 Bids For:  Location:   Volga River Recreation Area  Date: 12/12/2024  Project No.  
  Hill Road Bridge Replacement  County:   FAYETTE  Time: 11:00 a.m.  23-03-33-01

 

 
1
2
3
Estimated Cost: $384,248.00
Contractor: 
Skyline Construction IncBacon Concrete LLCK-Construction Inc
Funding Source: 100% Park & Institutional Road Fund, 900 Montgomery St
370 N Bancroft St
PO Box 280
Decorah IA  52101Postville IA  52162Elkader IA  52043
Plan Sets Requested: 9
Quantities
563-382-2933563-864-7602563-880-4584
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1EMBANKMENT-IN-PLACE, CONTRACTOR FURNISHED150C.Y.$12.50$1,875.00 $24.00$3,600.00 $13.00$1,950.00 
2EXCAVATION, CLASS 10, ROADWAY AND BORROW650C.Y.$6.95$4,517.50 $8.00$5,200.00 $6.25$4,062.50 
3EXCAVATION, CLASS 10, UNSUITABLE OR UNSTABLE MATERIAL550C.Y.$6.95$3,822.50 $8.00$4,400.00 $9.00$4,950.00 
4TOPSOIL, STRIP, SALVAGE AND SPREAD175C.Y.$5.00$875.00 $3.00$525.00 $6.00$1,050.00 
5COMPACTION WITH MOISTURE CONTROL770C.Y.$1.50$1,155.00 $4.00$3,080.00 $2.00$1,540.00 
6SPECIAL COMPACTION OF SUBGRADE0.7STA.$6,000.00$4,200.00 $4,000.00$2,800.00 $2,000.00$1,400.00 
7MODIFIED SUBBASE36C.Y.$30.00$1,080.00 $38.00$1,368.00 $42.75$1,539.00 
8STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 3 DURABILITY, 7 IN.185S.Y.$88.50$16,372.50 $87.50$16,187.50 $124.50$23,032.50 
9GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE18Tons$20.00$360.00 $25.00$450.00 $20.70$372.60 
10REMOVAL OF EXISTING BRIDGE1L.S.$7,500.00$7,500.00 $22,000.00$22,000.00 $6,000.00$6,000.00 
11FLOODED BACKFILL184C.Y.$30.00$5,520.00 $8.00$1,472.00 $80.00$14,720.00 
12EXCAVATION, CLASS 201187C.Y.$5.00$5,935.00 $6.40$7,596.80 $10.00$11,870.00 
13GRANULAR MATERIAL FOR BLANKET114C.Y.$23.95$2,730.30 $38.00$4,332.00 $55.00$6,270.00 
14TEMPORARY STREAM DIVERSION1Each$4,000.00$4,000.00 $4,000.00$4,000.00 $4,500.00$4,500.00 
15ENGINEERING FABRIC316S.Y.$3.00$948.00 $2.50$790.00 $3.75$1,185.00 
16REVETMENT, CLASS C166.5Tons$40.00$6,660.00 $38.00$6,327.00 $35.00$5,827.50 
17REVETMENT, CLASS E81.1Tons$40.00$3,244.00 $38.00$3,081.80 $32.00$2,595.20 
18REMOVAL OF PAVEMENT133S.Y.$3.50$465.50 $7.00$931.00 $9.00$1,197.00 
19OBJECT MARKER, TYPE 34Each$600.00$2,400.00 $300.00$1,200.00 $300.00$1,200.00 
20CONSTRUCTION SURVEY1L.S.$4,500.00$4,500.00 $4,700.00$4,700.00 $4,500.00$4,500.00 
21SAFETY CLOSURE1Each$1,000.00$1,000.00 $800.00$800.00 $1,800.00$1,800.00 
22MOBILIZATION1L.S.$11,000.00$11,000.00 $15,000.00$15,000.00 $30,500.00$30,500.00 
23REMOVAL OF ASBESTOS1L.S.$3,500.00$3,500.00 $3,500.00$3,500.00 $5,000.00$5,000.00 
24REINFORCED CONCRETE BOX CULVERT BARREL58L.F.$1,495.00$86,710.00 $1,600.00$92,800.00 $2,118.77$122,888.66 
25REINFORCED CONCRETE BOX CULVERT END SECTION2Each$36,000.00$72,000.00 $48,500.00$97,000.00 $31,706.30$63,412.60 
26EROSION CONTROL1L.S.$1,900.00$1,900.00 $3,500.00$3,500.00 $7,500.00$7,500.00 
27CLEARING AND GRUBBING1L.S.$1,000.00$1,000.00 $2,500.00$2,500.00 $3,000.00$3,000.00 
28SEEDING AND FERTILIZING (RURAL)0.35Acres$3,000.00$1,050.00 $4,000.00$1,400.00 $2,000.00$700.00 
29STABILIZING CROP - SEEDING AND FERTILIZING0.35Acres$3,000.00$1,050.00 $4,000.00$1,400.00 $1,700.00$595.00 
      $257,370.30  $311,941.10  $335,157.56 
 
