IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Spirit Lake Fish Hatchery  Date: 1/22/2026  Project No.  
  Shoreline Restoration  County:   DICKINSON  Time: 11:00 a.m.  22-01-30-04

 

 
1
2
3
Estimated Cost: $300,000.00
Contractor: 
Red Rock ConstructionAdam Laubenthal DBA Laubenthal ExcavationUnderwater Solutions, LLC
Funding Source: 100% Marine Fuel Tax, 27050 Sunrise Ave, Ste 1
1245 180th St
25611 Walleye Drive
Sioux Falls SD  57106Bradgate IA  50520Spirit Lake IA  51360
Plan Sets Requested: 13
Quantities
605-201-6348515-368-1112712-260-7818
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$11,000.00$11,000.00 $9,000.00$9,000.00 $1,500.00$1,500.00 
2Traffic Control1L.S.$1,000.00$1,000.00 $2,500.00$2,500.00 $1,000.00$1,000.00 
3Tree and Brush Clearing1L.S.$59,000.00$59,000.00 $54,000.00$54,000.00 $67,970.00$67,970.00 
4Native Fieldstone, Class D Riprap222Tons$66.00$14,652.00 $115.00$25,530.00 $139.00$30,858.00 
5Double 12" Coir Log640L.F.$22.00$14,080.00 $31.25$20,000.00 $54.00$34,560.00 
6Single 12" Coir Log220L.F.$11.00$2,420.00 $27.27$5,999.40 $30.00$6,600.00 
7Earthfill (topsoil)120C.Y.$64.00$7,680.00 $30.00$3,600.00 $95.00$11,400.00 
8Granular Surfacing, 1.5" Roadstone50Tons$32.00$1,600.00 $45.00$2,250.00 $85.00$4,250.00 
9Turf Grass Seeding1.5Acres$2,925.00$4,387.50 $2,000.00$3,000.00 $1,250.00$1,875.00 
10Native Seeding1Acres$2,600.00$2,600.00 $2,000.00$2,000.00 $3,200.00$3,200.00 
11Hydraulic Wood Cellulose Mulching2.5Acres$3,800.00$9,500.00 $4,000.00$10,000.00 $4,100.00$10,250.00 
12Stump Grinding55Each$160.00$8,800.00 $273.00$15,015.00 $166.00$9,130.00 
13NPDES Permit and SWPPP1L.S.$3,000.00$3,000.00 $1,500.00$1,500.00 $1,400.00$1,400.00 
      $139,719.50  $154,394.40  $183,993.00 
 
 
4
5
6
Estimated Cost: $300,000.00
Contractor: 
Mega IncThree Oaks Contruction IncLudovissy Enterprises
Funding Source: 100% Marine Fuel Tax, 1521 Taft Ave
515 S Flynn St
702 S 2nd St
Ocheyedan IA  51354North Sioux City SD  57049Guttenberg IA  52052
Plan Sets Requested: 13
Quantities
712-758-3503712-251-1767563-880-4866
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$6,500.00$6,500.00 $35,000.00$35,000.00 $25,000.00$25,000.00 
2Traffic Control1L.S.$2,500.00$2,500.00 $1,000.00$1,000.00 $2,000.00$2,000.00 
3Tree and Brush Clearing1L.S.$43,450.00$43,450.00 $75,000.00$75,000.00 $85,000.00$85,000.00 
4Native Fieldstone, Class D Riprap222Tons$85.00$18,870.00 $150.00$33,300.00 $46.00$10,212.00 
5Double 12" Coir Log640L.F.$32.00$20,480.00 $39.00$24,960.00 $23.45$15,008.00 
6Single 12" Coir Log220L.F.$23.00$5,060.00 $23.00$5,060.00 $23.00$5,060.00 
7Earthfill (topsoil)120C.Y.$59.00$7,080.00 $65.00$7,800.00 $17.00$2,040.00 
8Granular Surfacing, 1.5" Roadstone50Tons$55.00$2,750.00 $75.00$3,750.00 $40.00$2,000.00 
9Turf Grass Seeding1.5Acres$4,617.00$6,925.50 $800.00$1,200.00 $6,700.00$10,050.00 
10Native Seeding1Acres$6,196.50$6,196.50 $1,100.00$1,100.00 $10,000.00$10,000.00 
11Hydraulic Wood Cellulose Mulching2.5Acres$9,185.40$22,963.50 $2,750.00$6,875.00 $4,000.00$10,000.00 
12Stump Grinding55Each$700.00$38,500.00 $100.00$5,500.00 $510.00$28,050.00 
13NPDES Permit and SWPPP1L.S.$4,500.00$4,500.00 $3,500.00$3,500.00 $2,000.00$2,000.00 
      $185,775.50  $204,045.00  $206,420.00 
 
