IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | Goose Lake Wildlife Management Area | Date: 8/24/2023 | Project No. |
| Boat Access and Water Control Structure | County: | CLINTON | Time: 11:00 a.m. | 23-06-23-01 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $105,000.00 | Contractor: | Offset Construction LLC | Lahr Custom Excavating LLC | Ardo Schmidt Construction Inc | |||||||||
| Funding Source: 100% Marine Fuel Tax, | 9126 N Pleasant Grove Rd | 2943 140th Ave | 35010 Hwy 64 | ||||||||||
| Farley IA 52046 | Ryan IA 52330 | Preston IA 52069 | |||||||||||
| Plan Sets Requested: 8 | Quantities | 563-542-9464 | 563-920-6210 | 563-689-4875 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Mobilization | 1 | L.S. | $8,750.00 | $8,750.00 | $6,000.00 | $6,000.00 | $5,000.00 | $5,000.00 | ||||
| 2 | Traffic Control | 1 | L.S. | $1,950.00 | $1,950.00 | $1,000.00 | $1,000.00 | $2,000.00 | $2,000.00 | ||||
| 3 | Silt Fence | 400 | L.F. | $1.50 | $600.00 | $2.50 | $1,000.00 | $4.00 | $1,600.00 | ||||
| 4 | Clearing and Grubbing | 0.4 | Acres | $5,500.00 | $2,200.00 | $8,000.00 | $3,200.00 | $12,500.00 | $5,000.00 | ||||
| 5 | Site Preparation | 1 | L.S. | $3,800.00 | $3,800.00 | $4,100.00 | $4,100.00 | $5,000.00 | $5,000.00 | ||||
| 6 | Culvert, 18" CMP | 40 | L.F. | $60.00 | $2,400.00 | $55.00 | $2,200.00 | $87.50 | $3,500.00 | ||||
| 7 | Macadam Stone, 6" Depth | 354 | Tons | $23.50 | $8,319.00 | $25.00 | $8,850.00 | $38.00 | $13,452.00 | ||||
| 8 | Class A Road Stone, 3" Depth | 160 | Tons | $22.50 | $3,600.00 | $22.00 | $3,520.00 | $39.00 | $6,240.00 | ||||
| 9 | PCC Parking, 6" Depth, Reinforced | 95 | S.Y. | $80.00 | $7,600.00 | $75.00 | $7,125.00 | $80.00 | $7,600.00 | ||||
| 10 | Granular Subbase, 6" Depth | 34 | Tons | $25.00 | $850.00 | $38.00 | $1,292.00 | $42.00 | $1,428.00 | ||||
| 11 | Striping | 1 | L.S. | $750.00 | $750.00 | $750.00 | $750.00 | $2,500.00 | $2,500.00 | ||||
| 12 | Demolition of Water Control Structure and Pipe | 1 | L.S. | $1,000.00 | $1,000.00 | $1,650.00 | $1,650.00 | $3,000.00 | $3,000.00 | ||||
| 13 | Water Control Structure | 1 | Each | $8,750.00 | $8,750.00 | $8,700.00 | $8,700.00 | $25,000.00 | $25,000.00 | ||||
| 14 | Aluminum Stop Logs | 11 | Each | $547.00 | $6,017.00 | $615.00 | $6,765.00 | $272.73 | $3,000.03 | ||||
| 15 | Culvert, 36" RCP | 45 | L.F. | $270.00 | $12,150.00 | $313.00 | $14,085.00 | $200.00 | $9,000.00 | ||||
| 16 | Flared End Section, 36" RCP | 1 | Each | $5,500.00 | $5,500.00 | $4,750.00 | $4,750.00 | $2,500.00 | $2,500.00 | ||||
| 17 | Core Trench - Import (Clay) | 74 | C.Y. | $19.50 | $1,443.00 | $90.00 | $6,660.00 | $54.05 | $3,999.70 | ||||
| 18 | Bentonite Liner | 178 | S.Y. | $25.00 | $4,450.00 | $20.00 | $3,560.00 | $28.09 | $5,000.02 | ||||
| 19 | Engineering Fabric | 178 | S.Y. | $2.60 | $462.80 | $4.00 | $712.00 | $5.00 | $890.00 | ||||
