IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Beeds Lake State Park  Date: 10/24/2024  Project No.  
  Wastewater Connection  County:   FRANKLIN  Time: 11:00 a.m.  24-02-35-01

 

 
1
2
3
Estimated Cost: $1,989,460.00
Contractor: 
McDowell & Sons, IncBoomerang Corp of IowaGehrke Inc
Funding Source: 70% Infrastructure, 30% Other, 10214 Highway 65
13225 Circle Drive Suite A
PO Box 227
1405 21st Ave
PO Box 228
Iowa Falls IA  50126Anamosa IA  52205Eldora IA  50627
Plan Sets Requested: 6
Quantities
641-648-5071319-462-4435641-858-3821
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Clearing and Grubbing1L.S.$10,000.00$10,000.00 $12,000.00$12,000.00 $20,000.00$20,000.00 
2Excavation, Class 101640C.Y.$7.00$11,480.00 $40.00$65,600.00 $12.00$19,680.00 
3Over-excavation, Unsuitable or Unstable Soils300C.Y.$4.00$1,200.00 $60.00$18,000.00 $76.00$22,800.00 
4Sanitary Sewer Gravity Main, Trenched, PVC, 8"1075L.F.$30.00$32,250.00 $40.00$43,000.00 $90.00$96,750.00 
5Sanitary Sewer Gravity Main, Trenchless, PVC, 8"364L.F.$174.00$63,336.00 $86.00$31,304.00 $227.00$82,628.00 
6Sanitary Sewer Gravity Main with Casing Pipe, Trenchless, PVC, 8"221L.F.$600.00$132,600.00 $700.00$154,700.00 $550.00$121,550.00 
7Sanitary Sewer Force Main, PVC, 4"18070L.F.$31.00$560,170.00 $18.00$325,260.00 $40.25$727,317.50 
8Sanitary Sewer Force Main with Casing Pipe, Trenchless, PVC, 4"85L.F.$600.00$51,000.00 $300.00$25,500.00 $465.00$39,525.00 
9Combination Air Valve and Pit7Each$12,000.00$84,000.00 $15,000.00$105,000.00 $7,300.00$51,100.00 
10Drain Valve and Pit3Each$18,000.00$54,000.00 $17,000.00$51,000.00 $11,115.00$33,345.00 
11Repair Field Tile4Each$250.00$1,000.00 $400.00$1,600.00 $690.00$2,760.00 
12Manhole, SW-301, 48"8Each$4,000.00$32,000.00 $6,000.00$48,000.00 $6,100.00$48,800.00 
13Internal Drop Connection, 8"4Each$1,800.00$7,200.00 $2,000.00$8,000.00 $1,700.00$6,800.00 
14Connection to Existing Manhole1Each$5,000.00$5,000.00 $1,200.00$1,200.00 $2,700.00$2,700.00 
15Remove Manhole2Each$4,000.00$8,000.00 $500.00$1,000.00 $1,450.00$2,900.00 
16Flowmeter and Manhole, Sanitary Sewer Gravity Main1Each$20,000.00$20,000.00 $20,000.00$20,000.00 $16,000.00$16,000.00 
17Flowmeter and Manhole, Sanitary Sewer Force Main1Each$20,000.00$20,000.00 $24,000.00$24,000.00 $13,500.00$13,500.00 
18Lift Station and Waste Stabilization1L.S.$220,000.00$220,000.00 $440,000.00$440,000.00 $315,000.00$315,000.00 
19Septic Tank2Each$8,000.00$16,000.00 $4,000.00$8,000.00 $6,000.00$12,000.00 
20Driveway, Granular, 6"430S.Y.$16.00$6,880.00 $12.00$5,160.00 $10.50$4,515.00 
21Temporary Traffic Control1L.S.$10,000.00$10,000.00 $12,000.00$12,000.00 $18,000.00$18,000.00 
22SWPPP Preparation1L.S.$4,000.00$4,000.00 $2,500.00$2,500.00 $3,500.00$3,500.00 
23SWPPP Management1L.S.$6,000.00$6,000.00 $4,000.00$4,000.00 $2,100.00$2,100.00 
24Erosion Control1L.S.$20,000.00$20,000.00 $16,000.00$16,000.00 $8,500.00$8,500.00 
25Lagoon Sludge Disposal and Land Application1L.S.$100,000.00$100,000.00 $81,200.00$81,200.00 $108,000.00$108,000.00 
26Lagoon Structure and Equipment Demolition1L.S.$8,500.00$8,500.00 $20,000.00$20,000.00 $22,000.00$22,000.00 
27Construction Survey1L.S.$11,000.00$11,000.00 $15,000.00$15,000.00 $12,000.00$12,000.00 
28Mobilization1L.S.$40,000.00$40,000.00 $295,000.00$295,000.00 $92,000.00$92,000.00 
29Site Restoration1L.S.$15,000.00$15,000.00 $12,000.00$12,000.00 $42,000.00$42,000.00 
30Electrical, Complete1L.S.$165,000.00$165,000.00 $120,000.00$120,000.00 $127,000.00$127,000.00 
      $1,715,616.00  $1,966,024.00  $2,074,770.50 
 
