IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Iowa Great Lakes  Date: 8/21/2025  Project No.  
  Shoreline Stabilization  County:   DICKINSON  Time: 11:00 a.m.  25-01-30-14

 

 
1
2
3
Estimated Cost: $864,270.00
Contractor: 
Midwest Lake ServiceThree Oaks Contruction IncJones Contractors & Associates LLC
Funding Source: 100% Lake Restoration, 2902 Aurora Ave W
515 S Flynn St
PO Box 757
13635 Route 52
Spirit Lake IA  51360North Sioux City SD  57049Dyersville IA  52040
Plan Sets Requested: 4
Quantities
712-339-6868712-251-1767563-880-7885
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Clearing and Grubbing0.68Acres$35,558.82$24,179.998 $5,000.00$3,400.00 $15,000.00$10,200.00 
2Topsoil, Off-Site210C.Y.$79.00$16,590.00 $75.00$15,750.00 $141.18$29,647.80 
3Excavation, Class 131478C.Y.$16.91$24,992.98 $15.00$22,170.00 $32.68$48,301.04 
4Removal of Structure, Wooden Stairs / Deck6Each$500.00$3,000.00 $250.00$1,500.00 $13,248.00$79,488.00 
5Removal of Structure, Concrete Stairs / Patio3Each$1,000.00$3,000.00 $250.00$750.00 $26,829.33$80,487.99 
6Removal of Structure, Wood Retaining Wall1Each$4,000.00$4,000.00 $2,000.00$2,000.00 $18,248.00$18,248.00 
7Removal of Structure, Modular Block Retaining Wall4Each$500.00$2,000.00 $2,000.00$8,000.00 $11,246.00$44,984.00 
8Storm Sewer, Trenched, Unknown Matieral, Unknown Size186L.F.$26.88$4,999.68 $50.00$9,300.00 $154.24$28,688.64 
9Asphalt, HMA ST Surface, 1.5" Thickness, 1/2" Mix, PG 58-28S2740S.Y.$17.15$46,991.00 $20.00$54,800.00 $32.59$89,296.60 
10Removal of Shared Use Path11S.Y.$90.91$1,000.01 $12.00$132.00 $1,850.55$20,356.05 
11Shared Use Path, PCC, 5 Inch11S.Y.$363.64$4,000.04 $72.00$792.00 $279.27$3,071.97 
12Engineering Fabric3693S.Y.$2.25$8,309.25 $4.00$14,772.00 $2.72$10,044.96 
13Painted Pavement Markings , Solvent/Waterborne7.02STA.$370.37$2,599.997 $350.00$2,457.00 $403.13$2,829.973 
14Painted Pavement Markings , Solvent/Waterborne1Each$500.00$500.00 $200.00$200.00 $556.00$556.00 
15Temporary Traffic Control, Big Spirit Lake, Orleans Boat Ramp1L.S.$500.00$500.00 $500.00$500.00 $1,356.00$1,356.00 
16Temporary Traffic Control, East Okoboji Lake, East Okoboji Beach1L.S.$500.00$500.00 $500.00$500.00 $1,756.00$1,756.00 
17Temporary Traffic Control, East Okoboji Lake, Isthmus Park1L.S.$500.00$500.00 $500.00$500.00 $1,956.00$1,956.00 
18Temporary Traffic Control, Silver Lake, Trappers Bay1L.S.$500.00$500.00 $500.00$500.00 $1,956.00$1,956.00 
19Temporary Traffic Control, West Okoboji, Gull Point State Park1L.S.$500.00$500.00 $500.00$500.00 $2,256.00$2,256.00 
20Conventional Seeding, Seeding, Fertilizing, and Mulching, Type 4 - Urban Temporary Erosion Control1.25Acres$7,740.00$9,675.00 $5,000.00$6,250.00 $2,000.00$2,500.00 
21Hydraulic Seeding, Seeding, Fertilizing, and Mulching, Native1.25Acres$11,609.60$14,512.00 $7,700.00$9,625.00 $5,000.00$6,250.00 
22SWPPP Preparation1L.S.$1,000.00$1,000.00 $3,500.00$3,500.00 $2,496.00$2,496.00 
23SWPPP Management1L.S.$1,000.00$1,000.00 $2,500.00$2,500.00 $4,992.00$4,992.00 
24Filter Sock, 9 Inch3100L.F.$2.89$8,959.00 $3.00$9,300.00 $4.20$13,020.00 
25Filter socks, Removal3100L.F.$0.35$1,085.00 $1.00$3,100.00 $0.87$2,697.00 
26Temporary RECP, 3.B1532S.Y.$2.50$3,830.00 $4.00$6,128.00 $3.95$6,051.40 
27Rip Rap, Class D1156Tons$135.00$156,060.00 $75.00$86,700.00 $90.40$104,502.40 
28Fieldstone (Imported)659Tons$175.00$115,325.00 $110.00$72,490.00 $172.76$113,848.84 
29Fieldstone (Salvaged)571Tons$45.00$25,695.00 $20.00$11,420.00 $32.93$18,803.03 
30Floating Silt Curtain (Turbidity Barrier)1000L.F.$2.50$2,500.00 $20.00$20,000.00 $29.24$29,240.00 
31Emergency Erosion Control Mobilization8Each$500.00$4,000.00 $1,000.00$8,000.00 $10,000.00$80,000.00 
32Temporary Construction Fence, Orange Plastic4000L.F.$1.25$5,000.00 $3.00$12,000.00 $5.58$22,320.00 
33Construction Survey1L.S.$10,000.00$10,000.00 $5,000.00$5,000.00 $28,000.00$28,000.00 
34Mobilization, Big Spirit Lake, Orleans Boat Ramp1L.S.$6,000.00$6,000.00 $115,000.00$115,000.00 $23,000.00$23,000.00 
35Mobilization, East Okoboji Lake, East Okoboji Beach1L.S.$6,000.00$6,000.00 $115,000.00$115,000.00 $23,000.00$23,000.00 
36Mobilization, East Okoboji Lake, Isthums Park1L.S.$6,000.00$6,000.00 $115,000.00$115,000.00 $20,000.00$20,000.00 
37Mobilization, Silver Lake, Trappers Bay1L.S.$6,000.00$6,000.00 $115,000.00$115,000.00 $23,000.00$23,000.00 
38Mobilization, West Okoboji, Gull Point State Park1L.S.$6,000.00$6,000.00 $115,000.00$115,000.00 $23,000.00$23,000.00 
      $537,303.955  $969,536.00  $1,022,201.693 
 
