Bids For: | Location: | Nishnabotna Wildlife Unit | Date: 12/12/2024 | Project No. |
2019 FLOOD DAMAGE REPAIRS PHASE 1 - VARIOUS ROADS | County: | FREMONT | Time: 11:00 a.m. | 22-04-36-01 |
1 | 2 | 3 | |||||||||||
Estimated Cost: $112,000.00 | Contractor: | Dovel Construction LLC | Hendrickson Transportation LLC | Western Iowa Utilities Inc | |||||||||
Funding Source: 75% Federal-FEMA 1, 25% Executive Council, | 1507 Argyle St | 2762 310th St | 20593 205th St | ||||||||||
Hamburg IA 51640 | Hamburg IA 51640 | Council Bluffs IA 51503 | |||||||||||
Plan Sets Requested: 0 | Quantities | 712-382-0024 | 712-382-1505 | 712-256-2222 | |||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309083 Riverton Site 2) | 56 | Tons | $46.00 | $2,576.00 | $56.42 | $3,159.52 | $56.25 | $3,150.00 | ||||
2 | Mobilization (#309083 Riverton) | 1 | L.S. | $500.00 | $500.00 | $171.45 | $171.45 | $811.00 | $811.00 | ||||
3 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309111 Bartlett I-29 Site 1) | 28 | Tons | $46.00 | $1,288.00 | $53.20 | $1,489.60 | $56.25 | $1,575.00 | ||||
4 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309111 Bartlett I-29 Site 3) | 56 | Tons | $46.00 | $2,576.00 | $55.77 | $3,123.12 | $56.25 | $3,150.00 | ||||
5 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309111 Bartlett I-29 Site 5) | 140 | Tons | $46.00 | $6,440.00 | $55.81 | $7,813.40 | $56.25 | $7,875.00 | ||||
6 | Mobilization (#309111 Bartlett I-29) | 1 | L.S. | $500.00 | $500.00 | $545.37 | $545.37 | $811.00 | $811.00 | ||||
7 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309113 Percival I-29) | 98 | Tons | $46.00 | $4,508.00 | $53.99 | $5,291.02 | $56.25 | $5,512.50 | ||||
8 | Mobilization (#309113 Percival I-29) | 1 | L.S. | $500.00 | $500.00 | $409.04 | $409.04 | $811.00 | $811.00 | ||||
9 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 1) | 28 | Tons | $46.00 | $1,288.00 | $51.86 | $1,452.08 | $56.25 | $1,575.00 | ||||
10 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 2) | 42 | Tons | $46.00 | $1,932.00 | $57.12 | $2,399.04 | $56.25 | $2,362.50 | ||||
11 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 2) | 56 | Tons | $46.00 | $2,576.00 | $59.75 | $3,346.00 | $56.25 | $3,150.00 | ||||
12 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 3) | 70 | Tons | $46.00 | $3,220.00 | $53.81 | $3,766.70 | $56.25 | $3,937.50 | ||||
13 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 3) | 98 | Tons | $46.00 | $4,508.00 | $53.93 | $5,285.14 | $56.25 | $5,512.50 | ||||
14 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 4) | 70 | Tons | $46.00 | $3,220.00 | $50.73 | $3,551.10 | $56.25 | $3,937.50 | ||||
15 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 4) | 98 | Tons | $46.00 | $4,508.00 | $51.99 | $5,095.02 | $56.25 | $5,512.50 | ||||
16 | Mobilization (#309115 Forney Lake) | 1 | L.S. | $500.00 | $500.00 | $1,605.88 | $1,605.88 | $1,311.00 | $1,311.00 | ||||
17 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 1) | 182 | Tons | $46.00 | $8,372.00 | $51.36 | $9,347.52 | $56.25 | $10,237.50 | ||||
18 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 1) | 280 | Tons | $46.00 | $12,880.00 | $50.46 | $14,128.80 | $56.25 | $15,750.00 | ||||
19 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 2) | 14 | Tons | $46.00 | $644.00 | $62.24 | $871.36 | $60.50 | $847.00 | ||||
20 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 2) | 14 | Tons | $46.00 | $644.00 | $62.31 | $872.34 | $60.50 | $847.00 | ||||
