IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Lake Darling, Washington County  Date: 10/21/2010  Project No.  
  Geotech-Dam/Spillway Evaluation  County:   WASHINGTON  Time: 11:05  07-06-92-03

 

 
1
2
3
Estimated Cost: $1,700,000.00
Contractor: 
CJ Moyna & Sons IncPETERSON CONTRACTORS INC (PCI-REINBECK)DeLong Construction Inc
Funding Source: 100% Lake Restoration, 24412 Hwy 13
104 Blackhawk St
Box A
1320 N 8th Ave
PO Box 488
Elkader IA  52043Reinbeck IA  50669Washington IA  52353
Plan Sets Requested: 14
Quantities
563-245-1442319-345-2713319-653-3334
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1SITE PREPARATION1L.S.$15,000.00$15,000.00 $42,905.00$42,905.00 $10,000.00$10,000.00 
2EXPLORATORY EXCAVATION12HR.$425.00$5,100.00 $780.00$9,360.00 $200.00$2,400.00 
3STRIPPING, SALVAGING AND SPREADING TOPSOIL7800C.Y.$3.00$23,400.00 $5.30$41,340.00 $3.50$27,300.00 
4EXCAVATION AND REPLACEMENT OF UNSUITABLE MATERIAL500C.Y.$10.00$5,000.00 $12.50$6,250.00 $8.00$4,000.00 
5EXCAVATION, COMMON55606C.Y.$1.50$83,409.00 $3.15$175,158.90 $2.68$149,024.08 
6ROCK EXCAVATION6422C.Y.$9.00$57,798.00 $16.20$104,036.40 $13.40$86,054.80 
7REMOVAL OF EXISTING STRUCTURES1L.S.$45,000.00$45,000.00 $79,985.00$79,985.00 $147,500.00$147,500.00 
8SPECIAL BACKFILL200Tons$17.00$3,400.00 $20.50$4,100.00 $17.00$3,400.00 
9TRENCH DRAIN AND OUTLET900C.Y.$52.00$46,800.00 $50.00$45,000.00 $46.00$41,400.00 
1048" DIAMETER MANHOLE1Each$6,500.00$6,500.00 $3,500.00$3,500.00 $2,500.00$2,500.00 
11DRAINAGE DIAPHRAGM AND OUTLET245C.Y.$55.00$13,475.00 $52.00$12,740.00 $38.15$9,346.75 
12EMBANKMENT147618C.Y.$2.31$340,997.58 $3.55$524,043.90 $2.57$379,378.26 
1372" REINFORCED CONCRETE PRESSURE PIPE160L.F.$1,400.00$224,000.00 $1,100.00$176,000.00 $1,480.00$236,800.00 
14STANDARD BAFFLE RISER1L.S.$285,000.00$285,000.00 $32,480.00$32,480.00 $275,800.00$275,800.00 
15STANDARD IMPACT BASIN1L.S.$152,000.00$152,000.00 $129,000.00$129,000.00 $140,000.00$140,000.00 
16RIPRAP3500Tons$29.00$101,500.00 $27.75$97,125.00 $24.00$84,000.00 
17DRAINAGE TILE INLET STRUCTURE4Each$600.00$2,400.00 $1,800.00$7,200.00 $1,400.00$5,600.00 
18TOE DRAINS350L.F.$24.50$8,575.00 $46.00$16,100.00 $41.75$14,612.50 
1912" DRAINAGE TILE PIPE500L.F.$12.00$6,000.00 $103.00$51,500.00 $10.00$5,000.00 
2012" HDPE CULVERT35L.F.$20.00$700.00 $25.00$875.00 $40.00$1,400.00 
2118" HDPE CULVERT45L.F.$26.00$1,170.00 $31.00$1,395.00 $50.00$2,250.00 
2212" RCP APRON2Each$700.00$1,400.00 $760.00$1,520.00 $705.00$1,410.00 
2318" RCP APRON2Each$825.00$1,650.00 $875.00$1,750.00 $825.00$1,650.00 
24PIEZOMETERS3Each$600.00$1,800.00 $1,000.00$3,000.00 $600.00$1,800.00 
25SILT FENCE2500L.F.$1.75$4,375.00 $1.90$4,750.00 $1.80$4,500.00 
26FILTER SOCK1000L.F.$3.50$3,500.00 $1.90$1,900.00 $2.75$2,750.00 
27FERTILIZING AND SEEDING, TEMPORARY3Acres$1,850.00$5,550.00 $180.00$540.00 $300.00$900.00 
28FERTILIZING AND SEEDING, PERMANENT4.7Acres$3,000.00$14,100.00 $749.00$3,520.30 $500.00$2,350.00 
29MULCHING7.7Acres$800.00$6,160.00 $440.00$3,388.00 $500.00$3,850.00 
30TYPE 1 TURF REINFORCEMENT40700S.F.$1.50$61,050.00 $0.47$19,129.00 $0.46$18,722.00 
31WOOD EXCELSIOR MAT19500S.F.$2.00$39,000.00 $0.14$2,730.00 $0.14$2,730.00 
32CONSTRUCTION STAKING1L.S.$15,000.00$15,000.00 $10,000.00$10,000.00 $10,000.00$10,000.00 
33SOIL TESTING1L.S.$20,000.00$20,000.00 $20,300.00$20,300.00 $25,000.00$25,000.00 
34MOBILIZATION1L.S.$100,000.00$100,000.00 $99,500.00$99,500.00 $80,000.00$80,000.00 
      $1,700,809.58  $1,732,121.50  $1,783,428.39 
 
