Project #: W2017-0251
DWSRF Number: FS-94-18-DWSRF-011
Project Description: 2017 Water System Improvements (RO pilot protocol, PER), Well #22, RO procurement, WTP, raw water main, sewer force main
DNR Project Manager: Skipp Slattenow, PE, CGP
email: [email protected]
Phone: (515) 725-0461
Consultant: imeg
Submitted Without Engineer: No

Construction Permit/Approvals
Categories Received Reviewed Finalized Final Action Permit Number Download
Report 3/8/2017 3/16/2017 3/27/2017 Approved
Description : 3-month pilot study involving reverse osmosis (RO) treatment of raw and filtered water to reduce radium contamination and other dissolved contaminants, including hardness and chloride. NOTES re: 1) WTP NPDES permit coverage, 2) NSF 60 certification, 3) gross alpha analysis, 4) arsenic & ...
Report 6/2/2017 3/8/2018 3/20/2018 Approved
Description : PER, Add #1, RO Pilot Study reports. Conditions re: 1) installed membranes & 2) emergency power. Notes re: 1) post-aeration detention time, 2) 20-hr design operating period, and 3) distribution system pressure.
Site survey well 10/20/2017 11/20/2017 3/20/2018 Approved
Description : Well #22 NOTES re: 1) neighboring sewers, 2) legal control, 3) well house floor drains, 4) surface drainage, 5) chemical application, 6) separation distances, 7) GP6, 8) flood plain development permits, and 9) source water protection and emergency response plans.
Other 11/14/2017 3/9/2018 3/20/2018 Permitted 2018-0222W
Description : procurement of reverse osmosis membrane filtration equipment (6 skids, each with a permeate capacity of 1390 gallons per minute and including Hydranautics ESPA2-LD membrane elements) and associated appurtenances, in accordance with the approved Procurement of Reverse Osmosis System specifi...
Well 2/20/2018 4/19/2018 11/19/2018 Permitted 2019-0057W Download
Description : one new water supply well (Well #22 – proposed total depth of 516 feet below the existing ground surface [bgs], 30-inch diameter steel surface casing installed to a depth of 30 feet bgs, 24-inch diameter steel production casing installed to a depth of 278 feet bgs, and pitless unit; at the...
Variance 2/20/2018 4/6/2018 4/18/2018 Approved
Description : variance from the requirements of IAC 567—43.3(7) Table A, with approval for sanitary sewers of original (i.e., likely non-IAC compliant) construction within 25-75 ft and storm sewers of original (i.e., likely non-IAC compliant) construction within 75-200 ft of proposed Well #22 based on: ...
Chemical addition, Treatment, Water main, Pump Station 9/18/2018 2/1/2019 4/25/2019 Permitted 2019-0288W Download
Description : WTP expansion, incl one RO membrane treatment system (6 skids, each w/ 1390 gpm permeate capacity & Hydranautics ESPA2-LD elements); chemical metering equipment for addn of liquid – NaOCl, NaHSO3, H2SO4, antiscalant, NaOH, NaOCl & ammonium sulfate, and blended ortho/poly PO4; Well #22 well...
Variance 3/21/2019 4/10/2019 4/24/2019 Approved
Description : variance from the requirements of IAC 567—43.3(7) Table A, with approval for emergency generator fuel storage and oil filled transformer within 100 ft of existing Wells #21 & #22 based on: 1) well construction and geology, 2) generator construction, including sufficient secondary containm...
Water main, Other 10/29/2019 6/19/2020 7/1/2020 Permitted 2020-0461W Download
Description : 1800 feet of 12-inch diameter polyvinyl chloride (PVC) or high-density polyethylene (HDPE) sewer force main to convey – under low pressure – reverse osmosis membrane concentrate and filter backwash wastewater from the water treatment plant to the Riverside Lift Station, 290 feet of 16-inch...

SRF
DWSRF Project NumberIUP Approved DateIUP Request AmountLoan Signed DateLoan Amount
FS-94-18-DWSRF-011 $25,286,000.0006/28/2019$25,286,000.00

Contracts
DWSRF Project NumberContractor NameDNR Award Concur Date
FS-94-18-DWSRF-011 Cahoy Pump Service 
FS-94-18-DWSRF-011 Woodruff Construction LLC 
FS-94-18-DWSRF-011 fake contractor05/06/2019
FS-94-18-DWSRF-011 Woodruff Construction LLC07/18/2019
FS-94-18-DWSRF-011 On Track Construction, LLC10/28/2020
FS-94-18-DWSRF-011 Harn R/O Systems 05/23/2018
FS-94-18-DWSRF-011 Cahoy Pump Services, Inc.07/18/2019

Environmental Reviews
ER Started DateER SpecialistCategorical ExclusionArmy Corps Permit NeededFlood Plain Permit NeededFNSI/CX Issued for Comment DateFNSI/CX Cleared Comment Period Date
08/24/2018 No No Yes 03/07/201904/06/2019
03/09/2020 No No No 04/17/202005/17/2020
04/02/2018 No No No 09/06/201810/06/2018