IOWA DEPARTMENT OF NATURAL RESOURCES |
|
Bids For: | Location: | Pikes Peak | Date: 2/17/2022 | Project No. |
Campground Upgrade Project | County: | CLAYTON | Time: 11:00 a.m. | 21-03-22-01 |
![]() | 1 | 2 | 3 | ![]() | |||||||||
Estimated Cost: $2,200,000.00 | Contractor: | ![]() | Midwest Concrete Inc. | Wicks Construction Co | Eastern Iowa Excavating & Concrete LLC | ![]() | |||||||
Funding Source: 27% Infrastructure, 73% Park & Institutional Road Fund, | ![]() | 9835 Midwest Lane | ![]() | 2201 State Hwy 9 PO Box 428 | ![]() | 121 Nixon St SE PO Box 189 | ![]() | ||||||
![]() | Peosta IA 52068 | ![]() | Decorah IA 52101 | ![]() | Cascade IA 52033 | ![]() | |||||||
Plan Sets Requested: 0 | Quantities | ![]() | 563-845-0947 | ![]() | 563-382-2325 | ![]() | 563-852-5120 | ![]() | |||||
No. | Description: | No. | Unit | ![]() | Unit Price | Amount | ![]() | Unit Price | Amount | ![]() | Unit Price | Amount | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
1 | Clearing and Grubbing | 1 | L.S. | ![]() | $15,000.00 | $15,000.00 | ![]() | $20,000.00 | $20,000.00 | ![]() | $27,000.00 | $27,000.00 | ![]() |
2 | Tree Clearing/Stump Grinding | 1 | L.S. | ![]() | $8,000.00 | $8,000.00 | ![]() | $7,500.00 | $7,500.00 | ![]() | $31,500.00 | $31,500.00 | ![]() |
3 | Full Depth Saw Cut | 325 | L.F. | ![]() | $2.89 | $939.25 | ![]() | $4.00 | $1,300.00 | ![]() | $4.25 | $1,381.25 | ![]() |
4 | HMA Pavement Removal | 12800 | S.Y. | ![]() | $2.00 | $25,600.00 | ![]() | $3.75 | $48,000.00 | ![]() | $1.80 | $23,040.00 | ![]() |
5 | PCC Removal | 529.4 | S.Y. | ![]() | $8.00 | $4,235.20 | ![]() | $11.50 | $6,088.10 | ![]() | $9.50 | $5,029.30 | ![]() |
6 | Grading | 1 | L.S. | ![]() | $33,312.50 | $33,312.50 | ![]() | $42,500.00 | $42,500.00 | ![]() | $185,000.00 | $185,000.00 | ![]() |
7 | 12-inch Filter Sock | 3160 | L.F. | ![]() | $2.58 | $8,152.80 | ![]() | $4.00 | $12,640.00 | ![]() | $3.50 | $11,060.00 | ![]() |
8 | Sanitary Sewer Connections to Existing Manhole | 2 | Each | ![]() | $1,846.68 | $3,693.36 | ![]() | $750.00 | $1,500.00 | ![]() | $1,000.00 | $2,000.00 | ![]() |
9 | Type SW-301 48" Diameter Sanitary Manhole w/Type 'A' Casting | 1 | Each | ![]() | $2,883.68 | $2,883.68 | ![]() | $12,500.00 | $12,500.00 | ![]() | $3,600.00 | $3,600.00 | ![]() |
10 | 6-inch Sanitary Sewer (PVC SDR 23.5) | 228 | L.F. | ![]() | $52.82 | $12,042.96 | ![]() | $67.50 | $15,390.00 | ![]() | $44.00 | $10,032.00 | ![]() |
11 | 4-inch Sanitary Sewer Service (PVC SDR 23.5) | 242 | L.F. | ![]() | $65.79 | $15,921.18 | ![]() | $62.50 | $15,125.00 | ![]() | $37.00 | $8,954.00 | ![]() |
12 | Disposal Station RV Cleanout Connection | 2 | Each | ![]() | $2,022.86 | $4,045.72 | ![]() | $1,500.00 | $3,000.00 | ![]() | $820.00 | $1,640.00 | ![]() |
13 | RV Sanitary Sewer Cleanout Connection | 6 | Each | ![]() | $1,482.91 | $8,897.46 | ![]() | $1,500.00 | $9,000.00 | ![]() | $840.00 | $5,040.00 | ![]() |
14 | 6"x4" PVC Schedule 40 Service Wye | 6 | Each | ![]() | $1,260.15 | $7,560.90 | ![]() | $1,000.00 | $6,000.00 | ![]() | $88.00 | $528.00 | ![]() |
