IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Clear Lake State Park  Date: 11/20/2025  Project No.  
  Lodge Repairs REBID  County:   CERRO GORDO  Time: 11:00 a.m.  23-03-17-13

 

 
1
2
3
Estimated Cost: $480,000.00
Contractor: 
Henkel Construction CompanyLarson Contracting Central, LLCLejas Corporation
Funding Source: 50% Infrastructure, 50% Federal-Land and Water Conservation Fund, 208 East State Street
508 W Main St
6202 S Maple Avenue, Suite 127
Mason City IA  50401Lake Mills IA  50450Tempe AZ  85283
Plan Sets Requested: 2
Quantities
641-423-5674641-592-5800480-775-1152
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION1L.S.$51,270.00$51,270.00 $27,527.00$27,527.00 $25,100.00$25,100.00 
2CONCRETE DEMO - CUTTING/REMOVAL/DISPOSAL650S.F.$7.15$4,647.50 $8.23$5,349.50 $18.00$11,700.00 
3CONCRETE NEW - GRANULAR BASE/REINFORCEMENT/FORMING/FINISHING1200S.F.$40.03$48,036.00 $13.75$16,500.00 $14.00$16,800.00 
4CONCRETE ACCESSORIES - EMBEDDED ITEMS/ADA SIGNAGE AND STRIPING1L.S.$581.00$581.00 $10,162.00$10,162.00 $3,565.00$3,565.00 
5MASONRY - FIREPLACE/FIREBRICK REPAIR, CLEANING AND TUCKPOINTING1L.S.$26,096.00$26,096.00 $28,809.00$28,809.00 $5,250.00$5,250.00 
6MASONRY - STONE CLEANING AND TUCKPOINTING1L.S.$33,710.00$33,710.00 $40,899.00$40,899.00 $7,445.00$7,445.00 
7WOOD - TIMBER REPLACEMENT/STAINING/LACQUER/POLYURETHANE1L.S.$1,792.00$1,792.00 $33,857.00$33,857.00 $49,500.00$49,500.00 
8WOOD - TIMBER AND WOOD COBB BLASTING/LACQUER/POLYURETHANE1L.S.$20,000.00$20,000.00 $6,216.00$6,216.00 $27,685.00$27,685.00 
9THERMAL AND MOISTURE - GUTTERS220L.F.$17.00$3,740.00 $75.60$16,632.00 $44.00$9,680.00 
10THERMAL AND MOISTURE - DOWNSPOUTS AND SUB-GRADE DRAINAGE1L.S.$8,488.00$8,488.00 $8,179.00$8,179.00 $20,775.00$20,775.00 
11OPENINGS - REPLACEMENT WINDOWS - MATERIALS1L.S.$63,897.00$63,897.00 $86,225.00$86,225.00 $28,000.00$28,000.00 
12OPENINGS - REPLACEMENT WINDOWS INSTALL/WOOD WINDOW TRIMS1L.S.$24,792.00$24,792.00 $34,181.00$34,181.00 $37,500.00$37,500.00 