| 20 | Revetment, Class E | 120 | Tons | $37.00 | $4,440.00 | $45.00 | $5,400.00 | $55.00 | $6,600.00 | ||||
| 21 | Site Restoration | 1 | L.S. | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | ||||
| $88,031.80 | $94,319.00 | $115,309.75 | |||||||||||
4 | 5 | 6 | |||||||||||
| Estimated Cost: $105,000.00 | Contractor: | Connolly Construction Inc | Connolly Excavating Inc | McClintock Trucking & Excavating | |||||||||
| Funding Source: 100% Marine Fuel Tax, | 18409 N Cascade Rd | PO Box 942 | 1701 1st Ave | ||||||||||
| Peosta IA 52068 | Cascade IA 52033 | Silvis IL 61282 | |||||||||||
| Plan Sets Requested: 8 | Quantities | 563-876-3225 | 563-513-9772 | 309-912-9138 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Mobilization | 1 | L.S. | $9,545.00 | $9,545.00 | $10,000.00 | $10,000.00 | $7,500.00 | $7,500.00 | ||||
| 2 | Traffic Control | 1 | L.S. | $2,285.00 | $2,285.00 | $2,500.00 | $2,500.00 | $1,500.00 | $1,500.00 | ||||
| 3 | Silt Fence | 400 | L.F. | $4.50 | $1,800.00 | $3.50 | $1,400.00 | $3.50 | $1,400.00 | ||||
| 4 | Clearing and Grubbing | 0.4 | Acres | $10,580.00 | $4,232.00 | $12,500.00 | $5,000.00 | $19,500.00 | $7,800.00 | ||||
| 5 | Site Preparation | 1 | L.S. | $2,565.00 | $2,565.00 | $8,500.00 | $8,500.00 | $9,750.00 | $9,750.00 | ||||
| 6 | Culvert, 18" CMP | 40 | L.F. | $37.90 | $1,516.00 | $125.00 | $5,000.00 | $62.50 | $2,500.00 | ||||
| 7 | Macadam Stone, 6" Depth | 354 | Tons | $25.45 | $9,009.30 | $38.00 | $13,452.00 | $33.50 | $11,859.00 | ||||
| 8 | Class A Road Stone, 3" Depth | 160 | Tons | $23.00 | $3,680.00 | $45.00 | $7,200.00 | $34.50 | $5,520.00 | ||||
| 9 | PCC Parking, 6" Depth, Reinforced | 95 | S.Y. | $85.00 | $8,075.00 | $96.00 | $9,120.00 | $76.00 | $7,220.00 | ||||
| 10 | Granular Subbase, 6" Depth | 34 | Tons | $30.80 | $1,047.20 | $60.00 | $2,040.00 | $32.00 | $1,088.00 | ||||
| 11 | Striping | 1 | L.S. | $1,300.00 | $1,300.00 | $3,000.00 | $3,000.00 | $1,000.00 | $1,000.00 | ||||
| 12 | Demolition of Water Control Structure and Pipe | 1 | L.S. | $2,810.00 | $2,810.00 | $3,500.00 | $3,500.00 | $5,500.00 | $5,500.00 | ||||
| 13 | Water Control Structure | 1 | Each | $24,100.00 | $24,100.00 | $15,000.00 | $15,000.00 | $20,000.00 | $20,000.00 | ||||
| 14 | Aluminum Stop Logs | 11 | Each | $575.00 | $6,325.00 | $300.00 | $3,300.00 | $2,000.00 | $22,000.00 | ||||
| 15 | Culvert, 36" RCP | 45 | L.F. | $353.00 | $15,885.00 | $285.00 | $12,825.00 | $245.00 | $11,025.00 | ||||
| 16 | Flared End Section, 36" RCP | 1 | Each | $6,452.00 | $6,452.00 | $4,500.00 | $4,500.00 | $3,200.00 | $3,200.00 | ||||
| 17 | Core Trench - Import (Clay) | 74 | C.Y. | $26.00 | $1,924.00 | $45.00 | $3,330.00 | $59.50 | $4,403.00 | ||||
| 18 | Bentonite Liner | 178 | S.Y. | $21.85 | $3,889.30 | $25.00 | $4,450.00 | $20.00 | $3,560.00 | ||||
| 19 | Engineering Fabric | 178 | S.Y. | $3.35 | $596.30 | $4.00 | $712.00 | $5.00 | $890.00 | ||||
