IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Okoboji View Wetland Complex  Date: 11/30/2023  Project No.  
  IDNR/INHF Phelps Wetland Restoration  County:   DICKINSON  Time: 3:00 p.m.  24-01-30-05

 

 
1
2
3
Estimated Cost: $85,000.00
Contractor: 
L. Thies LLC dba Empire ExcavationJohn Healy dba Healy ExcavatingMitchell & Huss Excavation, Inc
Funding Source: 100% Federal-NAWCA, 219 Lawndale St
3483 Perkins Ave
200 Lacour St
Odebolt IA  51458Lake View IA  51450George IA  51237
Plan Sets Requested: 0
Quantities
712-660-8137712-830-9179712-475-6711
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$2,500.00$2,500.00 $5,000.00$5,000.00 $6,000.00$6,000.00 
2Earthwork (Berm Fill)6610C.Y.$3.00$19,830.00 $3.50$23,135.00 $4.00$26,440.00 
36" Topsoil Strip Salvage, Respread (Berm)200C.Y.$5.00$1,000.00 $5.00$1,000.00 $8.00$1,600.00 
4Excavation (Berm Spillway)20C.Y.$4.00$80.00 $5.00$100.00 $10.00$200.00 
5Excavation (Northeast Wetland)3200C.Y.$3.00$9,600.00 $2.75$8,800.00 $4.00$12,800.00 
6Tile Investigation1250L.F.$2.00$2,500.00 $2.10$2,625.00 $2.50$3,125.00 
7Tile Break7Each$50.00$350.00 $150.00$1,050.00 $300.00$2,100.00 
812" Dia. Dual Wall HDPE (Non Perf)296L.F.$35.00$10,360.00 $38.50$11,396.00 $16.00$4,736.00 
912" Dia. Dual Wall HDPE Riser (Non Perf)3L.F.$30.00$90.00 $25.00$75.00 $20.00$60.00 
10HDPE Tee Connections1Each$200.00$200.00 $125.00$125.00 $250.00$250.00 
115" Perforated Tile (Install Only)1185L.F.$4.00$4,740.00 $3.50$4,147.50 $4.00$4,740.00 
1212" Heavy Duty Bar Guard2Each$200.00$400.00 $150.00$300.00 $125.00$250.00 
13Agri-drain Inline Water Control Structure (12" Dia. x 5' Tall)1Each$3,000.00$3,000.00 $2,000.00$2,000.00 $1,750.00$1,750.00 
143'x3' Anti-Seep Collar1Each$750.00$750.00 $350.00$350.00 $250.00$250.00 
15Water Control Structure Fire Proof Cover1Each$2,000.00$2,000.00 $750.00$750.00 $1,800.00$1,800.00 
16Pipe Anchor1Each$300.00$300.00 $500.00$500.00 $200.00$200.00 
17Concrete Collar1Each$1,000.00$1,000.00 $250.00$250.00 $400.00$400.00 
18Erosion Stone14Tons$55.00$770.00 $65.00$910.00 $60.00$840.00 
19Silt Fence1255L.F.$3.00$3,765.00 $2.50$3,137.50 $3.50$4,392.50 
20Rolled Erosion Control Blanket - SUDAS Type 3.A Natural Fiber2110S.Y.$2.00$4,220.00 $3.00$6,330.00 $3.50$7,385.00 
21Wattles534L.F.$3.00$1,602.00 $3.75$2,002.50 $3.00$1,602.00 
22Stormwater Permit and Inspections1Each$1,000.00$1,000.00 $1,000.00$1,000.00 $2,000.00$2,000.00 
23Stabilized Construction Entrance1L.S.$1,200.00$1,200.00 $1,500.00$1,500.00 $1,500.00$1,500.00 
      $71,257.00  $76,483.50  $84,420.50 
 
4
5
6
Estimated Cost: $85,000.00
Contractor: 
Valley Contracting, IncAbel Drainage & Excavating Inc
Funding Source: 100% Federal-NAWCA, 1850 Hwy 4
2380 440th St

Estherville IA  51334Greenville IA  51343  
Plan Sets Requested: 0
Quantities
712-362-4969712-262-9008
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$4,200.00$4,200.00 $5,000.00$5,000.00 $0.00 
2Earthwork (Berm Fill)6610C.Y.$4.00$26,440.00 $5.70$37,677.00 $0.00 
36" Topsoil Strip Salvage, Respread (Berm)200C.Y.$8.00$1,600.00 $15.00$3,000.00 $0.00 
4Excavation (Berm Spillway)20C.Y.$8.00$160.00 $25.00$500.00 $0.00 
5Excavation (Northeast Wetland)3200C.Y.$5.50$17,600.00 $4.50$14,400.00 $0.00 
6Tile Investigation1250L.F.$2.50$3,125.00 $2.00$2,500.00 $0.00 
7Tile Break7Each$250.00$1,750.00 $800.00$5,600.00 $0.00 
812" Dia. Dual Wall HDPE (Non Perf)296L.F.$23.00$6,808.00 $18.90$5,594.40 $0.00 
912" Dia. Dual Wall HDPE Riser (Non Perf)3L.F.$200.00$600.00 $50.00$150.00 $0.00 
10HDPE Tee Connections1Each$100.00$100.00 $750.00$750.00 $0.00 
115" Perforated Tile (Install Only)1185L.F.$7.00$8,295.00 $3.50$4,147.50 $0.00 
1212" Heavy Duty Bar Guard2Each$100.00$200.00 $80.00$160.00 $0.00 
13Agri-drain Inline Water Control Structure (12" Dia. x 5' Tall)1Each$2,100.00$2,100.00 $2,750.00$2,750.00 $0.00 
143'x3' Anti-Seep Collar1Each$450.00$450.00 $500.00$500.00 $0.00 
15Water Control Structure Fire Proof Cover1Each$1,530.00$1,530.00 $2,250.00$2,250.00 $0.00 
16Pipe Anchor1Each$250.00$250.00 $250.00$250.00 $0.00 
17Concrete Collar1Each$250.00$250.00 $500.00$500.00 $0.00 
18Erosion Stone14Tons$50.00$700.00 $110.00$1,540.00 $0.00 
19Silt Fence1255L.F.$4.50$5,647.50 $5.00$6,275.00 $0.00 
20Rolled Erosion Control Blanket - SUDAS Type 3.A Natural Fiber2110S.Y.$12.00$25,320.00 $6.00$12,660.00 $0.00 
21Wattles534L.F.$4.00$2,136.00 $3.00$1,602.00 $0.00 
22Stormwater Permit and Inspections1Each$1,500.00$1,500.00 $2,500.00$2,500.00 $0.00 
23Stabilized Construction Entrance1L.S.$1,000.00$1,000.00 $4,500.00$4,500.00 $0.00 
      $111,761.50  $114,805.90  $0.00 
 



 

12/21/2024