IOWA DEPARTMENT OF NATURAL RESOURCES |
|
Bids For: | Location: | Volga River Recreation Area | Date: 12/12/2024 | Project No. |
Hill Road Bridge Replacement | County: | FAYETTE | Time: 11:00 a.m. | 23-03-33-01 |
1 | 2 | 3 | |||||||||||
Estimated Cost: $384,248.00 | Contractor: | Skyline Construction Inc | Bacon Concrete LLC | K-Construction Inc | |||||||||
Funding Source: 100% Park & Institutional Road Fund, | 900 Montgomery St | 370 N Bancroft St | PO Box 280 | ||||||||||
Decorah IA 52101 | Postville IA 52162 | Elkader IA 52043 | |||||||||||
Plan Sets Requested: 9 | Quantities | 563-382-2933 | 563-864-7602 | 563-880-4584 | |||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | EMBANKMENT-IN-PLACE, CONTRACTOR FURNISHED | 150 | C.Y. | $12.50 | $1,875.00 | $24.00 | $3,600.00 | $13.00 | $1,950.00 | ||||
2 | EXCAVATION, CLASS 10, ROADWAY AND BORROW | 650 | C.Y. | $6.95 | $4,517.50 | $8.00 | $5,200.00 | $6.25 | $4,062.50 | ||||
3 | EXCAVATION, CLASS 10, UNSUITABLE OR UNSTABLE MATERIAL | 550 | C.Y. | $6.95 | $3,822.50 | $8.00 | $4,400.00 | $9.00 | $4,950.00 | ||||
4 | TOPSOIL, STRIP, SALVAGE AND SPREAD | 175 | C.Y. | $5.00 | $875.00 | $3.00 | $525.00 | $6.00 | $1,050.00 | ||||
5 | COMPACTION WITH MOISTURE CONTROL | 770 | C.Y. | $1.50 | $1,155.00 | $4.00 | $3,080.00 | $2.00 | $1,540.00 | ||||
6 | SPECIAL COMPACTION OF SUBGRADE | 0.7 | STA. | $6,000.00 | $4,200.00 | $4,000.00 | $2,800.00 | $2,000.00 | $1,400.00 | ||||
7 | MODIFIED SUBBASE | 36 | C.Y. | $30.00 | $1,080.00 | $38.00 | $1,368.00 | $42.75 | $1,539.00 | ||||
8 | STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 3 DURABILITY, 7 IN. | 185 | S.Y. | $88.50 | $16,372.50 | $87.50 | $16,187.50 | $124.50 | $23,032.50 | ||||
9 | GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE | 18 | Tons | $20.00 | $360.00 | $25.00 | $450.00 | $20.70 | $372.60 | ||||
10 | REMOVAL OF EXISTING BRIDGE | 1 | L.S. | $7,500.00 | $7,500.00 | $22,000.00 | $22,000.00 | $6,000.00 | $6,000.00 | ||||
11 | FLOODED BACKFILL | 184 | C.Y. | $30.00 | $5,520.00 | $8.00 | $1,472.00 | $80.00 | $14,720.00 | ||||
12 | EXCAVATION, CLASS 20 | 1187 | C.Y. | $5.00 | $5,935.00 | $6.40 | $7,596.80 | $10.00 | $11,870.00 | ||||
13 | GRANULAR MATERIAL FOR BLANKET | 114 | C.Y. | $23.95 | $2,730.30 | $38.00 | $4,332.00 | $55.00 | $6,270.00 | ||||
14 | TEMPORARY STREAM DIVERSION | 1 | Each | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,500.00 | $4,500.00 | ||||
15 | ENGINEERING FABRIC | 316 | S.Y. | $3.00 | $948.00 | $2.50 | $790.00 | $3.75 | $1,185.00 | ||||
16 | REVETMENT, CLASS C | 166.5 | Tons | $40.00 | $6,660.00 | $38.00 | $6,327.00 | $35.00 | $5,827.50 | ||||
17 | REVETMENT, CLASS E | 81.1 | Tons | $40.00 | $3,244.00 | $38.00 | $3,081.80 | $32.00 | $2,595.20 | ||||
18 | REMOVAL OF PAVEMENT | 133 | S.Y. | $3.50 | $465.50 | $7.00 | $931.00 | $9.00 | $1,197.00 | ||||