13OPENINGS - HARDWARE1L.S.$4,874.00$4,874.00 $9,199.00$9,199.00 $10,000.00$10,000.00 
14FINISHES - RESINOUS FLOORING - FLOOR PREPARATION/CLEANING/SEALING1400S.F.$4.20$5,880.00 $4.57$6,398.00 $6.10$8,540.00 
15FINISHES - RESINOUS FLOORING - NEW FLOORING AND BASE INSTALL265S.F.$9.55$2,530.75 $12.44$3,296.60 $17.00$4,505.00 
16FINISHES - INTERIOR WALL FRAMING/GYPSUM BOARD/FINISHING1L.S.$996.00$996.00 $10,399.00$10,399.00 $1,400.00$1,400.00 
17FINISHES - INTERIOR WALL AND CEILING REPAIRS AND CLEANING1L.S.$32,100.00$32,100.00 $10,517.00$10,517.00 $15,950.00$15,950.00 
18FINISHES - EXTERIOR WALL REPAIRS, CLEANING AND COATINGS1L.S.$33,169.00$33,169.00 $13,521.00$13,521.00 $21,525.00$21,525.00 
19INTERIOR SPECIALTIES - TOILET PARTITIONS AND URINAL SCREEN1L.S.$7,790.00$7,790.00 $7,011.00$7,011.00 $6,100.00$6,100.00 
20INTERIOR SPECIALTIES - RESTROOM ACCESSORIES1L.S.$3,471.00$3,471.00 $8,153.00$8,153.00 $2,950.00$2,950.00 
21EQUIPMENT - KITCHEN APPLIANCES1L.S.$2,315.00$2,315.00 $2,996.00$2,996.00 $9,000.00$9,000.00 
22FURNISHINGS - COUNTERTOPS1L.S.$2,472.00$2,472.00 $4,289.00$4,289.00 $11,883.00$11,883.00 
23FURNISHINGS - WOOD CASEWORK1L.S.$5,236.00$5,236.00 $14,416.00$14,416.00 $16,665.00$16,665.00 
24PLUMBING - PIPING, EQUIPMENT AND FIXTURES1L.S.$17,232.00$17,232.00 $17,665.00$17,665.00 $15,250.00$15,250.00 
25HVAC - 3-HEAD MINI-SPLIT HEATING AND COOLING SYSTEM1L.S.$30,401.00$30,401.00 $16,422.00$16,422.00 $40,517.00$40,517.00 
26ELECTRICAL - ROUGH-IN AND MATERIALS1L.S.$5,167.00$5,167.00 $6,551.00$6,551.00 $22,685.00$22,685.00 
27ELECTRICAL - CEILING FANS, LIGHTING FIXTURES AND SWITCHES1L.S.$7,710.00$7,710.00 $8,470.00$8,470.00 $19,900.00$19,900.00 
28EARTHWORK - GRADING AND SEEDING1L.S.$2,086.00$2,086.00 $932.00$932.00 $6,666.00$6,666.00 
29EARTHWORK - STORMWATER CULVERT AND STONE BALLAST1L.S.$3,522.00$3,522.00 $5,661.00$5,661.00 $9,550.00$9,550.00 
      $454,001.25  $460,433.10  $466,086.00 
 
