PROJECTS LETTING -  January , 2016

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DUBUQUE 09-03-31-10 Mines of Spain - HMA Pavement Joint Repair-2016-01-21   Bid Completion detail
HENRY 16-06-44-02 Geode State Park - Sediment Ponds-2016-01-21   Bid Completion detail
EMMET 15-01-32-02 Snipe Meadow Wetland - Snipe Meadow Water Control Structure Replacement-2016-01-28   Bid Completion detail
APPANOOSE 15-05-04-11 Rathbun Fisheries Management Unit - House Renovations Rebid-2016-02-18   Bid Completion detail
APPANOOSE 15-05-04-11 Rathbun Fisheries Management Unit - House Renovations Rebid-2016-02-18   Bid Completion detail
CLAYTON 13-03-22-01 Manchester Fisheries Management Unit - Upper Maquoketa River Fish Hab-2016-02-18   Bid Completion detail
CLAYTON 16-03-22-01 Pikes Peak State Park - Replace Existing Electrical Panel -2016-02-18   Bid Completion detail
DECATUR 16-05-27-01 Nine Eagles State Park - Group Camp Shelter-2016-02-18   Bid Completion detail
WASHINGTON 15-06-92-06 Lake Darling State Park - Cabin Road Construction-2016-02-18   Bid Completion detail




DUBUQUE -- PROJECT # 09-03-31-10                1/21/2016                Large Project Letting
MINES OF SPAIN
HMA PAVEMENT JOINT REPAIR
Proposal Guarantee: $2,500
Completion Date: 6/12/2016

   THIS PROJECT INVOLVES FULL DEPTH H.M.A PAVEMENT FINISH JOINT PATCHES AND FULL DEPTH H.M.A FINISH PATCHES AT MINES OF SPAIN SRA AND OTHER INCIDENTAL WORK AS REQUIRED BY THE D.N.R CONSTRUCTION INSPECTOR IN DUBUQUE COUNTY, IOWA.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Full depth H.M.A finish joint patches     130 Each
    Full depth H.M.A finish patches     190 S.Y.
    Remove concrete patch     1 L.S.
    Traffic control     1 L.S.
    Sub-base repair     25 S.Y.
    Remove existing 24" Culvert and aprons     1 L.S.
    24" Dia. Concrete culvert and connectors     60 L.F.
    24" Dia. Concrete apron and connectors     2 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HENRY -- PROJECT # 16-06-44-02                1/21/2016                Large Project Letting
GEODE STATE PARK
SEDIMENT PONDS
Proposal Guarantee: $8,000
Completion Date: 9/30/2016

   CONSTRUCTION OF 6 SEDIMENT BASINS , AND OTHER INCIDENTAL WORK AS REQUIRED BY THE IDNR CONSTRUCTION INSPECTOR.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    8" DIA. SMOOTH STEEL PIPE     282 L.F.
    12" DIA. SMOOTH STEEL PIPE     236 L.F.
    42" DIA. SMOOTH STEEL PIPE RISER     13 L.F.
    30" DIA. SMOOTH STEEL PIPE     118 L.F.
    TRASH RACK / BAR GUARD ASMBLY (8")     3 Each
    TRASH RACK / BAR GUARD ASMBLY (12")     2 Each
    TRASH RACK / BAR GUARD ASMBLY (42")     1 Each
    4'x4'X1/4" BASE PLATE     1 Each
    5'X5'x1/4" ANTISEEP     6 Each
    78"X78"X1/4" ANTISEEP     5 Each
    FINE DRAIN FILL     44 Tons
    EARTHWORK/FILL/GRADE     24,345 C.Y.
    CORE TRENCH     3,942 C.Y.
    SEED & MULCH     5 Acres
    CLEARING & GRUBBING     6 Acres
    6" STRIPPING     1,363 C.Y.
    STEEL TUBE FENCE GATE     2 Each
    48" WOVEN WIRE 2 STRAND BARBED WIRE FENCE     1,297 L.F.
    5 STRAND BARBED WIRE FENCE     1,371 L.F.
    CLASS D RIP RAP     60 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 15-05-04-11                2/18/2016                Large Project Letting
RATHBUN FISHERIES MANAGEMENT UNIT
HOUSE RENOVATIONS REBID
Proposal Guarantee: $5,000
Completion Date: 8/26/2016

