IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Palisades-Kepler State Park  Date: 1/18/2024  Project No.  
  Pavement Maintenance  County:   LINN  Time: 11:00 a.m.  23-06-57-01

 

 
1
2
3
Estimated Cost: $553,000.00
Contractor: 
Top Grade Excavating IncL.L. Pelling Company IncHansen Asphalt Inc
Funding Source: 100% Park & Institutional Road Fund, 971 9th Ave NW
1425 West Penn St
3699 Forest Gate Dr NE
Farley IA  52046North Liberty IA  52317Iowa City IA  52240
Plan Sets Requested: 2
Quantities
563-744-3416319-626-4600319-321-5998
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Patches, Full-Depth Finish, 6-inch, By Area, PCC30S.Y.$95.00$2,850.00 $245.00$7,350.00 $240.00$7,200.00 
2Patches, Full-Depth Finish, 6-inch, By Count, PCC2Each$300.00$600.00 $275.00$550.00 $100.00$200.00 
3Asphalt Emulsion-Fog Seal (Pavement)1725GAL.$9.00$15,525.00 $10.00$17,250.00 $11.00$18,975.00 
4Patches, Full-Depth Finish, 6-inch, By Area, HMA2374.2S.Y.$80.00$189,936.00 $88.00$208,929.60 $120.00$284,904.00 
5Patches, Full-Depth Finish, 6-inch, By Count, HMA48Each$300.00$14,400.00 $275.00$13,200.00 $400.00$19,200.00 
6Patches, Full-Depth Repair, By Area, HMA33.4S.Y.$65.00$2,171.00 $88.00$2,939.20 $135.00$4,509.00 
7Patches, Full-Depth Repair, By Count, HMA1Each$300.00$300.00 $275.00$275.00 $400.00$400.00 
8Patches, Partial-Depth Repair, HMA 139S.Y.$27.00$3,753.00 $17.00$2,363.00 $130.00$18,070.00 
9HMA (Partial Depth Patch Material) 17Tons$425.00$7,225.00 $184.00$3,128.00 $300.00$5,100.00 
10Subbase (Patches)406.5C.Y.$23.00$9,349.50 $108.00$43,902.00 $45.00$18,292.50 
11Pavement Scarification667S.Y.$16.00$10,672.00 $11.00$7,337.00 $10.00$6,670.00 
12Hot Mix Asphalt High Traffic, Surface Course, 1/2 In. Mix, No Special Friction Requirement 74Tons$235.00$17,390.00 $235.00$17,390.00 $220.00$16,280.00 
13Asphalt Binder, PG 58-28H, High Traffic3.7Tons$850.00$3,145.00 $630.00$2,331.00 $1,320.00$4,884.00 
14Transverse Joint Repair80Tons$425.00$34,000.00 $805.00$64,400.00 $650.00$52,000.00 
15Cleaning and Filling Cracks (HMA Surfaces)2.93MI.$3,400.00$9,962.00 $9,300.00$27,249.00 $7,000.00$20,510.00 
16Sealer Material (HMA Surfaces)1465LB.$3.10$4,541.50 $1.00$1,465.00 $1.00$1,465.00 
17Granular Shoulder, 1 1/2" Minus18Tons$75.00$1,350.00 $111.00$1,998.00 $60.00$1,080.00 
18Granular Shoulder, Macadam14Tons$85.00$1,190.00 $134.00$1,876.00 $80.00$1,120.00 
19Revetment, Class E114Tons$95.00$10,830.00 $95.00$10,830.00 $110.00$12,540.00 
20Erosion Stone9Tons$100.00$900.00 $213.00$1,917.00 $50.00$450.00 
21Reshaping Ditch2.95STA.$2,100.00$6,195.00 $2,200.00$6,490.00 $4,067.80$12,000.01 
22Clean-Out Pipe Culvert360L.F.$30.00$10,800.00 $36.00$12,960.00 $20.00$7,200.00 
23Seeding and Fertilizing0.1Acres$26,000.00$2,600.00 $15,750.00$1,575.00 $10,000.00$1,000.00 
24Stabilizing Crop - Seeding and Fertilizing0.1Acres$1,000.00$100.00 $5,250.00$525.00 $10,000.00$1,000.00 
25Traffic Control1L.S.$3,000.00$3,000.00 $19,000.00$19,000.00 $12,000.00$12,000.00 
26Mobilization1L.S.$4,000.00$4,000.00 $26,000.00$26,000.00 $25,000.00$25,000.00 
      $366,785.00  $503,229.80  $552,049.51 
 



 

7/27/2024