15 | 2"x2"x2"x2" HDPE Cross | 1 | Each | ![]() | $732.04 | $732.04 | ![]() | $150.00 | $150.00 | ![]() | $92.00 | $92.00 | ![]() |
16 | 1-inch HDPE Pipe | 1128 | L.F. | ![]() | $31.68 | $35,735.04 | ![]() | $27.50 | $31,020.00 | ![]() | $13.00 | $14,664.00 | ![]() |
17 | 2-inch HDPE Pipe | 1195 | L.F. | ![]() | $33.14 | $39,602.30 | ![]() | $32.50 | $38,837.50 | ![]() | $15.00 | $17,925.00 | ![]() |
18 | 2-Inch Valve | 3 | Each | ![]() | $1,667.19 | $5,001.57 | ![]() | $1,250.00 | $3,750.00 | ![]() | $895.00 | $2,685.00 | ![]() |
19 | Woodford Model S-3 Sanitary Yard Hydrant w/Drain Down Pit (or Approved Equal) | 16 | Each | ![]() | $2,742.09 | $43,873.44 | ![]() | $2,000.00 | $32,000.00 | ![]() | $2,605.00 | $41,680.00 | ![]() |
20 | Woodford Model S-3 Sanitary Yard Hydrant w/o Drain Down Pit (or Approved Equal) | 2 | Each | ![]() | $2,610.70 | $5,221.40 | ![]() | $2,000.00 | $4,000.00 | ![]() | $1,921.00 | $3,842.00 | ![]() |
21 | Woodford Model S-4H ADA Sanitary Yard Hydrant w/Drain Down Pit (or Approved Equal) | 2 | Each | ![]() | $2,748.60 | $5,497.20 | ![]() | $2,000.00 | $4,000.00 | ![]() | $2,420.00 | $4,840.00 | ![]() |
22 | Woodford Model S-4H ADA Sanitary Yard Hydrant w/o Drain Down Pit (or Approved Equal) | 2 | Each | ![]() | $2,610.70 | $5,221.40 | ![]() | $2,000.00 | $4,000.00 | ![]() | $1,921.00 | $3,842.00 | ![]() |
23 | 1"x1"x1" HDPE Tee | 2 | Each | ![]() | $565.57 | $1,131.14 | ![]() | $100.00 | $200.00 | ![]() | $14.50 | $29.00 | ![]() |
24 | 2"x2"x1" HDPE Tee | 14 | Each | ![]() | $571.25 | $7,997.50 | ![]() | $120.00 | $1,680.00 | ![]() | $43.00 | $602.00 | ![]() |
25 | 2"x2"x2" HDPE Tee | 3 | Each | ![]() | $570.37 | $1,711.11 | ![]() | $150.00 | $450.00 | ![]() | $30.00 | $90.00 | ![]() |
26 | 2"x1" HDPE Reducer | 5 | Each | ![]() | $568.04 | $2,840.20 | ![]() | $150.00 | $750.00 | ![]() | $13.00 | $65.00 | ![]() |
27 | WellXTrol Model WX-452C Pressure Tanks (or Approved Equal) | 2 | Each | ![]() | $8,240.00 | $16,480.00 | ![]() | $19,500.00 | $39,000.00 | ![]() | $8,555.00 | $17,110.00 | ![]() |
28 | Pressure Tank Installation and Removal of 2 Old Tanks | 1 | L.S. | ![]() | $17,270.62 | $17,270.62 | ![]() | $1,500.00 | $1,500.00 | ![]() | $1,200.00 | $1,200.00 | ![]() |
29 | Water Connection | 2 | Each | ![]() | $1,758.47 | $3,516.94 | ![]() | $1,000.00 | $2,000.00 | ![]() | $1,800.00 | $3,600.00 | ![]() |
30 | Disinfection | 1 | L.S. | ![]() | $1,250.00 | $1,250.00 | ![]() | $1,000.00 | $1,000.00 | ![]() | $1,800.00 | $1,800.00 | ![]() |
31 | Type SW-512 Circular Area Intake W/Type 3A Casting | 8 | Each | ![]() | $2,179.61 | $17,436.88 | ![]() | $3,000.00 | $24,000.00 | ![]() | $1,669.00 | $13,352.00 | ![]() |
32 | Type SW-513 open Sided Area Intake W/Type G Casting | 4 | Each | ![]() | $1,483.18 | $5,932.72 | ![]() | $3,750.00 | $15,000.00 | ![]() | $2,807.00 | $11,228.00 | ![]() |
33 | 12-inch RCP Class III | 505.7 | L.F. | ![]() | $56.60 | $28,622.62 | ![]() | $72.00 | $36,410.40 | ![]() | $50.00 | $25,285.00 | ![]() |
34 | 15-inch RCP Class III | 415.4 | L.F. | ![]() | $60.53 | $25,144.162 | ![]() | $75.00 | $31,155.00 | ![]() | $55.00 | $22,847.00 | ![]() |
