IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Diamond Lake  Date: 7/23/2026  Project No.  
  Drawdown & Structure Installation  County:   POWESHIEK  Time: 11:00 a.m.  27-05-79-01

 

 
1
2
3
Estimated Cost: $810,000.00
Contractor: 
RW Excavating Solutions LCAaron Crane Construction LLCDeLong Construction, Inc
Funding Source: 100% Lake Restoration, 13293 S 88th Ave W
1833 120th Ave
PO Box 488
Prairie City IA  50228Manchester IA  52057Washington IA  52353
Plan Sets Requested: 5
Quantities
515-994-2648563-920-1250319-653-3334
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION & DEMOBILIZATION1L.S.$80,000.00$80,000.00 $50,000.00$50,000.00 $33,000.00$33,000.00 
2SITE PREPARATION & CLEARING1L.S.$15,000.00$15,000.00 $18,000.00$18,000.00 $6,000.00$6,000.00 
3ACCESS CONTROL1L.S.$5,000.00$5,000.00 $14,000.00$14,000.00 $1,500.00$1,500.00 
4TOPSOIL STRIP, STOCKPILE, AND RESPREAD3641C.Y.$8.00$29,128.00 $5.00$18,205.00 $11.50$41,871.50 
5REMOVE, SALVAGE, AND REPLACE EXISTING RIP RAP1L.S.$10,000.00$10,000.00 $9,000.00$9,000.00 $9,000.00$9,000.00 
6CLASS 'E' RIP RAP120Tons$80.00$9,600.00 $70.00$8,400.00 $93.00$11,160.00 
7CLASS 'B' RIP RAP451Tons$85.00$38,335.00 $70.00$31,570.00 $82.00$36,982.00 
8MACADAM STONE149Tons$50.00$7,450.00 $65.00$9,685.00 $65.00$9,685.00 
92" CLEAN STONE55Tons$50.00$2,750.00 $65.00$3,575.00 $52.00$2,860.00 
10EROSION STONE100Tons$50.00$5,000.00 $67.00$6,700.00 $55.00$5,500.00 
11EXCAVATION, LOW WATER CROSSING227C.Y.$15.00$3,405.00 $10.00$2,270.00 $18.00$4,086.00 
12EXCAVATION, EMBANKMENT12488C.Y.$5.50$68,684.00 $3.00$37,464.00 $5.50$68,684.00 
13EXCAVATION, DREDGING518C.Y.$9.00$4,662.00 $30.00$15,540.00 $17.00$8,806.00 
14EARTHFILL, GENERAL FILL949C.Y.$5.00$4,745.00 $16.00$15,184.00 $20.00$18,980.00 
15EARTHFILL, EMBANKMENT CONSTRUCTION13728C.Y.$5.50$75,504.00 $4.00$54,912.00 $5.00$68,640.00 
16COMPACTION TESTING1L.S.$5,000.00$5,000.00 $17,000.00$17,000.00 $15,000.00$15,000.00 
17CONCRETE TESTING1L.S.$2,000.00$2,000.00 $2,000.00$2,000.00 $5,000.00$5,000.00 
18RCPP, 24", CLASS 25289L.F.$175.16$50,621.24 $140.00$40,460.00 $206.00$59,534.00 
1924" DUCTILE IRON PIPE327L.F.$423.54$138,497.58 $300.00$98,100.00 $515.00$168,405.00 
20CANTILEVERED PIPE OUTLET CRADLE1L.S.$25,000.00$25,000.00 $8,000.00$8,000.00 $7,500.00$7,500.00 
21CONCRETE RISER AND HATCH, 60"1L.S.$38,002.63$38,002.63 $65,000.00$65,000.00 $44,000.00$44,000.00 
22SLUICE GATE, 36"1L.S.$37,515.18$37,515.18 $45,000.00$45,000.00 $56,000.00$56,000.00 
23CONCRETE PIPE BEDDING1L.S.$19,000.00$19,000.00 $8,000.00$8,000.00 $17,250.00$17,250.00 
24SAND FILTER DIAPHRAGM1L.S.$8,000.00$8,000.00 $15,000.00$15,000.00 $15,000.00$15,000.00 
256" DUAL WALL HDPE, NON-PERFORATED362L.F.$22.00$7,964.00 $3.00$1,086.00 $27.00$9,774.00 
266" DUAL WALL HDPE, PERFORATED60L.F.$25.00$1,500.00 $3.00$180.00 $43.50$2,610.00 
278" ALUMINIZED CMP, 14 GA20L.F.$40.00$800.00 $20.00$400.00 $50.00$1,000.00 
28LAKE DRAWDOWN AND CONTROL OF WATER1L.S.$20,000.00$20,000.00 $160,000.00$160,000.00 $60,000.00$60,000.00 
29EROSION CONTROL, SILT FENCE715L.F.$2.50$1,787.50 $3.00$2,145.00 $2.50$1,787.50 
30EROSION CONTROL, TYPE 2B RECP975S.Y.$2.50$2,437.50 $2.00$1,950.00 $1.80$1,755.00 
31EROSION CONTROL, TEMPORARY SEEDING2.5Acres$2,000.00$5,000.00 $1,000.00$2,500.00 $800.00$2,000.00 
32SEEDING, MULCHING, AND FERTILIZER, SMOOTH BROME2.5Acres$4,500.00$11,250.00 $1,500.00$3,750.00 $1,460.00$3,650.00 
33SEEDING, MULCHING, AND FERTILIZER, TYPE 22.5Acres$4,500.00$11,250.00 $2,000.00$5,000.00 $1,500.00$3,750.00 
34SWPPP MANAGEMENT1L.S.$8,000.00$8,000.00 $5,500.00$5,500.00 $4,000.00$4,000.00 
      $752,888.63  $775,576.00  $804,770.00 
 