7
8
9
Estimated Cost: $300,000.00
Contractor: 
Diamond Concrete & Construction, IncCory Juergens Construction LLCBeck Excavating, Inc
Funding Source: 100% Marine Fuel Tax, 3120 18th Street
6 Orchard Circle
2903 15th Street
PO Box 348
Spirit Lake IA  51360Estherville IA  51334Spirit Lake IA  51360
Plan Sets Requested: 13
Quantities
712-336-9062712-380-0184712-336-0777
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$7,500.00$7,500.00 $7,500.00$7,500.00 $18,000.00$18,000.00 
2Traffic Control1L.S.$500.00$500.00 $2,500.00$2,500.00 $1,500.00$1,500.00 
3Tree and Brush Clearing1L.S.$90,750.00$90,750.00 $100,000.00$100,000.00 $154,000.00$154,000.00 
4Native Fieldstone, Class D Riprap222Tons$94.50$20,979.00 $74.00$16,428.00 $98.00$21,756.00 
5Double 12" Coir Log640L.F.$36.69$23,481.60 $45.00$28,800.00 $31.00$19,840.00 
6Single 12" Coir Log220L.F.$18.53$4,076.60 $25.00$5,500.00 $19.00$4,180.00 
7Earthfill (topsoil)120C.Y.$81.67$9,800.40 $62.00$7,440.00 $53.50$6,420.00 
8Granular Surfacing, 1.5" Roadstone50Tons$52.96$2,648.00 $36.00$1,800.00 $63.00$3,150.00 
9Turf Grass Seeding1.5Acres$8,190.00$12,285.00 $850.00$1,275.00 $1,591.00$2,386.50 
10Native Seeding1Acres$11,700.00$11,700.00 $1,500.00$1,500.00 $2,530.00$2,530.00 
11Hydraulic Wood Cellulose Mulching2.5Acres$4,680.00$11,700.00 $4,000.00$10,000.00 $2,392.00$5,980.00 
12Stump Grinding55Each$275.00$15,125.00 $750.00$41,250.00 $305.00$16,775.00 
13NPDES Permit and SWPPP1L.S.$10,500.00$10,500.00 $3,500.00$3,500.00 $5,000.00$5,000.00 
      $221,045.60  $227,493.00  $261,517.50 
 
 
10
11
12
Estimated Cost: $300,000.00
Contractor: 
Holman Construction, LLCBedrock Gravel, IncMidwest Lake Service
Funding Source: 100% Marine Fuel Tax, 7006 R57 Hwy
1108 Hwy 59 S
2902 Aurora Ave W
Indianola IA  50125Schleswig IA  51461Spirit Lake IA  51360
Plan Sets Requested: 13
Quantities
515-250-8072712-676-3752712-339-6868
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$34,431.00$34,431.00 $10,000.00$10,000.00 $8,000.00$8,000.00 
2Traffic Control1L.S.$7,500.00$7,500.00 $2,500.00$2,500.00 $500.00$500.00 
3Tree and Brush Clearing1L.S.$102,595.00$102,595.00 $160,000.00$160,000.00 $115,500.00$115,500.00 
4Native Fieldstone, Class D Riprap222Tons$130.00$28,860.00 $165.00$36,630.00 $110.00$24,420.00 
5Double 12" Coir Log640L.F.$35.00$22,400.00 $36.00$23,040.00 $74.00$47,360.00 
6Single 12" Coir Log220L.F.$20.00$4,400.00 $18.00$3,960.00 $45.00$9,900.00 
7Earthfill (topsoil)120C.Y.$15.00$1,800.00 $25.00$3,000.00 $75.00$9,000.00 
8Granular Surfacing, 1.5" Roadstone50Tons$65.00$3,250.00 $60.00$3,000.00 $70.00$3,500.00 
9Turf Grass Seeding1.5Acres$2,016.00$3,024.00 $1,500.00$2,250.00 $8,300.00$12,450.00 
10Native Seeding1Acres$2,640.00$2,640.00 $2,500.00$2,500.00 $12,800.00$12,800.00 
11Hydraulic Wood Cellulose Mulching2.5Acres$3,850.00$9,625.00 $4,000.00$10,000.00 $7,600.00$19,000.00 
12Stump Grinding55Each$690.00$37,950.00 $250.00$13,750.00 $310.00$17,050.00 
13NPDES Permit and SWPPP1L.S.$5,500.00$5,500.00 $2,500.00$2,500.00 $4,500.00$4,500.00 
      $263,975.00  $273,130.00  $283,980.00 
 