19 | OBJECT MARKER, TYPE 3 | 4 | Each | $600.00 | $2,400.00 | $300.00 | $1,200.00 | $300.00 | $1,200.00 | ||||
20 | CONSTRUCTION SURVEY | 1 | L.S. | $4,500.00 | $4,500.00 | $4,700.00 | $4,700.00 | $4,500.00 | $4,500.00 | ||||
21 | SAFETY CLOSURE | 1 | Each | $1,000.00 | $1,000.00 | $800.00 | $800.00 | $1,800.00 | $1,800.00 | ||||
22 | MOBILIZATION | 1 | L.S. | $11,000.00 | $11,000.00 | $15,000.00 | $15,000.00 | $30,500.00 | $30,500.00 | ||||
23 | REMOVAL OF ASBESTOS | 1 | L.S. | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $5,000.00 | $5,000.00 | ||||
24 | REINFORCED CONCRETE BOX CULVERT BARREL | 58 | L.F. | $1,495.00 | $86,710.00 | $1,600.00 | $92,800.00 | $2,118.77 | $122,888.66 | ||||
25 | REINFORCED CONCRETE BOX CULVERT END SECTION | 2 | Each | $36,000.00 | $72,000.00 | $48,500.00 | $97,000.00 | $31,706.30 | $63,412.60 | ||||
26 | EROSION CONTROL | 1 | L.S. | $1,900.00 | $1,900.00 | $3,500.00 | $3,500.00 | $7,500.00 | $7,500.00 | ||||
27 | CLEARING AND GRUBBING | 1 | L.S. | $1,000.00 | $1,000.00 | $2,500.00 | $2,500.00 | $3,000.00 | $3,000.00 | ||||
28 | SEEDING AND FERTILIZING (RURAL) | 0.35 | Acres | $3,000.00 | $1,050.00 | $4,000.00 | $1,400.00 | $2,000.00 | $700.00 | ||||
29 | STABILIZING CROP - SEEDING AND FERTILIZING | 0.35 | Acres | $3,000.00 | $1,050.00 | $4,000.00 | $1,400.00 | $1,700.00 | $595.00 | ||||
$257,370.30 | $311,941.10 | $335,157.56 | |||||||||||
4 | 5 | 6 | |||||||||||
Estimated Cost: $384,248.00 | Contractor: | Peterson Contractors Inc | Matt Construction Inc | Shift General Contracting | |||||||||
Funding Source: 100% Park & Institutional Road Fund, | 104 Blackhawk St | 203 Y Ave | 4812 Harvest Ct SW | ||||||||||
Reinbeck IA 50669 | Sumner IA 50674 | Cedar Rapids IA 52404 | |||||||||||
Plan Sets Requested: 9 | Quantities | 319-345-2713 | 563-578-8418 | 319-536-0111 | |||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | EMBANKMENT-IN-PLACE, CONTRACTOR FURNISHED | 150 | C.Y. | $25.00 | $3,750.00 | $21.00 | $3,150.00 | $20.00 | $3,000.00 | ||||
2 | EXCAVATION, CLASS 10, ROADWAY AND BORROW | 650 | C.Y. | $11.00 | $7,150.00 | $18.00 | $11,700.00 | $10.00 | $6,500.00 | ||||
3 | EXCAVATION, CLASS 10, UNSUITABLE OR UNSTABLE MATERIAL | 550 | C.Y. | $18.50 | $10,175.00 | $13.50 | $7,425.00 | $20.00 | $11,000.00 | ||||
4 | TOPSOIL, STRIP, SALVAGE AND SPREAD | 175 | C.Y. | $15.25 | $2,668.75 | $5.00 | $875.00 | $15.00 | $2,625.00 | ||||
5 | COMPACTION WITH MOISTURE CONTROL | 770 | C.Y. | $6.00 | $4,620.00 | $7.50 | $5,775.00 | $5.00 | $3,850.00 | ||||
6 | SPECIAL COMPACTION OF SUBGRADE | 0.7 | STA. | $2,000.00 | $1,400.00 | $450.00 | $315.00 | $2,000.00 | $1,400.00 | ||||
7 | MODIFIED SUBBASE | 36 | C.Y. | $65.00 | $2,340.00 | $22.50 | $810.00 | $50.00 | $1,800.00 | ||||
8 | STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 3 DURABILITY, 7 IN. | 185 | S.Y. | $140.00 | $25,900.00 | $105.00 | $19,425.00 | $80.00 | $14,800.00 | ||||
