Stony Creek IA 06-LSR-1644
mo to trib S27T98NR38W Dickinson Co.
- Cycle
- 2022
- Release Status
- Final
- Overall IR
- 5 - Water is impaired or threatened and a TMDL is needed.
- Trend
- Unknown
- Created
- 12/30/2021 2:35:07 PM
- Updated
- 1/7/2022 12:09:01 PM
The Class BWW2 use was assessed as “not supported” based on biological sampling data and due to a fish kill investigation. All other designated uses were "not assessed."
Data
Sources: Data Source Data Source ID Data Type Data Age Site ID Site Name Site Description Iowa DNR 6 BIO See Below 480 Stony Creek Everly – REMAP #148 Benthic
Macroinvertebrates: BioNet Site ID Date Drainage Area (mi2) Ecoregion Major Drainage/ Thermal BM Sample Gear BMIBI score BMIBI Class 47a BMIBI BIT BMIBI Pass/Fail 480 8/30/05 59 47a MO/WW Art Sub 28 Poor 54 Fail BioNet Site ID Date Drainage Area (mi2) Ecoregion Major Drainage/ Thermal Riffle Stream? FIBI score FIBI Class 47a FIBI BIT FIBI Pass/Fail 480 8/30/05 59 47a MO/WW NA 34 Fair 43 Fail Community Assessment Type Assessment Result Support Level IR
Category Reason Benthic Macroinvertebrates Evaluated Fail (0/1) Not Fish Evaluated Fail (0/1) Not Overall Evaluated Fail Not 5bt Assessment was evaluated because it was
based on a single sample. Class BWW2 - Fish kill Assessment: The Class BWW2 use previously resided in Category 4d based on the assessment
developed for the 2015 fish kill. Because no additional fish kills were
reported in this segment for at least five years post fish kill (2020), the
Category for the fish kill assessment was changed from 4d to 3b (potentially
impaired). DNR believes that any impact from the fish kill from which the
impairment was based has likely dissipated. If no additional fish kills are reported
in the segment for an additional five-year period (2025), the Category will be
changed from 3b to 3a (not assessed).
Presumptive Class A1 - No Data
Class BWW2 - Biological Sampling:
Fish:
Overall:
Details about the 2015 fish kill can be found here: https://programs.iowadnr.gov/fishkill/Events/889