35 | 12-inch RCP Class III FES | 1 | Each | ![]() | $2,213.00 | $2,213.00 | ![]() | $1,475.00 | $1,475.00 | ![]() | $815.00 | $815.00 | ![]() |
36 | 15-inch RCP Class III FES | 1 | Each | ![]() | $2,296.17 | $2,296.17 | ![]() | $1,575.00 | $1,575.00 | ![]() | $900.00 | $900.00 | ![]() |
37 | Class 'D' Riprap | 100 | Tons | ![]() | $36.08 | $3,608.00 | ![]() | $27.50 | $2,750.00 | ![]() | $24.00 | $2,400.00 | ![]() |
38 | Primary Electric Service To Distribution Panels | 1 | L.S. | ![]() | $33,856.10 | $33,856.10 | ![]() | $32,870.00 | $32,870.00 | ![]() | $510.00 | $510.00 | ![]() |
39 | Single Campsite Outlet Post-30 Amp | 1 | Each | ![]() | $391.28 | $391.28 | ![]() | $379.88 | $379.88 | ![]() | $510.00 | $510.00 | ![]() |
40 | Single Campsite Outlet Post-50 Amp | 60 | Each | ![]() | $391.28 | $23,476.80 | ![]() | $379.88 | $22,792.80 | ![]() | $612.00 | $36,720.00 | ![]() |
41 | No. 2 AWG Grounding Conductor Cable, Type THW or USE | 4359 | L.F. | ![]() | $3.15 | $13,730.85 | ![]() | $3.05 | $13,294.95 | ![]() | $4.11 | $17,915.49 | ![]() |
42 | No. 4 AWG Grounding Conductor Cable, Type THW or USE | 822 | L.F. | ![]() | $2.02 | $1,660.44 | ![]() | $1.96 | $1,611.12 | ![]() | $2.65 | $2,178.30 | ![]() |
43 | No. 350 MCM Single Conductor Cable, Type USE | 837 | L.F. | ![]() | $12.34 | $10,328.58 | ![]() | $11.98 | $10,027.26 | ![]() | $16.15 | $13,517.55 | ![]() |
44 | No. 300 MCM Single Conductor Cable, Type USE | 1386 | L.F. | ![]() | $10.39 | $14,400.54 | ![]() | $10.00 | $13,860.00 | ![]() | $13.38 | $18,544.68 | ![]() |
45 | No. 250 MCM Single Conductor Cable, Type USE | 2640 | L.F. | ![]() | $9.10 | $24,024.00 | ![]() | $8.83 | $23,311.20 | ![]() | $11.80 | $31,152.00 | ![]() |
46 | No. 4/0 AWG Single Conductor Cable, Type USE | 8214 | L.F. | ![]() | $8.47 | $69,572.58 | ![]() | $8.22 | $67,519.08 | ![]() | $10.76 | $88,382.64 | ![]() |
47 | No. 3/0 AWG Single Conductor Cable, Type USE | 1656 | L.F. | ![]() | $6.78 | $11,227.68 | ![]() | $6.58 | $10,896.48 | ![]() | $8.75 | $14,490.00 | ![]() |
48 | No. 2/0 AWG Single Conductor Cable, Type USE | 810 | L.F. | ![]() | $5.42 | $4,390.20 | ![]() | $5.26 | $4,260.60 | ![]() | $7.00 | $5,670.00 | ![]() |
49 | Roadway Crossing 3-Inch Conduit-Schedule 80 PVC | 90 | L.F. | ![]() | $12.22 | $1,099.80 | ![]() | $11.86 | $1,067.40 | ![]() | $24.00 | $2,160.00 | ![]() |
50 | Roadway Crossing 2.5-inch Conduit-Schedule 80 PVC | 290 | L.F. | ![]() | $10.37 | $3,007.30 | ![]() | $10.06 | $2,917.40 | ![]() | $22.00 | $6,380.00 | ![]() |
51 | Roadway Crossing 2-inch Conduit-Schedule 80 PVC | 25 | L.F. | ![]() | $8.20 | $205.00 | ![]() | $7.96 | $199.00 | ![]() | $20.00 | $500.00 | ![]() |
52 | Detectable Warning Tape, 3" Electric | 4116 | L.F. | ![]() | $0.15 | $617.40 | ![]() | $0.14 | $576.24 | ![]() | $0.15 | $617.40 | ![]() |
53 | Trench, Single Circuit Secondary | 4521 | L.F. | ![]() | $11.40 | $51,539.40 | ![]() | $11.06 | $50,002.26 | ![]() | $9.50 | $42,949.50 | ![]() |
54 | 200 Amp Circuit Breaker | 9 | Each | ![]() | $400.79 | $3,607.11 | ![]() | $389.11 | $3,501.99 | ![]() | $420.00 | $3,780.00 | ![]() |
55 | 175 Amp Circuit Breaker | 1 | Each | ![]() | $1,174.20 | $1,174.20 | ![]() | $1,140.00 | $1,140.00 | ![]() | $420.00 | $420.00 | ![]() |