4
5
6
Estimated Cost: $810,000.00
Contractor: 
Midwest Augers, IncJB Holland Construction, IncThree Oaks Construction, Inc
Funding Source: 100% Lake Restoration, 625 Nile Kinnick Drive South
2191 US Hwy 52
515 S Flynn St
Adel IA  50003Decorah IA  52101North Sioux City SD  57049
Plan Sets Requested: 5
Quantities
515-720-9808563-382-2901712-251-1767
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION & DEMOBILIZATION1L.S.$62,500.00$62,500.00 $60,000.00$60,000.00 $150,000.00$150,000.00 
2SITE PREPARATION & CLEARING1L.S.$17,200.00$17,200.00 $5,500.00$5,500.00 $15,000.00$15,000.00 
3ACCESS CONTROL1L.S.$7,350.00$7,350.00 $1,500.00$1,500.00 $10,000.00$10,000.00 
4TOPSOIL STRIP, STOCKPILE, AND RESPREAD3641C.Y.$6.00$21,846.00 $3.50$12,743.50 $14.20$51,702.20 
5REMOVE, SALVAGE, AND REPLACE EXISTING RIP RAP1L.S.$2,225.00$2,225.00 $3,500.00$3,500.00 $89,490.00$89,490.00 
6CLASS 'E' RIP RAP120Tons$81.00$9,720.00 $76.00$9,120.00 $100.00$12,000.00 
7CLASS 'B' RIP RAP451Tons$82.00$36,982.00 $76.00$34,276.00 $100.00$45,100.00 
8MACADAM STONE149Tons$73.00$10,877.00 $50.00$7,450.00 $75.00$11,175.00 
92" CLEAN STONE55Tons$71.00$3,905.00 $70.00$3,850.00 $75.00$4,125.00 
10EROSION STONE100Tons$92.00$9,200.00 $56.00$5,600.00 $75.00$7,500.00 
11EXCAVATION, LOW WATER CROSSING227C.Y.$125.00$28,375.00 $2.75$624.25 $8.00$1,816.00 
12EXCAVATION, EMBANKMENT12488C.Y.$0.50$6,244.00 $5.75$71,806.00 $8.00$99,904.00 
13EXCAVATION, DREDGING518C.Y.$9.00$4,662.00 $12.00$6,216.00 $8.00$4,144.00 
14EARTHFILL, GENERAL FILL949C.Y.$25.00$23,725.00 $3.50$3,321.50 $10.00$9,490.00 
15EARTHFILL, EMBANKMENT CONSTRUCTION13728C.Y.$0.50$6,864.00 $5.25$72,072.00 $10.00$137,280.00 
16COMPACTION TESTING1L.S.$5,000.00$5,000.00 $8,500.00$8,500.00 $5,000.00$5,000.00 
17CONCRETE TESTING1L.S.$2,500.00$2,500.00 $8,300.00$8,300.00 $3,500.00$3,500.00 
18RCPP, 24", CLASS 25289L.F.$192.00$55,488.00 $131.50$38,003.50 $200.00$57,800.00 
1924" DUCTILE IRON PIPE327L.F.$325.00$106,275.00 $436.00$142,572.00 $180.00$58,860.00 
20CANTILEVERED PIPE OUTLET CRADLE1L.S.$11,250.00$11,250.00 $23,350.00$23,350.00 $28,000.00$28,000.00 
21CONCRETE RISER AND HATCH, 60"1L.S.$19,100.00$19,100.00 $38,000.00$38,000.00 $60,000.00$60,000.00 
22SLUICE GATE, 36"1L.S.$55,000.00$55,000.00 $57,250.00$57,250.00 $31,000.00$31,000.00 
23CONCRETE PIPE BEDDING1L.S.$22,150.00$22,150.00 $15,000.00$15,000.00 $3,000.00$3,000.00 
24SAND FILTER DIAPHRAGM1L.S.$63,250.00$63,250.00 $59,000.00$59,000.00 $52,000.00$52,000.00 
256" DUAL WALL HDPE, NON-PERFORATED362L.F.$55.00$19,910.00 $20.00$7,240.00 $7.00$2,534.00 
266" DUAL WALL HDPE, PERFORATED60L.F.$105.00$6,300.00 $20.00$1,200.00 $7.00$420.00 
278" ALUMINIZED CMP, 14 GA20L.F.$111.00$2,220.00 $30.00$600.00 $75.00$1,500.00 
28LAKE DRAWDOWN AND CONTROL OF WATER1L.S.$156,748.00$156,748.00 $165,000.00$165,000.00 $100,000.00$100,000.00 
29EROSION CONTROL, SILT FENCE715L.F.$8.00$5,720.00 $3.00$2,145.00 $3.00$2,145.00 
30EROSION CONTROL, TYPE 2B RECP975S.Y.$14.00$13,650.00 $2.00$1,950.00 $3.00$2,925.00 
31EROSION CONTROL, TEMPORARY SEEDING2.5Acres$3,000.00$7,500.00 $400.00$1,000.00 $1,000.00$2,500.00 
32SEEDING, MULCHING, AND FERTILIZER, SMOOTH BROME2.5Acres$3,000.00$7,500.00 $1,800.00$4,500.00 $3,500.00$8,750.00 
33SEEDING, MULCHING, AND FERTILIZER, TYPE 22.5Acres$3,000.00$7,500.00 $1,800.00$4,500.00 $3,500.00$8,750.00 
34SWPPP MANAGEMENT1L.S.$4,720.00$4,720.00 $5,000.00$5,000.00 $3,000.00$3,000.00 
      $823,456.00  $880,689.75  $1,080,410.20 
 



 

8/7/2026