13
14
15
Estimated Cost: $300,000.00
Contractor: 
A1 Excavating & Drainage, IncBLAC Construction LLCBD Construction Services LLC
Funding Source: 100% Marine Fuel Tax, 505 410th St
1281 Miller Rd
2410 West 11th St
PO Box 1134
Joice IA  50446Sherburn MN  56171Spencer IA  51301
Plan Sets Requested: 13
Quantities
641-588-3576507-236-0128712-363-3877
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$20,000.00$20,000.00 $20,000.00$20,000.00 $20,000.00$20,000.00 
2Traffic Control1L.S.$5,000.00$5,000.00 $3,897.00$3,897.00 $1,500.00$1,500.00 
3Tree and Brush Clearing1L.S.$125,000.00$125,000.00 $155,125.00$155,125.00 $197,500.00$197,500.00 
4Native Fieldstone, Class D Riprap222Tons$200.00$44,400.00 $132.23$29,355.06 $95.00$21,090.00 
5Double 12" Coir Log640L.F.$50.00$32,000.00 $40.62$25,996.80 $32.00$20,480.00 
6Single 12" Coir Log220L.F.$50.00$11,000.00 $22.50$4,950.00 $18.00$3,960.00 
7Earthfill (topsoil)120C.Y.$200.00$24,000.00 $99.93$11,991.60 $55.00$6,600.00 
8Granular Surfacing, 1.5" Roadstone50Tons$100.00$5,000.00 $68.06$3,403.00 $67.00$3,350.00 
9Turf Grass Seeding1.5Acres$3,000.00$4,500.00 $4,530.00$6,795.00 $2,000.00$3,000.00 
10Native Seeding1Acres$2,000.00$2,000.00 $2,831.00$2,831.00 $3,000.00$3,000.00 
11Hydraulic Wood Cellulose Mulching2.5Acres$1,000.00$2,500.00 $2,500.00$6,250.00 $4,000.00$10,000.00 
12Stump Grinding55Each$300.00$16,500.00 $397.27$21,849.85 $350.00$19,250.00 
13NPDES Permit and SWPPP1L.S.$3,000.00$3,000.00 $3,500.00$3,500.00 $5,500.00$5,500.00 
      $294,900.00  $295,944.31  $315,230.00 
 
 
16
17
18
Estimated Cost: $300,000.00
Contractor: 
Marlin Concrete LLC
Funding Source: 100% Marine Fuel Tax, 1700 Lynch Ave Unit #3


Okoboji IA  51355    
Plan Sets Requested: 13
Quantities
712-380-2000
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$42,000.00$42,000.00 $0.00 $0.00 
2Traffic Control1L.S.$4,200.00$4,200.00 $0.00 $0.00 
3Tree and Brush Clearing1L.S.$74,500.00$74,500.00 $0.00 $0.00 
4Native Fieldstone, Class D Riprap222Tons$228.00$50,616.00 $0.00 $0.00 
5Double 12" Coir Log640L.F.$68.00$43,520.00 $0.00 $0.00 
6Single 12" Coir Log220L.F.$34.00$7,480.00 $0.00 $0.00 
7Earthfill (topsoil)120C.Y.$30.00$3,600.00 $0.00 $0.00 
8Granular Surfacing, 1.5" Roadstone50Tons$54.00$2,700.00 $0.00 $0.00 
9Turf Grass Seeding1.5Acres$9,000.00$13,500.00 $0.00 $0.00 
10Native Seeding1Acres$12,000.00$12,000.00 $0.00 $0.00 
11Hydraulic Wood Cellulose Mulching2.5Acres$10,200.00$25,500.00 $0.00 $0.00 
12Stump Grinding55Each$1,200.00$66,000.00 $0.00 $0.00 
13NPDES Permit and SWPPP1L.S.$14,400.00$14,400.00 $0.00 $0.00 
      $360,016.00  $0.00  $0.00 
 



 

2/19/2026