| 20 | Revetment, Class E | 120 | Tons | $44.15 | $5,298.00 | $55.00 | $6,600.00 | $50.00 | $6,000.00 | ||||
| 21 | Site Restoration | 1 | L.S. | $5,325.00 | $5,325.00 | $8,500.00 | $8,500.00 | $6,000.00 | $6,000.00 | ||||
| $117,659.10 | $129,929.00 | $139,715.00 | |||||||||||
7 | 8 | 9 | |||||||||||
| Estimated Cost: $105,000.00 | Contractor: | Five Cities Construction Co | Miller Trucking & Excavating Co | Ihrig Works LLC | |||||||||
| Funding Source: 100% Marine Fuel Tax, | PO Box 18 | 3303 John Deere Rd | 16550 267th St | ||||||||||
| Coal Valley IL 61240 | Silvis IL 61282 | Long Grove IA 52756 | |||||||||||
| Plan Sets Requested: 8 | Quantities | 309-781-4494 | 309-755-7644 | 563-285-8790 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Mobilization | 1 | L.S. | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $9,600.00 | $9,600.00 | ||||
| 2 | Traffic Control | 1 | L.S. | $2,450.00 | $2,450.00 | $2,500.00 | $2,500.00 | $2,640.00 | $2,640.00 | ||||
| 3 | Silt Fence | 400 | L.F. | $5.00 | $2,000.00 | $2.85 | $1,140.00 | $3.00 | $1,200.00 | ||||
| 4 | Clearing and Grubbing | 0.4 | Acres | $16,000.00 | $6,400.00 | $20,000.00 | $8,000.00 | $25,000.00 | $10,000.00 | ||||
| 5 | Site Preparation | 1 | L.S. | $7,500.00 | $7,500.00 | $9,500.00 | $9,500.00 | $10,000.00 | $10,000.00 | ||||
| 6 | Culvert, 18" CMP | 40 | L.F. | $200.00 | $8,000.00 | $80.00 | $3,200.00 | $124.00 | $4,960.00 | ||||
| 7 | Macadam Stone, 6" Depth | 354 | Tons | $45.00 | $15,930.00 | $32.00 | $11,328.00 | $37.50 | $13,275.00 | ||||
| 8 | Class A Road Stone, 3" Depth | 160 | Tons | $45.00 | $7,200.00 | $32.00 | $5,120.00 | $34.00 | $5,440.00 | ||||
| 9 | PCC Parking, 6" Depth, Reinforced | 95 | S.Y. | $100.00 | $9,500.00 | $120.00 | $11,400.00 | $103.00 | $9,785.00 | ||||
| 10 | Granular Subbase, 6" Depth | 34 | Tons | $45.00 | $1,530.00 | $35.00 | $1,190.00 | $47.00 | $1,598.00 | ||||
| 11 | Striping | 1 | L.S. | $1,500.00 | $1,500.00 | $1,000.00 | $1,000.00 | $650.00 | $650.00 | ||||
| 12 | Demolition of Water Control Structure and Pipe | 1 | L.S. | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $3,500.00 | $3,500.00 | ||||
| 13 | Water Control Structure | 1 | Each | $28,750.00 | $28,750.00 | $17,500.00 | $17,500.00 | $19,200.00 | $19,200.00 | ||||
| 14 | Aluminum Stop Logs | 11 | Each | $800.00 | $8,800.00 | $2,400.00 | $26,400.00 | $2,300.00 | $25,300.00 | ||||
| 15 | Culvert, 36" RCP | 45 | L.F. | $262.00 | $11,790.00 | $450.00 | $20,250.00 | $370.00 | $16,650.00 | ||||
| 16 | Flared End Section, 36" RCP | 1 | Each | $6,000.00 | $6,000.00 | $3,250.00 | $3,250.00 | $4,200.00 | $4,200.00 | ||||
| 17 | Core Trench - Import (Clay) | 74 | C.Y. | $55.00 | $4,070.00 | $45.00 | $3,330.00 | $92.00 | $6,808.00 | ||||
| 18 | Bentonite Liner | 178 | S.Y. | $25.00 | $4,450.00 | $35.00 | $6,230.00 | $21.00 | $3,738.00 | ||||
| 19 | Engineering Fabric | 178 | S.Y. | $10.00 | $1,780.00 | $9.50 | $1,691.00 | $6.00 | $1,068.00 | ||||