   The existing roof structure on Rathbun hatchery residences are poorly designed and allow water to infiltrate below the window line on the clearstory area. This project will remove the entire roof and replace with steel roofing, spray foaming the cavity of the roof and installing new clearstory windows. As an alternate, interior wall sheathing will be removed and mold abated, then sheathed with new gypsum board with new lighting. Another alternate will see house #3 demolished.

ESTIMATED QUANTITIES:
    DEMOLITION (ROOFING & INSULATION)     1 L.S.
    SPRAY FOAM ROOF CAVITY (CLOSED CELL)     1 L.S.
    PLYWOOD DECKING     50 Each
    STEEL ROOF AND GUTTER SYSTEM     1 L.S.
    NEW CLEARSTORY WINDOWS     3 Each
    MOBILIZATION     1 L.S.
Alternate
    INTERIOR FINISHING & HOUSE CLEANING     2 Each
Alternate
    COMPLETE INTERIOR MOLD DISINFECTION     2 Each
Alternate
    HOME ITEM MOVING AND STORAGE     2 Each
Alternate
    DEMOLITION (ROOFING & INSULATION)     1 L.S.
Alternate
    SPRAY FOAM ROOF CAVITY (CLOSED CELL)     1 L.S.
Alternate
    STEEL ROOF AND GUTTER SYSTEM     1 L.S.
Alternate
    SEAL CLEARSTORY WINDOWS AND ROOF VENT     2 Each
Alternate
    DEMOLISH HOUSE #3, FILL AND COMPACT HOLE     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WASHINGTON -- PROJECT # 15-06-92-06                2/18/2016                Large Project Letting
LAKE DARLING STATE PARK
CABIN ROAD CONSTRUCTION
Proposal Guarantee: $30,000
Completion Date: 9/30/2016

   The project includes saw cutting and removing part of the existing asphalt park road and the construction of a new PCC roadway pavement for a distance of roughly 1,000 lineal feet with parking areas, PCC sidewalks, a boat ramp PCC pavement parking area, and a PCC recreational trail, requiring clearing and grubbing, rough and finish grading, storm sewer construction, PCC paving, a pit latrine, and seeding/fertilizing/mulching all disturbed areas located at Lake Darling State Park in Washington County, Iowa.