4
5
6
Estimated Cost: $384,248.00
Contractor: 
Peterson Contractors IncMatt Construction IncShift General Contracting
Funding Source: 100% Park & Institutional Road Fund, 104 Blackhawk St
203 Y Ave
4812 Harvest Ct SW
Reinbeck IA  50669Sumner IA  50674Cedar Rapids IA  52404
Plan Sets Requested: 9
Quantities
319-345-2713563-578-8418319-536-0111
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1EMBANKMENT-IN-PLACE, CONTRACTOR FURNISHED150C.Y.$25.00$3,750.00 $21.00$3,150.00 $20.00$3,000.00 
2EXCAVATION, CLASS 10, ROADWAY AND BORROW650C.Y.$11.00$7,150.00 $18.00$11,700.00 $10.00$6,500.00 
3EXCAVATION, CLASS 10, UNSUITABLE OR UNSTABLE MATERIAL550C.Y.$18.50$10,175.00 $13.50$7,425.00 $20.00$11,000.00 
4TOPSOIL, STRIP, SALVAGE AND SPREAD175C.Y.$15.25$2,668.75 $5.00$875.00 $15.00$2,625.00 
5COMPACTION WITH MOISTURE CONTROL770C.Y.$6.00$4,620.00 $7.50$5,775.00 $5.00$3,850.00 
6SPECIAL COMPACTION OF SUBGRADE0.7STA.$2,000.00$1,400.00 $450.00$315.00 $2,000.00$1,400.00 
7MODIFIED SUBBASE36C.Y.$65.00$2,340.00 $22.50$810.00 $50.00$1,800.00 
8STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 3 DURABILITY, 7 IN.185S.Y.$140.00$25,900.00 $105.00$19,425.00 $80.00$14,800.00 
9GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE18Tons$45.00$810.00 $22.00$396.00 $30.00$540.00 
10REMOVAL OF EXISTING BRIDGE1L.S.$10,250.00$10,250.00 $40,000.00$40,000.00 $20,000.00$20,000.00 
11FLOODED BACKFILL184C.Y.$40.00$7,360.00 $20.00$3,680.00 $60.00$11,040.00 
12EXCAVATION, CLASS 201187C.Y.$11.00$13,057.00 $8.00$9,496.00 $15.00$17,805.00 
13GRANULAR MATERIAL FOR BLANKET114C.Y.$55.75$6,355.50 $30.00$3,420.00 $50.00$5,700.00 
14TEMPORARY STREAM DIVERSION1Each$7,250.00$7,250.00 $4,000.00$4,000.00 $8,000.00$8,000.00 
15ENGINEERING FABRIC316S.Y.$6.00$1,896.00 $3.00$948.00 $2.00$632.00 
16REVETMENT, CLASS C166.5Tons$50.00$8,325.00 $37.00$6,160.50 $40.00$6,660.00 
17REVETMENT, CLASS E81.1Tons$45.00$3,649.50 $32.00$2,595.20 $40.00$3,244.00 
18REMOVAL OF PAVEMENT133S.Y.$20.00$2,660.00 $25.00$3,325.00 $15.00$1,995.00 
19OBJECT MARKER, TYPE 34Each$300.00$1,200.00 $750.00$3,000.00 $500.00$2,000.00 
20CONSTRUCTION SURVEY1L.S.$4,500.00$4,500.00 $4,500.00$4,500.00 $5,000.00$5,000.00 
21SAFETY CLOSURE1Each$750.00$750.00 $1,000.00$1,000.00 $1,000.00$1,000.00 
22MOBILIZATION1L.S.$18,000.00$18,000.00 $63,000.00$63,000.00 $40,000.00$40,000.00 
23REMOVAL OF ASBESTOS1L.S.$4,000.00$4,000.00 $5,500.00$5,500.00 $8,000.00$8,000.00 
24REINFORCED CONCRETE BOX CULVERT BARREL58L.F.$1,625.00$94,250.00 $1,700.00$98,600.00 $2,125.00$123,250.00 
25REINFORCED CONCRETE BOX CULVERT END SECTION2Each$44,650.00$89,300.00 $30,494.00$60,988.00 $33,670.00$67,340.00 
26EROSION CONTROL1L.S.$3,000.00$3,000.00 $5,000.00$5,000.00 $3,500.00$3,500.00 
27CLEARING AND GRUBBING1L.S.$12,800.00$12,800.00 $7,500.00$7,500.00 $8,000.00$8,000.00 
28SEEDING AND FERTILIZING (RURAL)0.35Acres$13,000.00$4,550.00 $5,000.00$1,750.00 $4,500.00$1,575.00 
29STABILIZING CROP - SEEDING AND FERTILIZING0.35Acres$1,000.00$350.00 $2,000.00$700.00 $3,500.00$1,225.00 
      $352,316.75  $375,033.70  $381,481.00 
 