9 | GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE | 18 | Tons | $45.00 | $810.00 | $22.00 | $396.00 | $30.00 | $540.00 | ||||
10 | REMOVAL OF EXISTING BRIDGE | 1 | L.S. | $10,250.00 | $10,250.00 | $40,000.00 | $40,000.00 | $20,000.00 | $20,000.00 | ||||
11 | FLOODED BACKFILL | 184 | C.Y. | $40.00 | $7,360.00 | $20.00 | $3,680.00 | $60.00 | $11,040.00 | ||||
12 | EXCAVATION, CLASS 20 | 1187 | C.Y. | $11.00 | $13,057.00 | $8.00 | $9,496.00 | $15.00 | $17,805.00 | ||||
13 | GRANULAR MATERIAL FOR BLANKET | 114 | C.Y. | $55.75 | $6,355.50 | $30.00 | $3,420.00 | $50.00 | $5,700.00 | ||||
14 | TEMPORARY STREAM DIVERSION | 1 | Each | $7,250.00 | $7,250.00 | $4,000.00 | $4,000.00 | $8,000.00 | $8,000.00 | ||||
15 | ENGINEERING FABRIC | 316 | S.Y. | $6.00 | $1,896.00 | $3.00 | $948.00 | $2.00 | $632.00 | ||||
16 | REVETMENT, CLASS C | 166.5 | Tons | $50.00 | $8,325.00 | $37.00 | $6,160.50 | $40.00 | $6,660.00 | ||||
17 | REVETMENT, CLASS E | 81.1 | Tons | $45.00 | $3,649.50 | $32.00 | $2,595.20 | $40.00 | $3,244.00 | ||||
18 | REMOVAL OF PAVEMENT | 133 | S.Y. | $20.00 | $2,660.00 | $25.00 | $3,325.00 | $15.00 | $1,995.00 | ||||
19 | OBJECT MARKER, TYPE 3 | 4 | Each | $300.00 | $1,200.00 | $750.00 | $3,000.00 | $500.00 | $2,000.00 | ||||
20 | CONSTRUCTION SURVEY | 1 | L.S. | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 | $5,000.00 | $5,000.00 | ||||
21 | SAFETY CLOSURE | 1 | Each | $750.00 | $750.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | ||||
22 | MOBILIZATION | 1 | L.S. | $18,000.00 | $18,000.00 | $63,000.00 | $63,000.00 | $40,000.00 | $40,000.00 | ||||
23 | REMOVAL OF ASBESTOS | 1 | L.S. | $4,000.00 | $4,000.00 | $5,500.00 | $5,500.00 | $8,000.00 | $8,000.00 | ||||
24 | REINFORCED CONCRETE BOX CULVERT BARREL | 58 | L.F. | $1,625.00 | $94,250.00 | $1,700.00 | $98,600.00 | $2,125.00 | $123,250.00 | ||||
25 | REINFORCED CONCRETE BOX CULVERT END SECTION | 2 | Each | $44,650.00 | $89,300.00 | $30,494.00 | $60,988.00 | $33,670.00 | $67,340.00 | ||||
26 | EROSION CONTROL | 1 | L.S. | $3,000.00 | $3,000.00 | $5,000.00 | $5,000.00 | $3,500.00 | $3,500.00 | ||||
27 | CLEARING AND GRUBBING | 1 | L.S. | $12,800.00 | $12,800.00 | $7,500.00 | $7,500.00 | $8,000.00 | $8,000.00 | ||||
28 | SEEDING AND FERTILIZING (RURAL) | 0.35 | Acres | $13,000.00 | $4,550.00 | $5,000.00 | $1,750.00 | $4,500.00 | $1,575.00 | ||||
29 | STABILIZING CROP - SEEDING AND FERTILIZING | 0.35 | Acres | $1,000.00 | $350.00 | $2,000.00 | $700.00 | $3,500.00 | $1,225.00 | ||||
$352,316.75 | $375,033.70 | $381,481.00 | |||||||||||
7 | 8 | 9 | |||||||||||
Estimated Cost: $384,248.00 | Contractor: | Ludovissy Enterprises | |||||||||||
Funding Source: 100% Park & Institutional Road Fund, | 702 S 2nd St | ||||||||||||
Guttenberg IA 52052 | |||||||||||||