4
5
6
Estimated Cost: $1,700,000.00
Contractor: 
JB Holland Construction CERES Environmental Services
Funding Source: 100% Lake Restoration, 2092 HWY 9 West
3825 85th Ave N

Decorah IA  52101Brooklyn Park MN  55443  
Plan Sets Requested: 14
Quantities
563-382-2901763-425-8822
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1SITE PREPARATION1L.S.$30,000.00$30,000.00 $65,834.69$65,834.69 $0.00 
2EXPLORATORY EXCAVATION12HR.$515.00$6,180.00 $226.10$2,713.20 $0.00 
3STRIPPING, SALVAGING AND SPREADING TOPSOIL7800C.Y.$3.22$25,116.00 $4.58$35,724.00 $0.00 
4EXCAVATION AND REPLACEMENT OF UNSUITABLE MATERIAL500C.Y.$10.00$5,000.00 $8.03$4,015.00 $0.00 
5EXCAVATION, COMMON55606C.Y.$2.46$136,790.76 $3.12$173,490.72 $0.00 
6ROCK EXCAVATION6422C.Y.$11.20$71,926.40 $23.98$153,999.56 $0.00 
7REMOVAL OF EXISTING STRUCTURES1L.S.$48,000.00$48,000.00 $109,667.16$109,667.16 $0.00 
8SPECIAL BACKFILL200Tons$15.75$3,150.00 $33.06$6,612.00 $0.00 
9TRENCH DRAIN AND OUTLET900C.Y.$73.50$66,150.00 $42.90$38,610.00 $0.00 
1048" DIAMETER MANHOLE1Each$2,400.00$2,400.00 $2,141.47$2,141.47 $0.00 
11DRAINAGE DIAPHRAGM AND OUTLET245C.Y.$38.34$9,393.30 $35.24$8,633.80 $0.00 
12EMBANKMENT147618C.Y.$3.05$450,234.90 $4.41$650,995.38 $0.00 
1372" REINFORCED CONCRETE PRESSURE PIPE160L.F.$1,757.10$281,136.00 $930.27$148,843.20 $0.00 
14STANDARD BAFFLE RISER1L.S.$274,077.19$274,077.19 $283,404.77$283,404.77 $0.00 
15STANDARD IMPACT BASIN1L.S.$168,908.06$168,908.06 $179,499.43$179,499.43 $0.00 
16RIPRAP3500Tons$24.50$85,750.00 $30.80$107,800.00 $0.00 
17DRAINAGE TILE INLET STRUCTURE4Each$1,075.00$4,300.00 $871.94$3,487.76 $0.00 
18TOE DRAINS350L.F.$25.25$8,837.50 $18.31$6,408.50 $0.00 
1912" DRAINAGE TILE PIPE500L.F.$17.75$8,875.00 $17.40$8,700.00 $0.00 
2012" HDPE CULVERT35L.F.$23.75$831.25 $27.49$962.15 $0.00 
2118" HDPE CULVERT45L.F.$24.00$1,080.00 $31.46$1,415.70 $0.00 
2212" RCP APRON2Each$330.00$660.00 $999.06$1,998.12 $0.00 
2318" RCP APRON2Each$440.00$880.00 $1,401.23$2,802.46 $0.00 
24PIEZOMETERS3Each$560.00$1,680.00 $2,872.62$8,617.86 $0.00 
25SILT FENCE2500L.F.$1.91$4,775.00 $2.18$5,450.00 $0.00 
26FILTER SOCK1000L.F.$1.91$1,910.00 $2.18$2,180.00 $0.00 
27FERTILIZING AND SEEDING, TEMPORARY3Acres$182.00$546.00 $206.83$620.49 $0.00 
28FERTILIZING AND SEEDING, PERMANENT4.7Acres$755.00$3,548.50 $860.64$4,045.008 $0.00 
29MULCHING7.7Acres$445.00$3,426.50 $505.58$3,892.966 $0.00 
30TYPE 1 TURF REINFORCEMENT40700S.F.$0.47$19,129.00 $0.54$21,978.00 $0.00 
31WOOD EXCELSIOR MAT19500S.F.$0.14$2,730.00 $0.16$3,120.00 $0.00 
32CONSTRUCTION STAKING1L.S.$7,000.00$7,000.00 $17,235.71$17,235.71 $0.00 
33SOIL TESTING1L.S.$7,500.00$7,500.00 $14,363.10$14,363.10 $0.00 
34MOBILIZATION1L.S.$95,000.00$95,000.00 $404,894.49$404,894.49 $0.00 
      $1,836,921.36  $2,484,156.694  $0.00 
 



 

10/13/2026