IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Wapsipinicon State Park  Date: 12/18/2025  Project No.  
  Pavement Maintenance  County:   JONES  Time: 11:00 a.m.  22-06-53-01

 

 
1
2
3
Estimated Cost: $886,000.00
Contractor: 
River City PavingL.L. Pelling Company Inc.
Funding Source: 100% Park & Institutional Road Fund, PO Box 1430
1425 W Penn St

Dubuque IA  52004North Liberty IA  52317  
Plan Sets Requested: 4
Quantities
608-568-3433319-626-4600
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Binder Bitumen, MC-300018809GAL.$7.28$136,929.52 $4.75$89,342.75 $0.00 
2Aggregate, Roadway Cover, 3/8"807Tons$72.69$58,660.83 $77.85$62,824.95 $0.00 
3Asphalt Emulsion - Fog Seal (HMA Pavement)1454GAL.$21.52$31,290.08 $6.45$9,378.30 $0.00 
4Patches, Full-Depth Finish, 6-inch, by Area, HMA53.3S.Y.$73.50$3,917.55 $91.25$4,863.625 $0.00 
5Patches, Full-Depth Finish, by Area (Greater than 50 ft in length)50S.Y.$85.50$4,275.00 $91.25$4,562.50 $0.00 
6Patches, Full-Depth Finish, 6-inch, by Count, HMA4Each$39.00$156.00 $210.00$840.00 $0.00 
7Subbase (Patches)17.3C.Y.$87.85$1,519.805 $137.90$2,385.67 $0.00 
8Pavement Scarification13346.3S.Y.$6.80$90,754.84 $7.90$105,435.77 $0.00 
9Hot Mix Asphalt, Thin Lift Surface, 3/8 In. Mix740Tons$77.15$57,091.00 $96.60$71,484.00 $0.00 
10Hot Mix Asphalt Standard Traffic, Intermediate Course, 1/2"2947Tons$70.42$207,527.74 $78.00$229,866.00 $0.00 
11Asphalt Binder, PG 64-34E+60Tons$585.00$35,100.00 $744.00$44,640.00 $0.00 
12Asphalt Binder, PG 58-28S148Tons$425.00$62,900.00 $538.00$79,624.00 $0.00 
13Slurry Level0.3MI.$13,680.75$4,104.225 $50,000.00$15,000.00 $0.00 
14Surface Preparation-Slurry0.3MI.$17,589.59$5,276.877 $35,000.00$10,500.00 $0.00 
15Asphalt Emulsion-Slurry Level, Wedge, Treatment9GAL.$260.59$2,345.31 $5.00$45.00 $0.00 
16Granular Surface On Road, 1 1/4"350Tons$31.25$10,937.50 $31.25$10,937.50 $0.00 
17Granular Shoulder, Type B518Tons$27.54$14,265.72 $44.50$23,051.00 $0.00 
18Revetment, Class E84Tons$37.50$3,150.00 $37.50$3,150.00 $0.00 
19Culvert, Concrete Roadway Pipe, 18"40L.F.$135.75$5,430.00 $135.75$5,430.00 $0.00 
20Apron, Concrete, 18"1Each$1,975.00$1,975.00 $1,975.00$1,975.00 $0.00 
21Intake, SW-513, 3x31Each$4,335.00$4,335.00 $4,335.00$4,335.00 $0.00 
22Traffic Control1L.S.$2,000.00$2,000.00 $4,380.00$4,380.00 $0.00 
23Mobilization1L.S.$52,968.37$52,968.37 $37,000.00$37,000.00 $0.00 
      $796,910.367  $821,051.065  $0.00 
 



 

2/18/2026