IOWA DEPARTMENT OF NATURAL RESOURCES |
|
Bids For: | Location: | Geode State Park | Date: 9/22/2022 | Project No. |
Reconstruct Beach/Boat Ramp Parking Lot | County: | DES MOINES | Time: 11:00 a.m. | 22-06-29-01 |
1 | 2 | 3 | |||||||||||
Estimated Cost: $1,753,000.00 | Contractor: | Jones Contracting Corp | Wicks Construction Inc | ||||||||||
Funding Source: 59% Park & Institutional Road Fund, 18% Marine Fuel Tax, 23% Infrastructure, | 1956 West Point Rd PO Box 156 | 2201 State Hwy 9 PO Box 428 | |||||||||||
West Point IA 52656 | Decorah IA 52101 | ||||||||||||
Plan Sets Requested: 4 | Quantities | 319-837-8129 | 563-382-2325 | ||||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | Clearing and Grubbing | 1 | L.S. | $2,850.00 | $2,850.00 | $3,500.00 | $3,500.00 | $0.00 | |||||
2 | Remove Existing Pavement and Base | 9561 | S.Y. | $3.75 | $35,853.75 | $6.50 | $62,146.50 | $0.00 | |||||
3 | Storm Sewer Abandonment, Fill+Plug, Less Than 36" | 252 | L.F. | $20.00 | $5,040.00 | $15.00 | $3,780.00 | $0.00 | |||||
4 | Remove Existing Revetment | 1530 | C.Y. | $20.00 | $30,600.00 | $3.00 | $4,590.00 | $0.00 | |||||
5 | Remove Existing Intake | 2 | Each | $350.00 | $700.00 | $850.00 | $1,700.00 | $0.00 | |||||
6 | Remove Curb and Gutter | 4.2 | STA. | $800.00 | $3,360.00 | $1,375.00 | $5,775.00 | $0.00 | |||||
7 | Painted Pavement Mark, High-Build Waterborne | 73 | STA. | $37.40 | $2,730.20 | $135.00 | $9,855.00 | $0.00 | |||||
8 | Painted Symbol+Legend, High-Build Waterborne | 3 | Each | $26.00 | $78.00 | $175.00 | $525.00 | $0.00 | |||||
9 | Pavement, 7" PCC | 10782 | S.Y. | $51.00 | $549,882.00 | $50.00 | $539,100.00 | $0.00 | |||||
10 | Earth Shoulder | 15.6 | STA. | $400.00 | $6,240.00 | $305.00 | $4,758.00 | $0.00 | |||||
11 | Special Backfill | 1907 | C.Y. | $43.50 | $82,954.50 | $50.00 | $95,350.00 | $0.00 | |||||
12 | Curb and Gutter, PCC, 2.5' | 339 | L.F. | $50.00 | $16,950.00 | $35.00 | $11,865.00 | $0.00 | |||||
13 | Intake, SW-501 | 2 | Each | $2,721.00 | $5,442.00 | $4,025.00 | $8,050.00 | $0.00 | |||||
14 | Intake, SW-511 | 2 | Each | $2,721.00 | $5,442.00 | $3,875.00 | $7,750.00 | $0.00 | |||||
15 | Manhole, SW-401 (48") | 1 | Each | $3,465.00 | $3,465.00 | $3,965.00 | $3,965.00 | $0.00 | |||||
16 | Storm Sewer, PVC, 6" | 82.2 | L.F. | $29.36 | $2,413.392 | $50.00 | $4,110.00 | $0.00 | |||||
17 | Storm Sewer, Reinforced Concrete Pipe, 12" | 407 | L.F. | $45.60 | $18,559.20 | $60.00 | $24,420.00 | $0.00 | |||||
18 | Storm Sewer, Reinforced Concrete Pipe Apron, 12" | 1 | Each | $1,500.00 | $1,500.00 | $1,750.00 | $1,750.00 | $0.00 | |||||
19 | Sidewalk, 6" PCC | 136 | S.Y. | $69.00 | $9,384.00 | $98.00 | $13,328.00 | $0.00 | |||||
20 | Excavation, Class 10, Roadway and Borrow | 52 | C.Y. | $15.00 | $780.00 | $75.00 | $3,900.00 | $0.00 | |||||
21 | Excavation, Class 10, Waste | 3428 | C.Y. | $16.55 | $56,733.40 | $8.50 | $29,138.00 | $0.00 | |||||
22 | Seeding, Fertilizing, and Mulching | 0.4 | Acres | $8,000.00 | $3,200.00 | $8,500.00 | $3,400.00 | $0.00 | |||||
23 | Filter Sock, 8" | 1100 | L.F. | $3.00 | $3,300.00 | $3.00 | $3,300.00 | $0.00 | |||||
24 | Signing | 2 | Each | $292.50 | $585.00 | $750.00 | $1,500.00 | $0.00 | |||||
25 | Bollards | 1 | Each | $500.00 | $500.00 | $500.00 | $500.00 | $0.00 | |||||
26 | NPDES General Permit #2 & SWPPP | 1 | L.S. | $6,000.00 | $6,000.00 | $1,500.00 | $1,500.00 | $0.00 | |||||
27 | Construction Staking | 1 | L.S. | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $0.00 | |||||
28 | Traffic Control | 1 | L.S. | $2,750.00 | $2,750.00 | $5,500.00 | $5,500.00 | $0.00 | |||||
29 | Mobilization | 1 | L.S. | $14,984.48 | $14,984.48 | $17,500.00 | $17,500.00 | $0.00 | |||||
$879,776.922 | $880,055.50 | $0.00 | |||||||||||