IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Volga River State Rec. Area  Date: 2/24/2011  Project No.  
  Resurfacing of paved roads - Site 2  County:   FAYETTE  Time: 11:00 a.m.  06-03-33-04

 

 
1
2
3
Estimated Cost: $2,023,987.00
Contractor: 
Concrete Foundations IncWicks Construction CoK Cunningham Construction Co Inc
Funding Source: 100% Park & Institutional Road Fund, 2010 Kenwood Ave
2201 State Hwy 9
PO Box 428
1025 Center Street
New Hampton IA  50659Decorah IA  52101Cedar Falls IA  50613
Plan Sets Requested: 19
Quantities
641-394-6789563-382-2325319-277-3001
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$25,000.00$25,000.00 $30,000.00$30,000.00 $19,675.00$19,675.00 
2Modified Subbase5688C.Y.$21.00$119,448.00 $23.00$130,824.00 $17.50$99,540.00 
3Excavation, Class 13, Waste5522C.Y.$3.10$17,118.20 $3.10$17,118.20 $3.50$19,327.00 
4Std/Slip Form PCC Pavement, Class C, Class 3 Dur. 7"30237S.Y.$19.85$600,204.45 $19.68$595,064.16 $22.40$677,308.80 
5PCC Pavement Samples1L.S.$500.00$500.00 $300.00$300.00 $5,000.00$5,000.00 
6Granular Shoulders, Type A3871Tons$8.75$33,871.25 $8.75$33,871.25 $11.80$45,677.80 
7Shoulder Construction, Earth66.4STA.$150.00$9,960.00 $150.00$9,960.00 $160.00$10,624.00 
8Culvert, 3000D Concrete Roadway Pipe, 24"32L.F.$37.17$1,189.44 $37.17$1,189.44 $34.00$1,088.00 
9Aprons, Concrete, 24"2Each$700.00$1,400.00 $700.00$1,400.00 $765.00$1,530.00 
10Subdrain, Longitudinal, (Shoulder) 4"14900L.F.$3.10$46,190.00 $3.10$46,190.00 $4.00$59,600.00 
11Excavation, Class 10, Roadway and Borrow4321C.Y.$3.10$13,395.10 $3.10$13,395.10 $5.00$21,605.00 
12Excavation, Class 10, Waste2816C.Y.$3.10$8,729.60 $3.10$8,729.60 $3.50$9,856.00 
13Bridge Approach Pavement, RK-18195.54S.Y.$87.00$17,011.98 $51.50$10,070.31 $70.00$13,687.80 
14Culvert, Concrete Roadway Pipe, 36"72L.F.$81.11$5,839.92 $81.11$5,839.92 $92.00$6,624.00 
15Aprons, Concrete, 36" Dia.6Each$1,100.00$6,600.00 $1,100.00$6,600.00 $1,390.00$8,340.00 
16Removal of Existing Bridge1L.S.$950.00$950.00 $950.00$950.00 $1,500.00$1,500.00 
17Removal of Pavement23814S.Y.$1.50$35,721.00 $1.50$35,721.00 $1.55$36,911.70 
18Traffic Control1L.S.$2,700.00$2,700.00 $2,700.00$2,700.00 $2,700.00$2,700.00 
19Subdrain Outlet, RF-19E62Each$144.00$8,928.00 $144.00$8,928.00 $100.00$6,200.00 
20Construction Survey1L.S.$11,000.00$11,000.00 $8,000.00$8,000.00 $14,000.00$14,000.00 
21Macadam Stone Base1411Tons$9.90$13,968.90 $9.90$13,968.90 $10.00$14,110.00 
22Surfacing, Driveway, Class A Crushed Stone583Tons$10.90$6,354.70 $10.90$6,354.70 $11.80$6,879.40 
23Engineering Fabric5787S.Y.$2.14$12,384.18 $2.14$12,384.18 $2.00$11,574.00 
      $998,464.72  $999,558.76  $1,093,358.50 
 
4
5
6
Estimated Cost: $2,023,987.00
Contractor: 
Allied Manatts Group LLCCedar Valley CorpHorsfield Construction Inc
Funding Source: 100% Park & Institutional Road Fund, PO Box 687
2637 Wagner Rd
505 E Main St
Box 305
Charles City IA  50616Waterloo IA  50703Epworth IA  52045
Plan Sets Requested: 19
Quantities
641-228-4256319-235-9537563-876-3335
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$60,010.00$60,010.00 $85,700.00$85,700.00 $55,960.00$55,960.00 
2Modified Subbase5688C.Y.$11.50$65,412.00 $5.50$31,284.00 $5.50$31,284.00 
3Excavation, Class 13, Waste5522C.Y.$4.00$22,088.00 $4.00$22,088.00 $4.00$22,088.00 
4Std/Slip Form PCC Pavement, Class C, Class 3 Dur. 7"30237S.Y.$23.25$703,010.25 $23.01$695,753.37 $23.40$707,545.80 
5PCC Pavement Samples1L.S.$1,500.00$1,500.00 $1,200.00$1,200.00 $12,000.00$12,000.00 
6Granular Shoulders, Type A3871Tons$11.80$45,677.80 $13.30$51,484.30 $13.30$51,484.30 
7Shoulder Construction, Earth66.4STA.$175.00$11,620.00 $200.00$13,280.00 $200.00$13,280.00 
8Culvert, 3000D Concrete Roadway Pipe, 24"32L.F.$49.00$1,568.00 $60.00$1,920.00 $60.00$1,920.00 
9Aprons, Concrete, 24"2Each$450.00$900.00 $600.00$1,200.00 $600.00$1,200.00 
10Subdrain, Longitudinal, (Shoulder) 4"14900L.F.$3.66$54,534.00 $3.66$54,534.00 $3.75$55,875.00 
11Excavation, Class 10, Roadway and Borrow4321C.Y.$5.00$21,605.00 $4.00$17,284.00 $4.00$17,284.00 
12Excavation, Class 10, Waste2816C.Y.$5.00$14,080.00 $4.00$11,264.00 $4.00$11,264.00 
13Bridge Approach Pavement, RK-18195.54S.Y.$65.00$12,710.10 $106.00$20,727.24 $104.00$20,336.16 
14Culvert, Concrete Roadway Pipe, 36"72L.F.$78.00$5,616.00 $58.00$4,176.00 $58.00$4,176.00 
15Aprons, Concrete, 36" Dia.6Each$850.00$5,100.00 $700.00$4,200.00 $700.00$4,200.00 
16Removal of Existing Bridge1L.S.$1,000.00$1,000.00 $2,000.00$2,000.00 $2,000.00$2,000.00 
17Removal of Pavement23814S.Y.$2.00$47,628.00 $4.05$96,446.70 $4.00$95,256.00 
18Traffic Control1L.S.$3,500.00$3,500.00 $3,000.00$3,000.00 $3,000.00$3,000.00 
19Subdrain Outlet, RF-19E62Each$175.00$10,850.00 $175.00$10,850.00 $200.00$12,400.00 
20Construction Survey1L.S.$9,500.00$9,500.00 $10,000.00$10,000.00 $20,000.00$20,000.00 
21Macadam Stone Base1411Tons$13.50$19,048.50 $13.50$19,048.50 $13.50$19,048.50 
22Surfacing, Driveway, Class A Crushed Stone583Tons$13.50$7,870.50 $13.50$7,870.50 $13.30$7,753.90 
23Engineering Fabric5787S.Y.$2.50$14,467.50 $2.00$11,574.00 $2.00$11,574.00 
      $1,139,295.65  $1,176,884.61  $1,180,929.66 
 



 

10/13/2026