Plan Sets Requested: 9 | Quantities | 563-880-4866 | |||||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | EMBANKMENT-IN-PLACE, CONTRACTOR FURNISHED | 150 | C.Y. | $8.00 | $1,200.00 | $0.00 | $0.00 | ||||||
2 | EXCAVATION, CLASS 10, ROADWAY AND BORROW | 650 | C.Y. | $8.00 | $5,200.00 | $0.00 | $0.00 | ||||||
3 | EXCAVATION, CLASS 10, UNSUITABLE OR UNSTABLE MATERIAL | 550 | C.Y. | $8.00 | $4,400.00 | $0.00 | $0.00 | ||||||
4 | TOPSOIL, STRIP, SALVAGE AND SPREAD | 175 | C.Y. | $8.00 | $1,400.00 | $0.00 | $0.00 | ||||||
5 | COMPACTION WITH MOISTURE CONTROL | 770 | C.Y. | $8.00 | $6,160.00 | $0.00 | $0.00 | ||||||
6 | SPECIAL COMPACTION OF SUBGRADE | 0.7 | STA. | $5,000.00 | $3,500.00 | $0.00 | $0.00 | ||||||
7 | MODIFIED SUBBASE | 36 | C.Y. | $100.00 | $3,600.00 | $0.00 | $0.00 | ||||||
8 | STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 3 DURABILITY, 7 IN. | 185 | S.Y. | $373.00 | $69,005.00 | $0.00 | $0.00 | ||||||
9 | GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE | 18 | Tons | $50.00 | $900.00 | $0.00 | $0.00 | ||||||
10 | REMOVAL OF EXISTING BRIDGE | 1 | L.S. | $35,000.00 | $35,000.00 | $0.00 | $0.00 | ||||||
11 | FLOODED BACKFILL | 184 | C.Y. | $10.00 | $1,840.00 | $0.00 | $0.00 | ||||||
12 | EXCAVATION, CLASS 20 | 1187 | C.Y. | $8.00 | $9,496.00 | $0.00 | $0.00 | ||||||
13 | GRANULAR MATERIAL FOR BLANKET | 114 | C.Y. | $50.00 | $5,700.00 | $0.00 | $0.00 | ||||||
14 | TEMPORARY STREAM DIVERSION | 1 | Each | $10,160.00 | $10,160.00 | $0.00 | $0.00 | ||||||
15 | ENGINEERING FABRIC | 316 | S.Y. | $15.00 | $4,740.00 | $0.00 | $0.00 | ||||||
16 | REVETMENT, CLASS C | 166.5 | Tons | $50.00 | $8,325.00 | $0.00 | $0.00 | ||||||
17 | REVETMENT, CLASS E | 81.1 | Tons | $50.00 | $4,055.00 | $0.00 | $0.00 | ||||||
18 | REMOVAL OF PAVEMENT | 133 | S.Y. | $150.00 | $19,950.00 | $0.00 | $0.00 | ||||||
19 | OBJECT MARKER, TYPE 3 | 4 | Each | $450.00 | $1,800.00 | $0.00 | $0.00 | ||||||
20 | CONSTRUCTION SURVEY | 1 | L.S. | $17,000.00 | $17,000.00 | $0.00 | $0.00 | ||||||
21 | SAFETY CLOSURE | 1 | Each | $5,000.00 | $5,000.00 | $0.00 | $0.00 | ||||||
22 | MOBILIZATION | 1 | L.S. | $22,000.00 | $22,000.00 | $0.00 | $0.00 | ||||||
23 | REMOVAL OF ASBESTOS | 1 | L.S. | $7,300.00 | $7,300.00 | $0.00 | $0.00 | ||||||
24 | REINFORCED CONCRETE BOX CULVERT BARREL | 58 | L.F. | $2,242.00 | $130,036.00 | $0.00 | $0.00 | ||||||
25 | REINFORCED CONCRETE BOX CULVERT END SECTION | 2 | Each | $15,000.00 | $30,000.00 | $0.00 | $0.00 | ||||||
26 | EROSION CONTROL | 1 | L.S. | $10,000.00 | $10,000.00 | $0.00 | $0.00 | ||||||
27 | CLEARING AND GRUBBING | 1 | L.S. | $5,000.00 | $5,000.00 | $0.00 | $0.00 | ||||||
28 | SEEDING AND FERTILIZING (RURAL) | 0.35 | Acres | $5,000.00 | $1,750.00 | $0.00 | $0.00 | ||||||
29 | STABILIZING CROP - SEEDING AND FERTILIZING | 0.35 | Acres | $5,000.00 | $1,750.00 | $0.00 | $0.00 | ||||||
$426,267.00 | $0.00 | $0.00 | |||||||||||
12/21/2024