| 20 | Revetment, Class E | 120 | Tons | $50.00 | $6,000.00 | $75.00 | $9,000.00 | $63.00 | $7,560.00 | ||||
| 21 | Site Restoration | 1 | L.S. | $2,500.00 | $2,500.00 | $6,500.00 | $6,500.00 | $9,900.00 | $9,900.00 | ||||
| $146,150.00 | $158,529.00 | $167,072.00 | |||||||||||
10 | 11 | 12 | |||||||||||
| Estimated Cost: $105,000.00 | Contractor: | Tschiggfrie Excavating Co | BWC, INC | ||||||||||
| Funding Source: 100% Marine Fuel Tax, | 425 Julien Dubuque Dr | 1303 Hickory Hollow Rd | |||||||||||
| Dubuque IA 52003 | Solon IA 52333 | ||||||||||||
| Plan Sets Requested: 8 | Quantities | 563-557-7450 | 563-321-8669 | ||||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Mobilization | 1 | L.S. | $26,500.00 | $26,500.00 | $15,000.00 | $15,000.00 | $0.00 | |||||
| 2 | Traffic Control | 1 | L.S. | $2,500.00 | $2,500.00 | $2,145.00 | $2,145.00 | $0.00 | |||||
| 3 | Silt Fence | 400 | L.F. | $6.00 | $2,400.00 | $3.00 | $1,200.00 | $0.00 | |||||
| 4 | Clearing and Grubbing | 0.4 | Acres | $6,000.00 | $2,400.00 | $12,500.00 | $5,000.00 | $0.00 | |||||
| 5 | Site Preparation | 1 | L.S. | $17,000.00 | $17,000.00 | $18,500.00 | $18,500.00 | $0.00 | |||||
| 6 | Culvert, 18" CMP | 40 | L.F. | $155.00 | $6,200.00 | $97.25 | $3,890.00 | $0.00 | |||||
| 7 | Macadam Stone, 6" Depth | 354 | Tons | $42.00 | $14,868.00 | $30.15 | $10,673.10 | $0.00 | |||||
| 8 | Class A Road Stone, 3" Depth | 160 | Tons | $38.00 | $6,080.00 | $41.40 | $6,624.00 | $0.00 | |||||
| 9 | PCC Parking, 6" Depth, Reinforced | 95 | S.Y. | $125.00 | $11,875.00 | $100.00 | $9,500.00 | $0.00 | |||||
| 10 | Granular Subbase, 6" Depth | 34 | Tons | $42.00 | $1,428.00 | $65.00 | $2,210.00 | $0.00 | |||||
| 11 | Striping | 1 | L.S. | $1,800.00 | $1,800.00 | $1,500.00 | $1,500.00 | $0.00 | |||||
| 12 | Demolition of Water Control Structure and Pipe | 1 | L.S. | $2,200.00 | $2,200.00 | $5,855.00 | $5,855.00 | $0.00 | |||||
| 13 | Water Control Structure | 1 | Each | $22,400.00 | $22,400.00 | $33,754.00 | $33,754.00 | $0.00 | |||||
| 14 | Aluminum Stop Logs | 11 | Each | $500.00 | $5,500.00 | $800.00 | $8,800.00 | $0.00 | |||||
| 15 | Culvert, 36" RCP | 45 | L.F. | $300.00 | $13,500.00 | $200.00 | $9,000.00 | $0.00 | |||||
| 16 | Flared End Section, 36" RCP | 1 | Each | $2,700.00 | $2,700.00 | $6,856.00 | $6,856.00 | $0.00 | |||||
| 17 | Core Trench - Import (Clay) | 74 | C.Y. | $42.00 | $3,108.00 | $225.00 | $16,650.00 | $0.00 | |||||
| 18 | Bentonite Liner | 178 | S.Y. | $55.00 | $9,790.00 | $8.25 | $1,468.50 | $0.00 | |||||
| 19 | Engineering Fabric | 178 | S.Y. | $5.00 | $890.00 | $152.00 | $27,056.00 | $0.00 | |||||
| 20 | Revetment, Class E | 120 | Tons | $90.00 | $10,800.00 | $51.25 | $6,150.00 | $0.00 | |||||
| 21 | Site Restoration | 1 | L.S. | $12,000.00 | $12,000.00 | $7,500.00 | $7,500.00 | $0.00 | |||||
| $175,939.00 | $199,331.60 | $0.00 | |||||||||||