56 | 150 Amp Circuit Breaker | 1 | Each | ![]() | $309.00 | $309.00 | ![]() | $300.00 | $300.00 | ![]() | $420.00 | $420.00 | ![]() |
57 | 600 Amp Distribution Panel | 1 | Each | ![]() | $6,798.00 | $6,798.00 | ![]() | $6,600.00 | $6,600.00 | ![]() | $21,033.00 | $21,033.00 | ![]() |
58 | 400 Amp Distribution Panel | 1 | Each | ![]() | $5,562.00 | $5,562.00 | ![]() | $5,400.00 | $5,400.00 | ![]() | $14,983.00 | $14,983.00 | ![]() |
59 | Electrical Connection To Check-in Kiosk and LED Light | 1 | L.S. | ![]() | $1,891.20 | $1,891.20 | ![]() | $1,836.11 | $1,836.11 | ![]() | $2,139.00 | $2,139.00 | ![]() |
60 | Special Backfill/Granular Base | 4658.3 | Tons | ![]() | $14.44 | $67,265.852 | ![]() | $15.15 | $70,573.245 | ![]() | $16.50 | $76,861.95 | ![]() |
61 | 6-inch Non-Reinforced PCC | 3625.3 | S.Y. | ![]() | $37.00 | $134,136.10 | ![]() | $40.95 | $148,456.035 | ![]() | $35.25 | $127,791.825 | ![]() |
62 | 7-inch Nylon Reinforced PCC | 10747.3 | S.Y. | ![]() | $40.00 | $429,892.00 | ![]() | $51.60 | $554,560.68 | ![]() | $47.95 | $515,333.035 | ![]() |
63 | Disposal Station Island Pavement | 2 | Each | ![]() | $5,589.00 | $11,178.00 | ![]() | $3,500.00 | $7,000.00 | ![]() | $3,575.00 | $7,150.00 | ![]() |
64 | Granular Base-Sidewalks | 32.1 | Tons | ![]() | $25.31 | $812.451 | ![]() | $27.50 | $882.75 | ![]() | $25.25 | $810.525 | ![]() |
65 | 5-inch Non-Reinforced PCC Sidewalks | 160.4 | S.Y. | ![]() | $51.00 | $8,180.40 | ![]() | $62.00 | $9,944.80 | ![]() | $41.65 | $6,680.66 | ![]() |
66 | Engineering Fabric | 7770 | S.Y. | ![]() | $1.15 | $8,935.50 | ![]() | $3.00 | $23,310.00 | ![]() | $2.25 | $17,482.50 | ![]() |
67 | Macadam Stone | 1515 | Tons | ![]() | $17.39 | $26,345.85 | ![]() | $18.50 | $28,027.50 | ![]() | $29.00 | $43,935.00 | ![]() |
68 | Class 'A' Crushed Stone | 1129 | Tons | ![]() | $16.71 | $18,865.59 | ![]() | $19.50 | $22,015.50 | ![]() | $29.00 | $32,741.00 | ![]() |
69 | 4'x4'x5.5" Reinforced PCC Fire Ring | 60 | Each | ![]() | $500.00 | $30,000.00 | ![]() | $600.00 | $36,000.00 | ![]() | $275.00 | $16,500.00 | ![]() |
70 | Traffic Control | 1 | L.S. | ![]() | $2,575.00 | $2,575.00 | ![]() | $1,000.00 | $1,000.00 | ![]() | $2,850.00 | $2,850.00 | ![]() |
71 | Seeding, Fertilizing and Mulching | 5 | Acres | ![]() | $4,120.00 | $20,600.00 | ![]() | $3,400.00 | $17,000.00 | ![]() | $4,100.00 | $20,500.00 | ![]() |
72 | Street Signage | 1 | L.S. | ![]() | $3,502.00 | $3,502.00 | ![]() | $2,805.00 | $2,805.00 | ![]() | $2,265.00 | $2,265.00 | ![]() |
73 | Handicap Parking Signage | 1 | L.S. | ![]() | $1,442.00 | $1,442.00 | ![]() | $2,040.00 | $2,040.00 | ![]() | $1,028.00 | $1,028.00 | ![]() |
74 | Street Pavement Markings | 1 | L.S. | ![]() | $3,862.50 | $3,862.50 | ![]() | $1,835.00 | $1,835.00 | ![]() | $1,950.00 | $1,950.00 | ![]() |
75 | Parking Space Pavement Striping, Handicap Parking Cross Hatch Markings | 1 | L.S. | ![]() | $3,862.50 | $3,862.50 | ![]() | $3,295.00 | $3,295.00 | ![]() | $3,500.00 | $3,500.00 | ![]() |
76 | 6' Concrete Parking Wheel Stops | 27 | Each | ![]() | $188.64 | $5,093.28 | ![]() | $135.00 | $3,645.00 | ![]() | $86.00 | $2,322.00 | ![]() |