7
8
9
Estimated Cost: $384,248.00
Contractor: 
Ludovissy Enterprises
Funding Source: 100% Park & Institutional Road Fund, 702 S 2nd St


Guttenberg IA  52052    
Plan Sets Requested: 9
Quantities
563-880-4866
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1EMBANKMENT-IN-PLACE, CONTRACTOR FURNISHED150C.Y.$8.00$1,200.00 $0.00 $0.00 
2EXCAVATION, CLASS 10, ROADWAY AND BORROW650C.Y.$8.00$5,200.00 $0.00 $0.00 
3EXCAVATION, CLASS 10, UNSUITABLE OR UNSTABLE MATERIAL550C.Y.$8.00$4,400.00 $0.00 $0.00 
4TOPSOIL, STRIP, SALVAGE AND SPREAD175C.Y.$8.00$1,400.00 $0.00 $0.00 
5COMPACTION WITH MOISTURE CONTROL770C.Y.$8.00$6,160.00 $0.00 $0.00 
6SPECIAL COMPACTION OF SUBGRADE0.7STA.$5,000.00$3,500.00 $0.00 $0.00 
7MODIFIED SUBBASE36C.Y.$100.00$3,600.00 $0.00 $0.00 
8STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 3 DURABILITY, 7 IN.185S.Y.$373.00$69,005.00 $0.00 $0.00 
9GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE18Tons$50.00$900.00 $0.00 $0.00 
10REMOVAL OF EXISTING BRIDGE1L.S.$35,000.00$35,000.00 $0.00 $0.00 
11FLOODED BACKFILL184C.Y.$10.00$1,840.00 $0.00 $0.00 
12EXCAVATION, CLASS 201187C.Y.$8.00$9,496.00 $0.00 $0.00 
13GRANULAR MATERIAL FOR BLANKET114C.Y.$50.00$5,700.00 $0.00 $0.00 
14TEMPORARY STREAM DIVERSION1Each$10,160.00$10,160.00 $0.00 $0.00 
15ENGINEERING FABRIC316S.Y.$15.00$4,740.00 $0.00 $0.00 
16REVETMENT, CLASS C166.5Tons$50.00$8,325.00 $0.00 $0.00 
17REVETMENT, CLASS E81.1Tons$50.00$4,055.00 $0.00 $0.00 
18REMOVAL OF PAVEMENT133S.Y.$150.00$19,950.00 $0.00 $0.00 
19OBJECT MARKER, TYPE 34Each$450.00$1,800.00 $0.00 $0.00 
20CONSTRUCTION SURVEY1L.S.$17,000.00$17,000.00 $0.00 $0.00 
21SAFETY CLOSURE1Each$5,000.00$5,000.00 $0.00 $0.00 
22MOBILIZATION1L.S.$22,000.00$22,000.00 $0.00 $0.00 
23REMOVAL OF ASBESTOS1L.S.$7,300.00$7,300.00 $0.00 $0.00 
24REINFORCED CONCRETE BOX CULVERT BARREL58L.F.$2,242.00$130,036.00 $0.00 $0.00 
25REINFORCED CONCRETE BOX CULVERT END SECTION2Each$15,000.00$30,000.00 $0.00 $0.00 
26EROSION CONTROL1L.S.$10,000.00$10,000.00 $0.00 $0.00 
27CLEARING AND GRUBBING1L.S.$5,000.00$5,000.00 $0.00 $0.00 
28SEEDING AND FERTILIZING (RURAL)0.35Acres$5,000.00$1,750.00 $0.00 $0.00 
29STABILIZING CROP - SEEDING AND FERTILIZING0.35Acres$5,000.00$1,750.00 $0.00 $0.00 
      $426,267.00  $0.00  $0.00 
 



 

12/21/2024