IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Trickle Slough WMA  Date: 8/18/2022  Project No.  
  Dike Construction  County:   DICKINSON  Time: 3:00 p.m.  23-01-30-02

 

 
1
2
3
Estimated Cost: $50,000.00
Contractor: 
B & S Tiling Excavation LLCEmpire ExcavationM & S Dirtwork
Funding Source: 100% Cash Donation, 3260 Fletcher Ave
219 Lawndale St
10742 Ivy Ave
Lake City IA  51449Odebolt IA  51458Breda IA  51436
Plan Sets Requested: 0
Quantities
712-210-3049712-660-8137712-790-2324
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$2,500.00$2,500.00 $2,000.00$2,000.00 $3,000.00$3,000.00 
2Site Restoration1L.S.$1,500.00$1,500.00 $3,000.00$3,000.00 $1,000.00$1,000.00 
3Anti-Seep Collar, 3'x3'1Each$500.00$500.00 $350.00$350.00 $350.00$350.00 
4Bar Guard, Heavy Duty, 10in. - Install Only2Each$100.00$200.00 $100.00$200.00 $30.00$60.00 
5CMP, 12in. - Install Only10L.F.$25.00$250.00 $10.00$100.00 $10.00$100.00 
6CMP, 8in. - Install Only20L.F.$25.00$500.00 $10.00$200.00 $10.00$200.00 
7Culvert Anchors2Each$150.00$300.00 $250.00$500.00 $150.00$300.00 
8Embankment8438C.Y.$2.85$24,048.30 $3.00$25,314.00 $2.92$24,638.96 
9Erosion Stone7.5Tons$100.00$750.00 $80.00$600.00 $100.00$750.00 
10Excavation 162C.Y.$4.25$688.50 $10.00$1,620.00 $4.00$648.00 
11Fire Proof Cover1Each$2,000.00$2,000.00 $1,800.00$1,800.00 $2,000.00$2,000.00 
12Sediment Log, 12"1170L.F.$4.50$5,265.00 $4.00$4,680.00 $7.00$8,190.00 
13Tile Investigation1020L.F.$2.00$2,040.00 $2.00$2,040.00 $2.45$2,499.00 
14Tile, Non-perf, Dual Wall, 10in. - Install Only53L.F.$10.00$530.00 $10.00$530.00 $10.00$530.00 
15Tile, Non-perf, Single Wall, 6in. - Install Only90L.F.$10.00$900.00 $10.00$900.00 $10.00$900.00 
16Water Control Structure, 7' tall, 10in. dia.1Each$2,500.00$2,500.00 $2,000.00$2,000.00 $2,800.00$2,800.00 
17Storm Water Permit & Pollution Prevention Plan Management1L.S.$1,500.00$1,500.00 $3,000.00$3,000.00 $2,000.00$2,000.00 
      $45,971.80  $48,834.00  $49,965.96 
 
4
5
6
Estimated Cost: $50,000.00
Contractor: 
BLAC Construction LLC
Funding Source: 100% Cash Donation, 1281 Miller Road


Sherburn MN  56171    
Plan Sets Requested: 0
Quantities
507-236-0128
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$250.00$250.00 $0.00 $0.00 
2Site Restoration1L.S.$800.00$800.00 $0.00 $0.00 
3Anti-Seep Collar, 3'x3'1Each$160.00$160.00 $0.00 $0.00 
4Bar Guard, Heavy Duty, 10in. - Install Only2Each$50.00$100.00 $0.00 $0.00 
5CMP, 12in. - Install Only10L.F.$17.25$172.50 $0.00 $0.00 
6CMP, 8in. - Install Only20L.F.$17.25$345.00 $0.00 $0.00 
7Culvert Anchors2Each$125.00$250.00 $0.00 $0.00 
8Embankment8438C.Y.$3.91$32,992.58 $0.00 $0.00 
9Erosion Stone7.5Tons$126.67$950.025 $0.00 $0.00 
10Excavation 162C.Y.$4.50$729.00 $0.00 $0.00 
11Fire Proof Cover1Each$1,795.00$1,795.00 $0.00 $0.00 
12Sediment Log, 12"1170L.F.$4.45$5,206.50 $0.00 $0.00 
13Tile Investigation1020L.F.$2.00$2,040.00 $0.00 $0.00 
14Tile, Non-perf, Dual Wall, 10in. - Install Only53L.F.$18.11$959.83 $0.00 $0.00 
15Tile, Non-perf, Single Wall, 6in. - Install Only90L.F.$10.89$980.10 $0.00 $0.00 
16Water Control Structure, 7' tall, 10in. dia.1Each$1,750.00$1,750.00 $0.00 $0.00 
17Storm Water Permit & Pollution Prevention Plan Management1L.S.$500.00$500.00 $0.00 $0.00 
      $49,980.535  $0.00  $0.00 
 



 

7/26/2024