77 | 8' Concrete Parking Wheel Stops | 13 | Each | ![]() | $214.66 | $2,790.58 | ![]() | $135.00 | $1,755.00 | ![]() | $126.00 | $1,638.00 | ![]() |
78 | Snow Fence Barrier W/Archeological Area | 440 | L.F. | ![]() | $5.20 | $2,288.00 | ![]() | $5.00 | $2,200.00 | ![]() | $5.40 | $2,376.00 | ![]() |
79 | Construction Survey Staking and As-Built Survey | 1 | Each | ![]() | $35,354.75 | $35,354.75 | ![]() | $57,500.00 | $57,500.00 | ![]() | $82,500.00 | $82,500.00 | ![]() |
80 | NPDES General Permit #2 & SWPPP | 1 | L.S. | ![]() | $8,240.00 | $8,240.00 | ![]() | $7,000.00 | $7,000.00 | ![]() | $2,200.00 | $2,200.00 | ![]() |
81 | Mobilization | 1 | L.S. | ![]() | $155,000.00 | $155,000.00 | ![]() | $50,000.00 | $50,000.00 | ![]() | $99,500.00 | $99,500.00 | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
$1,691,712.275 | ![]() | $1,802,455.28 | ![]() | $1,899,585.605 | ![]() | ||||||||
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
![]() | 4 | 5 | 6 | ![]() | |||||||||
Estimated Cost: $2,200,000.00 | Contractor: | ![]() | CJ Moyna & Sons Inc | ![]() | |||||||||
Funding Source: 27% Infrastructure, 73% Park & Institutional Road Fund, | ![]() | 8710 Earhart Ln SW | ![]() | ![]() | ![]() | ||||||||
![]() | Cedar Rapids IA 52404 | ![]() | ![]() | ![]() | |||||||||
Plan Sets Requested: 0 | Quantities | ![]() | 319-841-9260 | ![]() | ![]() | ![]() | |||||||
No. | Description: | No. | Unit | ![]() | Unit Price | Amount | ![]() | Unit Price | Amount | ![]() | Unit Price | Amount | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
1 | Clearing and Grubbing | 1 | L.S. | ![]() | $45,000.00 | $45,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
2 | Tree Clearing/Stump Grinding | 1 | L.S. | ![]() | $45,000.00 | $45,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
3 | Full Depth Saw Cut | 325 | L.F. | ![]() | $10.00 | $3,250.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
4 | HMA Pavement Removal | 12800 | S.Y. | ![]() | $15.00 | $192,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
5 | PCC Removal | 529.4 | S.Y. | ![]() | $25.00 | $13,235.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
6 | Grading | 1 | L.S. | ![]() | $260,000.00 | $260,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
7 | 12-inch Filter Sock | 3160 | L.F. | ![]() | $2.50 | $7,900.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
8 | Sanitary Sewer Connections to Existing Manhole | 2 | Each | ![]() | $1,450.00 | $2,900.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
9 | Type SW-301 48" Diameter Sanitary Manhole w/Type 'A' Casting | 1 | Each | ![]() | $7,050.00 | $7,050.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
10 | 6-inch Sanitary Sewer (PVC SDR 23.5) | 228 | L.F. | ![]() | $66.00 | $15,048.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
11 | 4-inch Sanitary Sewer Service (PVC SDR 23.5) | 242 | L.F. | ![]() | $52.00 | $12,584.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
12 | Disposal Station RV Cleanout Connection | 2 | Each | ![]() | $2,050.00 | $4,100.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
