PROJECTS LETTING -  January , 2013

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

SAC 13-01-81-03 Black Hawk - Shoreline stabilization-2013-01-24   Bid Completion detail
SAC 13-01-81-04 Black Hawk - Shoreline Armoring - Phase 2-2013-02-07   Bid Completion detail
VAN BUREN 13-06-89-01 Lacey Keosauqua State Park - Campground Water and Electrical Improvements-2013-02-07   Bid Completion detail
APPANOOSE 12-05-04-07 Honey Creek Resort - Activity Building Repairs-2013-02-14   Bid Completion detail
HARRISON 13-04-43-01 Missouri River Wildlife Unit - Tyson Bend Access Road-2013-02-21   Bid Completion detail
MAHASKA 12-05-62-01 Lake Keomah - Residence Roof Replacement-2013-02-21   Bid Completion detail
POTTAWATTAMIE 13-04-78-03 Lake Manawa State Park - Shoreline Armoring-2013-02-21   Bid Completion detail
RINGGOLD 13-04-80-02 Mt Ayr Hatchery Storage Addition - Add 28x32 storage addition-2013-02-21   Bid Completion detail
SHELBY 13-04-83-02 Prairie Rose, Lake Manawa, Viking Lake State Park - Vault Latrine-2013-02-21   Bid Completion detail
WASHINGTON 13-06-92-02 Fairport State Recreation Area - Boat Ramp Restroom-2013-02-21   Bid Completion detail
WASHINGTON 13-06-92-01 Geode State Park - Boat Ramp Restroom-2013-02-21   Bid Completion detail
WINNESHIEK 12-03-96-01 Coon Creek WMA - Parking facility stabilization-2013-02-21   Bid Completion detail




POTTAWATTAMIE -- PROJECT # 13-04-78-03                2/21/2013                Large Project Letting
LAKE MANAWA STATE PARK
SHORELINE ARMORING
Proposal Guarantee: $10,000
Completion Date: 5/1/2013

   To install riprap armoring along the eastern shorelines of the western canals of Lake Manawa to protect and reduce erosion of the embankment.

ESTIMATED QUANTITIES:
    Class 'E' Riprap     4,620 Tons
    Seeding, Fertilizing and Mulching     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SHELBY -- PROJECT # 13-04-83-02                2/21/2013                Large Project Letting
PRAIRIE ROSE, LAKE MANAWA, VIKING LAKE STATE PARK
VAULT LATRINE
Proposal Guarantee: $10,000
Completion Date: 8/1/2013

   This project consists of demolition of existing vault latrine buildings, the procurement and installation of a precast concrete vault latrine building, necessary utility work, concrete flatwork, site restoration and incidental items as required by the project documents and the IDNR construction inspector.

ESTIMATED QUANTITIES:
DIV 1 
    DEMOLITION     0.5 L.S.
    CLEARING AND GRUBBING     0.5 L.S.
    SITE WORK     0.6 L.S.
    CXT DOUBLE CASCADIAN VAULT STRUCTURE     1 Each
    CLASS "A" CRUSHED STONE     16 Tons
    SIDEWALK, PCC, 5"     8.5 S.Y.
    DETECTABLE WARNING PANEL     10 S.F.
    EARTHWORK, CLASS 10 EXCAVATION     24.1 C.Y.
    ENGINEERING FABRIC     120.7 S.Y.
    MACADAM     24 Tons
    EROSION CONTROL     177 L.F.
    CONCRETE BOLLARD     1 Each
DIV 2 
    SITE WORK     0.2 L.S.
    CXT SINGLE CASCADIAN RIGHT HAND VAULT STRUCTURE     1 Each
    SIDEWALK, PCC, 5"     32 S.Y.
    PAINTED PAVEMENT MARK, WATERBORNE/SOLVENT     27 STA.
    PAINTED SYMBOLS AND LEGENDS, WATERBORNE OR SOLVENT-BASED      11 Each
    SIGNING     1 Each
    PRECAST CONCRETE PARKING WHEEL STOPS     2 Each
DIV 3 
    DEMOLITION     0.5 L.S.
    CLEARING AND GRUBBING     0.5 L.S.
    SITE WORK     0.2 L.S.
    CXT SINGLE CASCADIAN RIGHT HAND VAULT STRUCTURE     1 Each
    CLASS "A" CRUSHED STONE     2 Tons
    SIDEWALK, PCC, 5"     5.6 S.Y.
    WATER SERVICE, 1" PE     180 L.F.
    YARD HYDRANT     1 Each
    DETECTABLE WARNING PANEL     10 S.F.
    EROSION CONTROL     36 L.F.
    SOLAR TOWER     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WINNESHIEK -- PROJECT # 12-03-96-01                2/21/2013                Large Project Letting
COON CREEK WMA
PARKING FACILITY STABILIZATION
Proposal Guarantee: $5,000
Completion Date: 9/1/2013

   This project consists of streambank restoration consisting of a native timber crib installation to repair a portion of the Upper Iowa River streambank, and incidental work as required by the Plans and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
 
    Mobilization     1 L.S.
    Excavation, Slope Shaping      1 L.S.
    Topsoil, Contractor Furnished     350 C.Y.
    Slope Protection Log Grid     2,180 L.F.
    Engineering Fabric     2,500 S.Y.
    Slope Protection Wood Excelsior Mat     2,500 S.Y.
    Furnish & Install Shrubs, 18" to 24"     875 Each
    Channel Excavation     2,220 C.Y.
    Revetment, Reclaim Riprap     280 C.Y.
    Stabilization Crop Seeding & Fertilizing     1 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SAC -- PROJECT # 13-01-81-03                1/24/2013                Small Project Letting
BLACK HAWK
SHORELINE STABILIZATION
Proposal Guarantee: $0
Completion Date: 3/29/2013

   This project is designed to add erosion protection via fieldstone revetment to the windward side of Cottonwood Point in Black Hawk Lake, Sac County, IA. Work under this contract involves supply and installation of 1,000 TN of fieldstone along approximately 1,110 lineal feet of shoreline.

Contact:
Jeff Felts

[email protected]




SAC -- PROJECT # 13-01-81-04                2/7/2013                Small Project Letting
BLACK HAWK
SHORELINE ARMORING - PHASE 2
Proposal Guarantee: $0
Completion Date: 7/1/2013

   This project consist of adding shoreline armoring via fieldstone revetment to the windward side of Cottonwood Point in Black Hawk Lake, Sac County. Work under this contract involves supply and installation of 1,100 tons of fieldstone along approximately 1,200 lineal feet of shoreline.

Contact:
Jeff Felts

[email protected]




VAN BUREN -- PROJECT # 13-06-89-01                2/7/2013                Small Project Letting
LACEY KEOSAUQUA STATE PARK
CAMPGROUND WATER AND ELECTRICAL IMPROVEMENTS
Proposal Guarantee: $0
Completion Date: 5/11/2013

   CAMPGROUND WATER AND ELECTRICAL UPGRADE. The project consists of boring approximately 954 feet of waterline with associated curb stops, valve boxes, yard hydrants and boring approximately 740 feet of secondary circuit with associated outlet posts and panels. 10 sites.

Contact:
Bruce Flippin

[email protected]




APPANOOSE -- PROJECT # 12-05-04-07                2/14/2013                Small Project Letting
HONEY CREEK RESORT
ACTIVITY BUILDING REPAIRS
Proposal Guarantee: $0
Completion Date: 3/31/2013

   Iowa DNR needs to modify the existing Activities Center. One of the two solar panel inverters is currently inoperable and needs replacement (DNR shall provide replacement inverter). Contractor shall install new inverter and hook all sensoring equipment into inverter and send old inverter back to Schneider Electric. The contractor shall also provide and install two check valves and two mixing valves as indicated on contract documents.

Contact:
Jason Kruse

[email protected]




HARRISON -- PROJECT # 13-04-43-01                2/21/2013                Small Project Letting
MISSOURI RIVER WILDLIFE UNIT
TYSON BEND ACCESS ROAD
Proposal Guarantee: $0
Completion Date: 8/23/2013

   Remove and dispose of the sediment from the river boat ramp parking area and access road into the Misssouri River. Then place new gravel on the access road and seed disturbed areas.

Contact:
Mark Johnson
515-250-3713
[email protected]




MAHASKA -- PROJECT # 12-05-62-01                2/21/2013                Small Project Letting
LAKE KEOMAH
RESIDENCE ROOF REPLACEMENT
Proposal Guarantee: $0
Completion Date: 6/30/2013

   This project consists of replacement of shingles, gutters, downspouts, fascia, soffit, flashing, drip edge, and pipe boots.

Contact:
Jason Kruse

[email protected]




WASHINGTON -- PROJECT # 13-06-92-02                2/21/2013                Small Project Letting
FAIRPORT STATE RECREATION AREA
BOAT RAMP RESTROOM
Proposal Guarantee:
Completion Date: 6/15/2013

   THIS PROJECT CONSISTS OF INSTALLING PRECAST CONCRETE PIT LATRINE, 100 FEET TO NEW P.C.C. SIDEWALK FOR ACCESS TO PRECAST CONCRETE STRUCTURE FROM PARKING LOT. 20'X15' CONCRETE PAD FOR NEW HANDICAP PARKING STALL.

Contact:
Bruce Flippin

[email protected]




WASHINGTON -- PROJECT # 13-06-92-01                2/21/2013                Small Project Letting
GEODE STATE PARK
BOAT RAMP RESTROOM
Proposal Guarantee:
Completion Date: 6/15/2013

   THIS PROJECT CONSISTS OF INSTALLING PRECAST CONCRETE PIT LATRINE , 15 FEET OF NEW P.C.C. SIDEWALK FOR ACCESS TO PRECAST CONCRETE STRUCTURE FROM PARKING LOT, 20'X15' CONCRETE PAD FOR NEW HANDICAP PARKING STALL.

Contact:
Bruce Flippin

[email protected]