4
5
6
Estimated Cost: $1,989,460.00
Contractor: 
GM Contracting IncJB Holland Construction, IncOn Track Construction LLC
Funding Source: 70% Infrastructure, 30% Other, 19810 515th Ave
2191 US Hwy 52
1435 W F Ave
Lake Crystal MN  56055Decorah IA  52101Nevada IA  50201
Plan Sets Requested: 6
Quantities
507-726-6433563-382-2901888-850-0208
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Clearing and Grubbing1L.S.$15,404.58$15,404.58 $75,000.00$75,000.00 $28,000.00$28,000.00 
2Excavation, Class 101640C.Y.$16.59$27,207.60 $6.40$10,496.00 $25.00$41,000.00 
3Over-excavation, Unsuitable or Unstable Soils300C.Y.$28.20$8,460.00 $69.00$20,700.00 $90.00$27,000.00 
4Sanitary Sewer Gravity Main, Trenched, PVC, 8"1075L.F.$97.53$104,844.75 $132.00$141,900.00 $105.00$112,875.00 
5Sanitary Sewer Gravity Main, Trenchless, PVC, 8"364L.F.$138.07$50,257.48 $159.00$57,876.00 $140.00$50,960.00 
6Sanitary Sewer Gravity Main with Casing Pipe, Trenchless, PVC, 8"221L.F.$437.22$96,625.62 $1,120.00$247,520.00 $500.00$110,500.00 
7Sanitary Sewer Force Main, PVC, 4"18070L.F.$37.07$669,854.90 $50.00$903,500.00 $40.00$722,800.00 
8Sanitary Sewer Force Main with Casing Pipe, Trenchless, PVC, 4"85L.F.$617.91$52,522.35 $780.00$66,300.00 $1,060.00$90,100.00 
9Combination Air Valve and Pit7Each$16,871.11$118,097.77 $16,800.00$117,600.00 $14,000.00$98,000.00 
10Drain Valve and Pit3Each$18,687.74$56,063.22 $17,800.00$53,400.00 $15,500.00$46,500.00 
11Repair Field Tile4Each$1,597.81$6,391.24 $820.00$3,280.00 $900.00$3,600.00 
12Manhole, SW-301, 48"8Each$7,066.20$56,529.60 $14,300.00$114,400.00 $4,500.00$36,000.00 
13Internal Drop Connection, 8"4Each$4,135.19$16,540.76 $3,560.00$14,240.00 $3,950.00$15,800.00 
14Connection to Existing Manhole1Each$3,902.88$3,902.88 $3,230.00$3,230.00 $5,000.00$5,000.00 
15Remove Manhole2Each$3,902.90$7,805.80 $1,290.00$2,580.00 $650.00$1,300.00 
16Flowmeter and Manhole, Sanitary Sewer Gravity Main1Each$17,037.29$17,037.29 $18,800.00$18,800.00 $20,000.00$20,000.00 
17Flowmeter and Manhole, Sanitary Sewer Force Main1Each$17,160.19$17,160.19 $22,000.00$22,000.00 $26,000.00$26,000.00 
18Lift Station and Waste Stabilization1L.S.$345,552.34$345,552.34 $454,650.00$454,650.00 $702,000.00$702,000.00 
19Septic Tank2Each$14,275.17$28,550.34 $20,650.00$41,300.00 $12,500.00$25,000.00 
20Driveway, Granular, 6"430S.Y.$25.00$10,750.00 $10.20$4,386.00 $10.00$4,300.00 
21Temporary Traffic Control1L.S.$20,000.00$20,000.00 $38,300.00$38,300.00 $15,000.00$15,000.00 
22SWPPP Preparation1L.S.$10,738.00$10,738.00 $2,620.00$2,620.00 $2,000.00$2,000.00 
23SWPPP Management1L.S.$34,272.64$34,272.64 $16,200.00$16,200.00 $12,000.00$12,000.00 
24Erosion Control1L.S.$20,687.73$20,687.73 $9,100.00$9,100.00 $100,000.00$100,000.00 
25Lagoon Sludge Disposal and Land Application1L.S.$95,404.00$95,404.00 $89,000.00$89,000.00 $98,500.00$98,500.00 
26Lagoon Structure and Equipment Demolition1L.S.$37,567.78$37,567.78 $11,100.00$11,100.00 $25,000.00$25,000.00 
27Construction Survey1L.S.$25,000.00$25,000.00 $26,200.00$26,200.00 $20,000.00$20,000.00 
28Mobilization1L.S.$417,162.22$417,162.22 $104,300.00$104,300.00 $270,000.00$270,000.00 
29Site Restoration1L.S.$199,703.63$199,703.63 $17,700.00$17,700.00 $125,000.00$125,000.00 
30Electrical, Complete1L.S.$164,250.00$164,250.00 $126,800.00$126,800.00 $165,893.00$165,893.00 
      $2,734,344.71  $2,814,478.00  $3,000,128.00 
 



 

10/28/2024