ESTIMATED QUANTITIES:
    Clearing and Grubbing-Cabin Access Road & West Spur     1 L.S.
    Clearing and Grubbing-Non Road Areas     1 L.S.
    Full Depth Saw Cut     46 L.F.
    HMA Pavement Removal     1,214 S.Y.
    PCC Pavement Removal     48 S.Y.
    Demolition-2 Existing Culverts & Pit Latrine     1 L.S.
    Grading-Cabin Access Road & West Spur     1 L.S.
    Grading-Non Road Areas     1 L.S.
    8-inch Filter Sock     88 L.F.
    ScourStop Outlet Protection     48 S.F.
    Special Backfill-Roadways     1,027 Tons
    7-inch Non-Reinforced PCC     6,237 S.Y.
    6-inch Non-Reinforced PCC     669.2 S.Y.
    5-inch Reinforced PCC Sidewalk     425 S.Y.
    5-inch Non-Reinforced PCC Trail     48 S.Y.
    5-inch Reinforced PCC Trail     1,675.9 S.Y.
    6-inch Standard Curb     764 L.F.
    Granular Subbase-Non Road Pavement Areas     942.1 Tons
    4-inch PVC SDR 35 Pipe     60 L.F.
    12-inch RCP Class III     148 L.F.
    12-inch RCP Class III FES W/Footing & Apron Guards     5 Each
    15-inch RCP Class III     185 L.F.
    15-inch RCP Class III FES W/Footing & Apron Guards     1 Each
    SW-501 Single Grate Intake W/SW-603 Type 'R' Casting     2 Each
    SW-503 Single Intake W/MH W/SW-602 Type "E' & SW-603 Type 'R' Castings     1 Each
    Paint Striping-Cabin & Sw Parking, HC Markings, & 2 Truncated Domes     1 L.S.
    Precast Concrete Parking Wheel Stops     18 Each
    Signage-HC Signs for Parking Spaces, Road Closure, & 2 Trail Stop Signs     1 L.S.
    Utility Adjustments-Cabin Area     1 L.S.
    Oil & Sand Separator-Boat Ramp Parking Area     1 Each
    Trench Drain-Boat Ramp Parking Area     19 L.F.
    Paint Striping of Boat Ramp Parking Area Spaces     675 L.F.
    Handicap Parking Space Pavement Marking-Boat Ramp Parking Location     1 Each
    Handicap Parking Cross Hatching-Boat Ramp Parking Location     1 Each
    Stop Sign @ Boat Ramp Parking Area Exit     1 Each
    Single Pit Latrine, Boat Ramp Parking Area     1 Each
    NPDES General Permit #2 & SWPPP     1 L.S.
    Finish Grading-Access Road & West Spur     1 L.S.
    Finish Grading-Non Road Areas     1 L.S.
    Seeding, Fertilizing and Mulching-Access Road & West Spur     1 L.S.
    Seeding, Fertilizing and Mulching-Non Road Areas     1 L.S.
    Construction Staking-Access Road & West Spur     1 L.S.
    Construction Staking-Non Road Areas     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




EMMET -- PROJECT # 15-01-32-02                1/28/2016                Small Project Letting
SNIPE MEADOW WETLAND
SNIPE MEADOW WATER CONTROL STRUCTURE REPLACEMENT
Proposal Guarantee: $0
Completion Date: 8/31/2016

   The Snipe Meadow Wetland Water Control Structure Replacement project is designed to replace an existing tube style water control structure with a new sheet pile weir on the Snipe Meadow Wetland in Emmet County, Iowa. Work under this project includes removal of the old water control structure, dike reshaping, channel excavation, 1006 SF of sheet pile installation, and Class E Revetment placement.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




CLAYTON -- PROJECT # 13-03-22-01                2/18/2016                Small Project Letting
MANCHESTER FISHERIES MANAGEMENT UNIT
UPPER MAQUOKETA RIVER FISH HAB
Proposal Guarantee: $0
Completion Date: 6/30/2016

   Project consists of improving fish habitat by installing 3 rock vortex weirs, 15 bank hides, and bank shaping on Upper Maquoketa River near Strawberry Point, Clayton Co., Iowa. Project will require 243 ton Class 'D' riprap, 108 ton large stone (1.25+ ton each), 149 ton extra-large stone (1.25+ ton each). DNR will furnish the bank hides. Proposal & plans may be obtained by emailing name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




CLAYTON -- PROJECT # 16-03-22-01                2/18/2016                Small Project Letting
PIKES PEAK STATE PARK
REPLACE EXISTING ELECTRICAL PANEL
Proposal Guarantee: $0
Completion Date: 4/15/2016

   Project consists of removing & replacing existing distribution panel, reconnecting campground conductors, and providing new copper conductors from primary service to new distribution panel at Pikes Peak State Park campground near McGregor in Clayton County, Iowa. Email name, address, and phone number to obtain proposal & plan.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




DECATUR -- PROJECT # 16-05-27-01                2/18/2016                Small Project Letting
NINE EAGLES STATE PARK
GROUP CAMP SHELTER
Proposal Guarantee: $0
Completion Date: 5/15/2016

   This project consists of constructing a picnic shelter complete with reinforced concrete pad and crushed stone path.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov