The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual. Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms, Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.
Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis.
To subscribe to this list, click here.
The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.
To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website.
You may obtain a free download from
Click on the project names below to view the one(s) which interest you.
This project consists of rehabiliation of 6" and 8" gravity sewer mains, existing lift station improvements, a new sanitary sewer lift station, 840 LF of new forcemain, and other appurtenances. The sewer line will be rehabilitated by cast in place lining of the pipe (CIPP) and chemical grouting of pipe joints. The manholes will be repaired by grouting, installation of new castings, centrigually cast cementitious mortar lining (CCCM), or total replacement.
ESTIMATED QUANTITIES:
CIPP Line Sewer Pipe, 6" Dia.
1,925 L.F.
CIPP Line Sewer Pipe, 8" Dia.
330 L.F.
Chemical Grout Sewer, VCP Pipe Joints, 8" Dia.
1,200 L.F.
Post-Improvement Televising
3,455 L.F.
Interior Manhole Chimney Seals
1 Each
Manhole CCCM Interior Lining with Epoxy Seal
73 L.F.
New Casting for CCCM Lined Manholes
12 Each
Manhole Grout/Repair of Inlet/Outlet Piping
4 Each
New Precast 4' Dia. Manhole
1 Each
New Lift Station Rehabilitation - South System
1 L.S.
New Packaged Lift Station - North System
1 L.S.
Reconnect Existing Sewer/Abandon Existing Manhole
1 L.S.
2" HDPE Force Main
820 L.F.
Drawings and Specs are not available in electronic format for this project
This project consists of rehabilitating the existing wastewater collection system at Lacey-Keosauqua State Park. The scope of the project includes in-site lining of the sewer collection pipe, digging and point repairing the pipe at several places where pipe has collapsed and cannot be lined and rehabilitation of the manholes by either grouting, readjusting the frames or in some cases replacing the manholes.
This project includes debris and silt removal from the canyon road and surrounding areas and structural repair to bridge railing, foundations and stream bank protection at Ledges SP in Boone County.
This project consists of the repairs of an addition to an existing rock chute, the installation of an inlet drop structure, and all other things described in the drawings and specifications.
HONEY CREEK RESORT - DESJARDINS RENEWABLE ENERGY PROJECT
MILLWORK KIOSK
Proposal Guarantee:
Completion Date: 3/31/2012
This new wood kiosk will house the touch-screen system from Siemens building controls. This will be the face of the Desjardins Renewable Project. Millwork kiosk to match the mill and wood work of the lodge. To be placed in the hallway/corridor along the conference rooms.
This project is designed to recondition and improve the existing fish trap structure where Hales Slough meets Big Spirit Lake. Work under this contract involves repair of existing deteriorated concrete structural components, fabrication of new aluminum fish grates, and removal and replacement of a chain-link perimeter fence.
This project is designed to re-create a water supply channel through the Snyder Bend WMA. The existing wetland area and associated channel were completely filled with sand and sediment from the Missouri River Flooding in 2011. The proposed channel is 3,600 feet long with a 10' wide bottom and 4:1 side slopes.
Project consists of repairing two columns,repair concrete above doorway, repair concrete wall corners at 3 locations, investigate a wet floor condition & repair, reinforce pipe pentration through steel beam, and replace & stain out side deck and stairway
THIS PROJECT CONSISTS OF THE CONSTRUCTION OF AN INTERPRETIVE KIOSK, THE SITEWORK ASSOCIATED WITH THE KIOSK, THE REMOVAL OF 16 S.F. OF PAVEMENT., AND ALL OTHER ITEMS DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS AND AS SPECIFIED BY THE DNR CONSTRUCTION.
The intent of this project is to fully replace the septic system currently serving a residence and park lodge in Stone State Park. Work includes but is not limited to abandonment of the old system sewer system, installation of a new leech field and septic tank, installation of new 4 and 6 inch piping, and all associated connections. Pipe installation is a combination of open cut and bored sections.
Project consists of placing gabion baskets filled with erosion stone to construct a vertical wall with a shotcrete facing along a dryrun creek, removing debris ,replacing CMP culvert and placing granualar surfacing on parking lot
This project is designed to add and expand upon work completed last year on a variety of structures and marsh excavations around Lost Island Lake in Palo Alto County, Iowa. Work under this project includes channel excavation, aluminum & Steel water control structure component fabrication, and granular surfacing for access.