IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Spirit Lake Hatchery  Date: 2/22/2024  Project No.  
  Road Maintenance  County:   DICKINSON  Time: 11:00 a.m.  22-01-30-06

 

 
1
2
3
Estimated Cost: $81,000.00
Contractor: 
Beck Excavating Inc
Funding Source: 73% Park & Institutional Road Fund, 27% REAP Land Management, 2903 15th St


Spirit Lake IA  51360    
Plan Sets Requested: 2
Quantities
712-336-0777
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Asphalt Emulsion-Fog Seal (Pavement)275GAL.$25.00$6,875.00 $0.00 $0.00 
2Patch, Full-Depth Finish, 6-inch, By Area, HMA105.6S.Y.$95.00$10,032.00 $0.00 $0.00 
3Patch, Full-Depth Finish, 6-inch, By Count, HMA4Each$300.00$1,200.00 $0.00 $0.00 
4Subbase (Patch)17.7C.Y.$115.00$2,035.50 $0.00 $0.00 
5Transverse Joint Repair24Tons$460.00$11,040.00 $0.00 $0.00 
6Longitudinal Joint Repair (HMA)150L.F.$39.00$5,850.00 $0.00 $0.00 
7Cleaning and Filling Cracks (HMA Surfaces)0.5MI.$6,000.00$3,000.00 $0.00 $0.00 
8Sealer Material (HMA Surfaces)250LB.$8.00$2,000.00 $0.00 $0.00 
9Slurry Level0.5MI.$6,500.00$3,250.00 $0.00 $0.00 
10Safety Closure4Each$300.00$1,200.00 $0.00 $0.00 
11Painted Pavement Marking, High-Build Waterborne15STA.$280.00$4,200.00 $0.00 $0.00 
12Painted Symbol+Legend, High-Build Waterborne2Each$350.00$700.00 $0.00 $0.00 
13Signing1Each$380.00$380.00 $0.00 $0.00 
14Reconstruction of Roadbed - Blading/Shaping19.8STA.$325.00$6,435.00 $0.00 $0.00 
15Granular Shoulder, Type B2.2Tons$42.00$92.40 $0.00 $0.00 
16Granular Surface, Class A Crushed Stone428Tons$42.00$17,976.00 $0.00 $0.00 
17Traffic Control1L.S.$3,200.00$3,200.00 $0.00 $0.00 
18Mobilization1L.S.$9,800.00$9,800.00 $0.00 $0.00 
      $89,265.90  $0.00  $0.00 
 



 

12/21/2024