IOWA DEPARTMENT OF NATURAL RESOURCES |
|
Bids For: | Location: | Stone State Park | Date: 6/15/2023 | Project No. |
Pavement Maintenance | County: | WOODBURY | Time: 11:00 a.m. | 22-01-97-01 |
1 | 2 | 3 | |||||||||||
Estimated Cost: $708,000.00 | Contractor: | Knife River Midwest, LLC | |||||||||||
Funding Source: 99% Park & Institutional Road Fund, 1% Infrastructure, | 2220 Hawkeye Dr | ||||||||||||
Sioux City IA 51105 | |||||||||||||
Plan Sets Requested: 1 | Quantities | 712-279-7500 | |||||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | Bituminous Fog Seal (HMA Pavement) | 6693 | GAL. | $7.85 | $52,540.05 | $0.00 | $0.00 | ||||||
2 | Patches, Full-Depth Finish, 6-inch, By Area, HMA | 988 | S.Y. | $140.00 | $138,320.00 | $0.00 | $0.00 | ||||||
3 | Patches, Full-Depth Finish, 6-inch, By Count, HMA | 26 | Each | $273.50 | $7,111.00 | $0.00 | $0.00 | ||||||
4 | Patches, Partial-Depth Repair, HMA | 95 | S.Y. | $29.20 | $2,774.00 | $0.00 | $0.00 | ||||||
5 | HMA (Partial Depth Patch Material) | 4 | Tons | $293.50 | $1,174.00 | $0.00 | $0.00 | ||||||
6 | Modified Subbase | 165 | C.Y. | $149.50 | $24,667.50 | $0.00 | $0.00 | ||||||
7 | Pavement Scarification | 911 | S.Y. | $21.20 | $19,313.20 | $0.00 | $0.00 | ||||||
8 | Hot Mix Asphalt High Traffic, Surface Course, 1/2 In. Mix, No Special Friction Requirement | 111 | Tons | $143.00 | $15,873.00 | $0.00 | $0.00 | ||||||
9 | Asphalt Binder, PG 58-28H, High Traffic | 6 | Tons | $850.00 | $5,100.00 | $0.00 | $0.00 | ||||||
10 | Transverse Joint Repair | 111 | Tons | $377.50 | $41,902.50 | $0.00 | $0.00 | ||||||
11 | Cleaning and Filling Cracks (HMA Surfaces) | 4.3 | MI. | $8,612.00 | $37,031.60 | $0.00 | $0.00 | ||||||
12 | Sealer Material (HMA Surfaces) | 4300 | LB. | $8.10 | $34,830.00 | $0.00 | $0.00 | ||||||
13 | Granular Surface On Road, 1 1/2" | 242 | Tons | $68.30 | $16,528.60 | $0.00 | $0.00 | ||||||
14 | Granular Shoulder, 1 1/2" Minus | 25 | Tons | $176.50 | $4,412.50 | $0.00 | $0.00 | ||||||
15 | Revetment, Class E | 174 | Tons | $109.50 | $19,053.00 | $0.00 | $0.00 | ||||||
16 | Erosion Stone | 5 | Tons | $174.00 | $870.00 | $0.00 | $0.00 | ||||||
17 | Seeding (Rural) | 0.1 | Acres | $13,571.00 | $1,357.10 | $0.00 | $0.00 | ||||||
18 | Rolled Erosion Control Product | 34 | S.Y. | $67.90 | $2,308.60 | $0.00 | $0.00 | ||||||
19 | Culvert, CMP Roadway, 24" | 104 | L.F. | $283.00 | $29,432.00 | $0.00 | $0.00 | ||||||
20 | Apron, Metal, 24" | 4 | Each | $1,444.00 | $5,776.00 | $0.00 | $0.00 | ||||||
21 | Pipe Apron Guard | 4 | Each | $756.00 | $3,024.00 | $0.00 | $0.00 | ||||||
22 | Ditch Cleaning | 150 | L.F. | $40.30 | $6,045.00 | $0.00 | $0.00 | ||||||
23 | Curb and Gutter Repair, HMA | 15 | L.F. | $64.00 | $960.00 | $0.00 | $0.00 | ||||||
24 | Clean Out Intakes and Outlet Pipes | 2 | Each | $3,708.00 | $7,416.00 | $0.00 | $0.00 | ||||||
25 | Traffic Control | 1 | L.S. | $24,000.00 | $24,000.00 | $0.00 | $0.00 | ||||||
26 | Mobilization | 1 | L.S. | $49,564.00 | $49,564.00 | $0.00 | $0.00 | ||||||
$551,383.65 | $0.00 | $0.00 | |||||||||||
12/23/2024