13 | RV Sanitary Sewer Cleanout Connection | 6 | Each | ![]() | $1,875.00 | $11,250.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
14 | 6"x4" PVC Schedule 40 Service Wye | 6 | Each | ![]() | $315.00 | $1,890.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
15 | 2"x2"x2"x2" HDPE Cross | 1 | Each | ![]() | $300.00 | $300.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
16 | 1-inch HDPE Pipe | 1128 | L.F. | ![]() | $24.00 | $27,072.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
17 | 2-inch HDPE Pipe | 1195 | L.F. | ![]() | $25.00 | $29,875.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
18 | 2-Inch Valve | 3 | Each | ![]() | $900.00 | $2,700.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
19 | Woodford Model S-3 Sanitary Yard Hydrant w/Drain Down Pit (or Approved Equal) | 16 | Each | ![]() | $4,200.00 | $67,200.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
20 | Woodford Model S-3 Sanitary Yard Hydrant w/o Drain Down Pit (or Approved Equal) | 2 | Each | ![]() | $3,500.00 | $7,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
21 | Woodford Model S-4H ADA Sanitary Yard Hydrant w/Drain Down Pit (or Approved Equal) | 2 | Each | ![]() | $3,600.00 | $7,200.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
22 | Woodford Model S-4H ADA Sanitary Yard Hydrant w/o Drain Down Pit (or Approved Equal) | 2 | Each | ![]() | $5,800.00 | $11,600.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
23 | 1"x1"x1" HDPE Tee | 2 | Each | ![]() | $262.00 | $524.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
24 | 2"x2"x1" HDPE Tee | 14 | Each | ![]() | $275.00 | $3,850.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
25 | 2"x2"x2" HDPE Tee | 3 | Each | ![]() | $275.00 | $825.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
26 | 2"x1" HDPE Reducer | 5 | Each | ![]() | $260.00 | $1,300.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
27 | WellXTrol Model WX-452C Pressure Tanks (or Approved Equal) | 2 | Each | ![]() | $4,500.00 | $9,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
28 | Pressure Tank Installation and Removal of 2 Old Tanks | 1 | L.S. | ![]() | $1,800.00 | $1,800.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
29 | Water Connection | 2 | Each | ![]() | $2,400.00 | $4,800.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
30 | Disinfection | 1 | L.S. | ![]() | $1,800.00 | $1,800.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
31 | Type SW-512 Circular Area Intake W/Type 3A Casting | 8 | Each | ![]() | $2,650.00 | $21,200.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
32 | Type SW-513 open Sided Area Intake W/Type G Casting | 4 | Each | ![]() | $5,050.00 | $20,200.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
33 | 12-inch RCP Class III | 505.7 | L.F. | ![]() | $68.00 | $34,387.60 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
34 | 15-inch RCP Class III | 415.4 | L.F. | ![]() | $72.00 | $29,908.80 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
35 | 12-inch RCP Class III FES | 1 | Each | ![]() | $2,300.00 | $2,300.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