4
5
6
Estimated Cost: $480,000.00
Contractor: 
Sadler Construction IncThe Joseph Company IncDean Snyder Construction Co
Funding Source: 50% Infrastructure, 50% Federal-Land and Water Conservation Fund, 1905 N Iowa Ave
2003 14th Street NE Suite 106
913 North 14th St
Eagle Grove IA  50533Austin MN  55912Clear Lake IA  50428
Plan Sets Requested: 2
Quantities
515-448-3856507-437-3284641-357-2283
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION1L.S.$35,000.00$35,000.00 $76,378.50$76,378.50 $135,000.00$135,000.00 
2CONCRETE DEMO - CUTTING/REMOVAL/DISPOSAL650S.F.$6.60$4,290.00 $19.80$12,870.00 $21.00$13,650.00 
3CONCRETE NEW - GRANULAR BASE/REINFORCEMENT/FORMING/FINISHING1200S.F.$25.00$30,000.00 $30.80$36,960.00 $32.00$38,400.00 
4CONCRETE ACCESSORIES - EMBEDDED ITEMS/ADA SIGNAGE AND STRIPING1L.S.$3,210.00$3,210.00 $6,050.00$6,050.00 $3,225.00$3,225.00 
5MASONRY - FIREPLACE/FIREBRICK REPAIR, CLEANING AND TUCKPOINTING1L.S.$22,500.00$22,500.00 $25,740.00$25,740.00 $25,000.00$25,000.00 
6MASONRY - STONE CLEANING AND TUCKPOINTING1L.S.$39,400.00$39,400.00 $33,110.00$33,110.00 $10,000.00$10,000.00 
7WOOD - TIMBER REPLACEMENT/STAINING/LACQUER/POLYURETHANE1L.S.$26,950.00$26,950.00 $60,192.00$60,192.00 $45,000.00$45,000.00 
8WOOD - TIMBER AND WOOD COBB BLASTING/LACQUER/POLYURETHANE1L.S.$20,000.00$20,000.00 $36,300.00$36,300.00 $25,000.00$25,000.00 
9THERMAL AND MOISTURE - GUTTERS220L.F.$12.45$2,739.00 $18.70$4,114.00 $50.00$11,000.00 
10THERMAL AND MOISTURE - DOWNSPOUTS AND SUB-GRADE DRAINAGE1L.S.$2,500.00$2,500.00 $13,750.00$13,750.00 $18,000.00$18,000.00 
11OPENINGS - REPLACEMENT WINDOWS - MATERIALS1L.S.$89,500.00$89,500.00 $141,350.00$141,350.00 $75,000.00$75,000.00 
12OPENINGS - REPLACEMENT WINDOWS INSTALL/WOOD WINDOW TRIMS1L.S.$30,000.00$30,000.00 $38,335.00$38,335.00 $35,000.00$35,000.00 
13OPENINGS - HARDWARE1L.S.$14,150.00$14,150.00 $9,020.00$9,020.00 $18,000.00$18,000.00 
14FINISHES - RESINOUS FLOORING - FLOOR PREPARATION/CLEANING/SEALING1400S.F.$13.00$18,200.00 $4.07$5,698.00 $15.00$21,000.00 
15FINISHES - RESINOUS FLOORING - NEW FLOORING AND BASE INSTALL265S.F.$60.00$15,900.00 $11.39$3,018.35 $46.00$12,190.00 
16FINISHES - INTERIOR WALL FRAMING/GYPSUM BOARD/FINISHING1L.S.$3,000.00$3,000.00 $3,850.00$3,850.00 $5,500.00$5,500.00 
17FINISHES - INTERIOR WALL AND CEILING REPAIRS AND CLEANING1L.S.$20,900.00$20,900.00 $15,620.00$15,620.00 $17,000.00$17,000.00 
18FINISHES - EXTERIOR WALL REPAIRS, CLEANING AND COATINGS1L.S.$7,500.00$7,500.00 $7,810.00$7,810.00 $6,000.00$6,000.00 
19INTERIOR SPECIALTIES - TOILET PARTITIONS AND URINAL SCREEN1L.S.$10,780.00$10,780.00 $8,167.50$8,167.50 $10,280.00$10,280.00 
20INTERIOR SPECIALTIES - RESTROOM ACCESSORIES1L.S.$5,500.00$5,500.00 $3,377.00$3,377.00 $7,910.00$7,910.00 
21EQUIPMENT - KITCHEN APPLIANCES1L.S.$2,100.00$2,100.00 $3,608.00$3,608.00 $2,941.00$2,941.00 
22FURNISHINGS - COUNTERTOPS1L.S.$3,150.00$3,150.00 $5,280.00$5,280.00 $5,400.00$5,400.00 
23FURNISHINGS - WOOD CASEWORK1L.S.$9,725.00$9,725.00 $9,350.00$9,350.00 $18,000.00$18,000.00 
24PLUMBING - PIPING, EQUIPMENT AND FIXTURES1L.S.$14,250.00$14,250.00 $11,715.00$11,715.00 $16,000.00$16,000.00 
25HVAC - 3-HEAD MINI-SPLIT HEATING AND COOLING SYSTEM1L.S.$20,100.00$20,100.00 $18,117.00$18,117.00 $19,950.00$19,950.00 
26ELECTRICAL - ROUGH-IN AND MATERIALS1L.S.$2,620.00$2,620.00 $5,021.50$5,021.50 $13,000.00$13,000.00 
27ELECTRICAL - CEILING FANS, LIGHTING FIXTURES AND SWITCHES1L.S.$6,675.00$6,675.00 $8,684.50$8,684.50 $12,000.00$12,000.00 
28EARTHWORK - GRADING AND SEEDING1L.S.$1,500.00$1,500.00 $1,980.00$1,980.00 $1,500.00$1,500.00 
29EARTHWORK - STORMWATER CULVERT AND STONE BALLAST1L.S.$4,000.00$4,000.00 $20,240.00$20,240.00 $5,000.00$5,000.00 
      $466,139.00  $625,706.35  $625,946.00 
 



 

12/5/2025