IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   George Wyth State Park  Date: 7/19/2022  Project No.  
  Cedar Valley Trail 1.3 miles Reconstruction  County:   BLACK HAWK  Time: 10:00 a.m.  22-03-07-02

 

 
1
2
3
Estimated Cost: $690,000.00
Contractor: 
Wicks Construction CoOEL Construction Services, IncLodge Construction, Inc.
Funding Source: 100% Infrastructure, 2201 State Hwy 9
PO Box 428


Decorah IA  52101    
Plan Sets Requested: 0
Quantities
563-382-2325
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Special Backfill2718Tons$30.00$81,540.00 $33.25$90,373.50 $30.00$81,540.00 
2Excavation, Class 10 Waste1939C.Y.$20.00$38,780.00 $22.25$43,142.75 $20.00$38,780.00 
3Aprons, Metal, 18 In. Dia.2Each$600.00$1,200.00 $750.00$1,500.00 $600.00$1,200.00 
4Culvert, Corrugated Metal Entrance Pipe 18" Dia.37L.F.$75.00$2,775.00 $83.00$3,071.00 $75.00$2,775.00 
5Removal of Recreational Trail6276S.Y.$9.50$59,622.00 $10.50$65,898.00 $9.50$59,622.00 
6Recreational Trail, Portland Cement Concrete, 5 In.7845S.Y.$31.00$243,195.00 $43.50$341,257.50 $47.00$368,715.00 
7Construction Survey1L.S.$8,250.00$8,250.00 $15,000.00$15,000.00 $12,000.00$12,000.00 
8Traffic Control1L.S.$2,000.00$2,000.00 $3,000.00$3,000.00 $2,000.00$2,000.00 
9Mobilization1L.S.$50,000.00$50,000.00 $40,000.00$40,000.00 $40,000.00$40,000.00 
10Perimeter and Slope Sediment Control Device, 9 In. Dia.14120L.F.$1.90$26,828.00 $2.10$29,652.00 $2.00$28,240.00 
11Mobilizations, Erosion Control2Each$500.00$1,000.00 $500.00$1,000.00 $500.00$1,000.00 
      $515,190.00  $633,894.75  $635,872.00 
 
 
4
5
6
Estimated Cost: $690,000.00
Contractor: 
Tschiggfrie Excavating Co.Owen Contracting, Inc.Peterson Contractors, Inc.
Funding Source: 100% Infrastructure,


     
Plan Sets Requested: 0
Quantities
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Special Backfill2718Tons$40.00$108,720.00 $30.00$81,540.00 $48.00$130,464.00 
2Excavation, Class 10 Waste1939C.Y.$22.00$42,658.00 $20.00$38,780.00 $60.00$116,340.00 
3Aprons, Metal, 18 In. Dia.2Each$610.00$1,220.00 $600.00$1,200.00 $600.00$1,200.00 
4Culvert, Corrugated Metal Entrance Pipe 18" Dia.37L.F.$91.00$3,367.00 $75.00$2,775.00 $95.00$3,515.00 
5Removal of Recreational Trail6276S.Y.$10.00$62,760.00 $9.50$59,622.00 $12.50$78,450.00 
6Recreational Trail, Portland Cement Concrete, 5 In.7845S.Y.$41.00$321,645.00 $52.90$415,000.50 $47.50$372,637.50 
7Construction Survey1L.S.$16,250.00$16,250.00 $8,750.00$8,750.00 $9,000.00$9,000.00 
8Traffic Control1L.S.$1,800.00$1,800.00 $3,500.00$3,500.00 $2,000.00$2,000.00 
9Mobilization1L.S.$65,000.00$65,000.00 $48,000.00$48,000.00 $40,000.00$40,000.00 
10Perimeter and Slope Sediment Control Device, 9 In. Dia.14120L.F.$2.30$32,476.00 $1.90$26,828.00 $2.00$28,240.00 
11Mobilizations, Erosion Control2Each$500.00$1,000.00 $500.00$1,000.00 $500.00$1,000.00 
      $656,896.00  $686,995.50  $782,846.50 
 
7
8
9
Estimated Cost: $690,000.00
Contractor: 
Midwest Concrete, Inc.Vieth Construction Corporation
Funding Source: 100% Infrastructure,


     
Plan Sets Requested: 0
Quantities
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Special Backfill2718Tons$38.00$103,284.00 $55.00$149,490.00 $0.00 
2Excavation, Class 10 Waste1939C.Y.$50.00$96,950.00 $85.00$164,815.00 $0.00 
3Aprons, Metal, 18 In. Dia.2Each$1,054.00$2,108.00 $1,250.00$2,500.00 $0.00 
4Culvert, Corrugated Metal Entrance Pipe 18" Dia.37L.F.$105.00$3,885.00 $150.00$5,550.00 $0.00 
5Removal of Recreational Trail6276S.Y.$18.00$112,968.00 $17.00$106,692.00 $0.00 
6Recreational Trail, Portland Cement Concrete, 5 In.7845S.Y.$50.00$392,250.00 $51.50$404,017.50 $0.00 
7Construction Survey1L.S.$10,877.00$10,877.00 $10,000.00$10,000.00 $0.00 
8Traffic Control1L.S.$1,545.00$1,545.00 $1,725.00$1,725.00 $0.00 
9Mobilization1L.S.$80,000.00$80,000.00 $60,000.00$60,000.00 $0.00 
10Perimeter and Slope Sediment Control Device, 9 In. Dia.14120L.F.$2.00$28,240.00 $2.50$35,300.00 $0.00 
11Mobilizations, Erosion Control2Each$500.00$1,000.00 $500.00$1,000.00 $0.00 
      $833,107.00  $941,089.50  $0.00 
 



 

9/1/2024