36 | 15-inch RCP Class III FES | 1 | Each | ![]() | $2,500.00 | $2,500.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
37 | Class 'D' Riprap | 100 | Tons | ![]() | $90.00 | $9,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
38 | Primary Electric Service To Distribution Panels | 1 | L.S. | ![]() | $36,000.00 | $36,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
39 | Single Campsite Outlet Post-30 Amp | 1 | Each | ![]() | $400.00 | $400.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
40 | Single Campsite Outlet Post-50 Amp | 60 | Each | ![]() | $400.00 | $24,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
41 | No. 2 AWG Grounding Conductor Cable, Type THW or USE | 4359 | L.F. | ![]() | $3.10 | $13,512.90 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
42 | No. 4 AWG Grounding Conductor Cable, Type THW or USE | 822 | L.F. | ![]() | $2.00 | $1,644.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
43 | No. 350 MCM Single Conductor Cable, Type USE | 837 | L.F. | ![]() | $12.00 | $10,044.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
44 | No. 300 MCM Single Conductor Cable, Type USE | 1386 | L.F. | ![]() | $10.00 | $13,860.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
45 | No. 250 MCM Single Conductor Cable, Type USE | 2640 | L.F. | ![]() | $9.00 | $23,760.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
46 | No. 4/0 AWG Single Conductor Cable, Type USE | 8214 | L.F. | ![]() | $8.30 | $68,176.20 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
47 | No. 3/0 AWG Single Conductor Cable, Type USE | 1656 | L.F. | ![]() | $6.80 | $11,260.80 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
48 | No. 2/0 AWG Single Conductor Cable, Type USE | 810 | L.F. | ![]() | $5.40 | $4,374.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
49 | Roadway Crossing 3-Inch Conduit-Schedule 80 PVC | 90 | L.F. | ![]() | $12.00 | $1,080.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
50 | Roadway Crossing 2.5-inch Conduit-Schedule 80 PVC | 290 | L.F. | ![]() | $10.20 | $2,958.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
51 | Roadway Crossing 2-inch Conduit-Schedule 80 PVC | 25 | L.F. | ![]() | $8.00 | $200.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
52 | Detectable Warning Tape, 3" Electric | 4116 | L.F. | ![]() | $0.20 | $823.20 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
53 | Trench, Single Circuit Secondary | 4521 | L.F. | ![]() | $11.50 | $51,991.50 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
54 | 200 Amp Circuit Breaker | 9 | Each | ![]() | $400.00 | $3,600.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
55 | 175 Amp Circuit Breaker | 1 | Each | ![]() | $1,200.00 | $1,200.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
56 | 150 Amp Circuit Breaker | 1 | Each | ![]() | $300.00 | $300.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
57 | 600 Amp Distribution Panel | 1 | Each | ![]() | $6,600.00 | $6,600.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
58 | 400 Amp Distribution Panel | 1 | Each | ![]() | $5,400.00 | $5,400.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