4
5
6
Estimated Cost: $864,270.00
Contractor: 
Schoeleman Contracting, LLC
Funding Source: 100% Lake Restoration, 1530 370th St


Royal IA  51357    
Plan Sets Requested: 4
Quantities
712-260-4595
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Clearing and Grubbing0.68Acres$9,823.53$6,680.00 $0.00 $0.00 
2Topsoil, Off-Site210C.Y.$203.19$42,669.90 $0.00 $0.00 
3Excavation, Class 131478C.Y.$100.00$147,800.00 $0.00 $0.00 
4Removal of Structure, Wooden Stairs / Deck6Each$1,000.00$6,000.00 $0.00 $0.00 
5Removal of Structure, Concrete Stairs / Patio3Each$1,500.00$4,500.00 $0.00 $0.00 
6Removal of Structure, Wood Retaining Wall1Each$2,000.00$2,000.00 $0.00 $0.00 
7Removal of Structure, Modular Block Retaining Wall4Each$1,750.00$7,000.00 $0.00 $0.00 
8Storm Sewer, Trenched, Unknown Matieral, Unknown Size186L.F.$12.00$2,232.00 $0.00 $0.00 
9Asphalt, HMA ST Surface, 1.5" Thickness, 1/2" Mix, PG 58-28S2740S.Y.$19.90$54,526.00 $0.00 $0.00 
10Removal of Shared Use Path11S.Y.$50.00$550.00 $0.00 $0.00 
11Shared Use Path, PCC, 5 Inch11S.Y.$72.00$792.00 $0.00 $0.00 
12Engineering Fabric3693S.Y.$3.00$11,079.00 $0.00 $0.00 
13Painted Pavement Markings , Solvent/Waterborne7.02STA.$1,000.00$7,020.00 $0.00 $0.00 
14Painted Pavement Markings , Solvent/Waterborne1Each$1,500.00$1,500.00 $0.00 $0.00 
15Temporary Traffic Control, Big Spirit Lake, Orleans Boat Ramp1L.S.$1,000.00$1,000.00 $0.00 $0.00 
16Temporary Traffic Control, East Okoboji Lake, East Okoboji Beach1L.S.$1,000.00$1,000.00 $0.00 $0.00 
17Temporary Traffic Control, East Okoboji Lake, Isthmus Park1L.S.$1,000.00$1,000.00 $0.00 $0.00 
18Temporary Traffic Control, Silver Lake, Trappers Bay1L.S.$1,000.00$1,000.00 $0.00 $0.00 
19Temporary Traffic Control, West Okoboji, Gull Point State Park1L.S.$1,000.00$1,000.00 $0.00 $0.00 
20Conventional Seeding, Seeding, Fertilizing, and Mulching, Type 4 - Urban Temporary Erosion Control1.25Acres$21,780.00$27,225.00 $0.00 $0.00 
21Hydraulic Seeding, Seeding, Fertilizing, and Mulching, Native1.25Acres$21,780.00$27,225.00 $0.00 $0.00 
22SWPPP Preparation1L.S.$5,000.00$5,000.00 $0.00 $0.00 
23SWPPP Management1L.S.$5,000.00$5,000.00 $0.00 $0.00 
24Filter Sock, 9 Inch3100L.F.$3.50$10,850.00 $0.00 $0.00 
25Filter socks, Removal3100L.F.$2.00$6,200.00 $0.00 $0.00 
26Temporary RECP, 3.B1532S.Y.$5.00$7,660.00 $0.00 $0.00 
27Rip Rap, Class D1156Tons$286.50$331,194.00 $0.00 $0.00 
28Fieldstone (Imported)659Tons$325.00$214,175.00 $0.00 $0.00 
29Fieldstone (Salvaged)571Tons$100.00$57,100.00 $0.00 $0.00 
30Floating Silt Curtain (Turbidity Barrier)1000L.F.$10.00$10,000.00 $0.00 $0.00 
31Emergency Erosion Control Mobilization8Each$5,000.00$40,000.00 $0.00 $0.00 
32Temporary Construction Fence, Orange Plastic4000L.F.$1.50$6,000.00 $0.00 $0.00 
33Construction Survey1L.S.$5,000.00$5,000.00 $0.00 $0.00 
34Mobilization, Big Spirit Lake, Orleans Boat Ramp1L.S.$20,000.00$20,000.00 $0.00 $0.00 
35Mobilization, East Okoboji Lake, East Okoboji Beach1L.S.$20,000.00$20,000.00 $0.00 $0.00 
36Mobilization, East Okoboji Lake, Isthums Park1L.S.$5,000.00$5,000.00 $0.00 $0.00 
37Mobilization, Silver Lake, Trappers Bay1L.S.$20,000.00$20,000.00 $0.00 $0.00 
38Mobilization, West Okoboji, Gull Point State Park1L.S.$25,000.00$25,000.00 $0.00 $0.00 
      $1,141,977.90  $0.00  $0.00 
 



 

12/5/2025