC System      1 L.S.
Alternate
    50'-0"x110'-0" Pole Building w/ Furnace HVAC System      1 L.S.
Alternate
    50'-0"x110'-0" Pole Building w/ Geothermal HVAC System      1 L.S.
Alternate
    PROVIDE PER UNIT PRICE FOR ADDITIONAL Geothermal wells     1 Units
Alternate
    PROVIDE DEDUCT AMOUNT FOR HORIZONTAL INSTALLATION OF WELLS ON ALL GEOTHERMAL SYSTEMS (ALT# 1 & 3) IN LIEU OF VERTICAL INSTALLATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




FREMONT -- PROJECT # 12-04-36-01                1/26/2012                Small Project Letting
WAUBONSIE STATE PARK
INTERPRETIVE KIOSK
Proposal Guarantee:
Completion Date: 5/31/2012

   THIS PROJECT CONSISTS OF THE CONSTRUCTION OF AN INTERPRETIVE KIOSK, THE SITEWORK ASSOCIATED WITH THE KIOSK, THE REMOVAL OF 16 S.F. OF PAVEMENT., AND ALL OTHER ITEMS DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS AND AS SPECIFIED BY THE DNR CONSTRUCTION.

Contact:
Mark Johnson
515-250-3713
[email protected]




PLYMOUTH -- PROJECT # 09-01-75-01                1/26/2012                Small Project Letting
STONE STATE PARK
SEPTIC SYSTEM REPLACEMENT
Proposal Guarantee: $0
Completion Date: 5/31/2012

   The intent of this project is to fully replace the septic system currently serving a residence and park lodge in Stone State Park. Work includes but is not limited to abandonment of the old system sewer system, installation of a new leech field and septic tank, installation of new 4 and 6 inch piping, and all associated connections. Pipe installation is a combination of open cut and bored sections.

Contact:
Jeff Felts
515-250-3712
[email protected]




DELAWARE -- PROJECT # 11-03-28-06                2/2/2012                Small Project Letting
BIXBY STATE PARK
FLOOD REPAIRS
Proposal Guarantee:
Completion Date: 6/22/2012

   Project consists of placing gabion baskets filled with erosion stone to construct a vertical wall with a shotcrete facing along a dryrun creek, removing debris ,replacing CMP culvert and placing granualar surfacing on parking lot

Contact:
Mel Pacovsky
319-240-3553
[email protected]




PALO ALTO -- PROJECT # 12-01-74-02                2/2/2012                Small Project Letting
LOST ISLAND LAKE
LOST ISLAND RESTORATION PHASE II
Proposal Guarantee: $0
Completion Date: 6/1/2012

   This project is designed to add and expand upon work completed last year on a variety of structures and marsh excavations around Lost Island Lake in Palo Alto County, Iowa. Work under this project includes channel excavation, aluminum & Steel water control structure component fabrication, and granular surfacing for access.

Contact:
Jeff Felts
515-250-3712
[email protected]




JOHNSON -- PROJECT # 12-06-52-04                2/16/2012                Small Project Letting
LAKE MACBRIDE STATE PARK
STEEL PILING SUPPORT STRUCTURE FOR BOARDWALK
Proposal Guarantee:
Completion Date: 3/30/2012

   This project entails the driving of steel H piles in the lake bed and the fabication and erection of a steel framing structure to accept a future wood boardwalk at the Lake Macbride concession building at Lake Macbride State Park.

Contact:
Don Labate
515-250-3714
[email protected]




LUCAS -- PROJECT # 12-05-59-01                2/16/2012                Small Project Letting
CHARITON FISHERIES RESEARCH STATION
REMODEL
Proposal Guarantee:
Completion Date: 5/31/2012

   Install new steel roof, windows, exterior doors, insulated vinyl siding and foam board, aluminum soffits, aluminum facia, seamless gutters, downspouts, and reinsulated attic at the Chariton Fisheries Research Station in Red Haw State Park near Chariton, IA. Performance bond required. Davis-Bacon wages apply.

Contact:
Jason Kruse
(515) 250-3707
[email protected]




LUCAS -- PROJECT # 12-05-59-02                2/16/2012                Small Project Letting
CHARITON FISHERIES RESEARCH STATION
HVAC SYSTEM REPLACEMENT
Proposal Guarantee:
Completion Date: 3/31/2012

   Remove existing HVAC system and install a new high efficiency propane forced air furnace, central air conditioner, required duct work and items incidental to installation and finishing. HVAC system is to be sized for the existing building. Furnace is to have a minimum 95% efficiency rating.

Contact:
Jason Kruse
(515) 250-3707
[email protected]




LUCAS -- PROJECT # 12-05-59-03                2/16/2012                Small Project Letting
CHARITON FISHERIES RESEARCH STATION
PHONE SYSTEM REPLACEMENT
Proposal Guarantee:
Completion Date: 5/31/2012

   Replace existing phone system. New system is to consist of 3 incoming lines, 11 handsets including one managerial set, incoming fax and outgoing call line, voicemail and extension directory capability. Existing wiring may be utilized, if applicable.

Contact:
Jason Kruse
(515) 250-3707
[email protected]




DELAWARE -- PROJECT # 12-03-28-02                2/23/2012                Small Project Letting
TWIN BRIDGES PARK FISHING AREA
STOCKING ROAD AND BANK REPAIR
Proposal Guarantee:
Completion Date: 5/4/2012

   Projectg consists of replacing stocking road and stabilize reoding strembank along course of road to mitigate further damage & loss. This will need imported unclassified fill material placed into 2 lacations & seeding of the disturbed areas.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




POLK -- PROJECT # 12-02-77-09                2/23/2012                Small Project Letting
BIG CREEK STATE PARK
TRAILS PROGRAM BUILDING DEMOLITION
Proposal Guarantee:
Completion Date: 3/30/2012

   This project includes the demolition and disposal of a 40 foot by 80 foot, single story, fire damaged, pole building at the office complex at Big Creek State Park in Polk County. The building was damaged beyond repair on 12-25-2011. All contents and the entire structure are to be removed from the property including the concrete slab and embedded wood columns.

Contact:
Don Labate
515-250-3714
[email protected]