59 | Electrical Connection To Check-in Kiosk and LED Light | 1 | L.S. | ![]() | $1,900.00 | $1,900.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
60 | Special Backfill/Granular Base | 4658.3 | Tons | ![]() | $27.00 | $125,774.10 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
61 | 6-inch Non-Reinforced PCC | 3625.3 | S.Y. | ![]() | $47.00 | $170,389.10 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
62 | 7-inch Nylon Reinforced PCC | 10747.3 | S.Y. | ![]() | $45.00 | $483,628.50 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
63 | Disposal Station Island Pavement | 2 | Each | ![]() | $3,500.00 | $7,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
64 | Granular Base-Sidewalks | 32.1 | Tons | ![]() | $90.00 | $2,889.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
65 | 5-inch Non-Reinforced PCC Sidewalks | 160.4 | S.Y. | ![]() | $55.00 | $8,822.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
66 | Engineering Fabric | 7770 | S.Y. | ![]() | $6.00 | $46,620.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
67 | Macadam Stone | 1515 | Tons | ![]() | $26.00 | $39,390.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
68 | Class 'A' Crushed Stone | 1129 | Tons | ![]() | $23.00 | $25,967.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
69 | 4'x4'x5.5" Reinforced PCC Fire Ring | 60 | Each | ![]() | $375.00 | $22,500.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
70 | Traffic Control | 1 | L.S. | ![]() | $12,000.00 | $12,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
71 | Seeding, Fertilizing and Mulching | 5 | Acres | ![]() | $4,000.00 | $20,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
72 | Street Signage | 1 | L.S. | ![]() | $3,400.00 | $3,400.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
73 | Handicap Parking Signage | 1 | L.S. | ![]() | $1,400.00 | $1,400.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
74 | Street Pavement Markings | 1 | L.S. | ![]() | $3,750.00 | $3,750.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
75 | Parking Space Pavement Striping, Handicap Parking Cross Hatch Markings | 1 | L.S. | ![]() | $3,750.00 | $3,750.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
76 | 6' Concrete Parking Wheel Stops | 27 | Each | ![]() | $180.00 | $4,860.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
77 | 8' Concrete Parking Wheel Stops | 13 | Each | ![]() | $260.00 | $3,380.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
78 | Snow Fence Barrier W/Archeological Area | 440 | L.F. | ![]() | $8.00 | $3,520.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
79 | Construction Survey Staking and As-Built Survey | 1 | Each | ![]() | $100,000.00 | $100,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
80 | NPDES General Permit #2 & SWPPP | 1 | L.S. | ![]() | $12,000.00 | $12,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
81 | Mobilization | 1 | L.S. | ![]() | $250,000.00 | $250,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
$2,551,673.70 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||||||||
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
7/27/2024