21 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 3) | 14 | Tons | $46.00 | $644.00 | $62.31 | $872.34 | $56.25 | $787.50 | ||||
22 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 4) | 28 | Tons | $46.00 | $1,288.00 | $63.72 | $1,784.16 | $56.25 | $1,575.00 | ||||
23 | Subbase Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 2) | 14 | Tons | $46.00 | $644.00 | $62.31 | $872.34 | $56.25 | $787.50 | ||||
24 | Earthwork, Fill Hauled and Placed, Unclassified (#309116 McPaul I-29 Site 2) | 18.6 | C.Y. | $50.00 | $930.00 | $46.71 | $868.806 | $28.50 | $530.10 | ||||
25 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 5) | 42 | Tons | $46.00 | $1,932.00 | $59.20 | $2,486.40 | $56.25 | $2,362.50 | ||||
26 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 5) | 70 | Tons | $46.00 | $3,220.00 | $50.73 | $3,551.10 | $56.25 | $3,937.50 | ||||
27 | Mobilization (#309116 McPaul I-29) | 1 | L.S. | $500.00 | $500.00 | $834.35 | $834.35 | $1,680.00 | $1,680.00 | ||||
28 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309117 Scott I-29 Site 1) | 266 | Tons | $46.00 | $12,236.00 | $51.50 | $13,699.00 | $56.25 | $14,962.50 | ||||
29 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309117 Scott I-29 Site 1) | 406 | Tons | $46.00 | $18,676.00 | $51.14 | $20,762.84 | $56.25 | $22,837.50 | ||||
30 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309117 Scott I-29 Site 2) | 14 | Tons | $46.00 | $644.00 | $62.24 | $871.36 | $56.25 | $787.50 | ||||
31 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309117 Scott I-29 Site 2) | 14 | Tons | $46.00 | $644.00 | $62.24 | $871.36 | $56.25 | $787.50 | ||||
32 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309117 Scott I-29 Site 3) | 42 | Tons | $46.00 | $1,932.00 | $59.20 | $2,486.40 | $56.25 | $2,362.50 | ||||
33 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309117 Scott I-29 Site 3) | 56 | Tons | $46.00 | $2,576.00 | $62.28 | $3,487.68 | $56.25 | $3,150.00 | ||||
34 | Mobilization (#309117 Scott I-29) | 1 | L.S. | $500.00 | $500.00 | $1,674.92 | $1,674.92 | $1,311.00 | $1,311.00 | ||||
35 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 1) | 14 | Tons | $46.00 | $644.00 | $62.24 | $871.36 | $56.25 | $787.50 | ||||
36 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 1) | 14 | Tons | $46.00 | $644.00 | $62.31 | $872.34 | $56.25 | $787.50 | ||||
37 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 2) | 42 | Tons | $46.00 | $1,932.00 | $59.20 | $2,486.40 | $56.25 | $2,362.50 | ||||
38 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 2) | 70 | Tons | $46.00 | $3,220.00 | $51.53 | $3,607.10 | $56.25 | $3,937.50 | ||||
39 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 3) | 42 | Tons | $46.00 | $1,932.00 | $59.20 | $2,486.40 | $56.25 | $2,362.50 | ||||
40 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 3) | 56 | Tons | $46.00 | $2,576.00 | $61.97 | $3,470.32 | $56.25 | $3,150.00 | ||||
41 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 4) | 14 | Tons | $46.00 | $644.00 | $62.31 | $872.34 | $56.25 | $787.50 | ||||
42 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 4) | 28 | Tons | $46.00 | $1,288.00 | $53.42 | $1,495.76 | $56.25 | $1,575.00 | ||||
43 | Mobilization (#309118 Waubonsie Access) | 1 | L.S. | $500.00 | $500.00 | $682.50 | $682.50 | $811.00 | $811.00 | ||||
$122,926.00 | $145,691.076 | $153,095.10 | |||||||||||
4 | 5 | 6 | |||||||||||
Estimated Cost: $112,000.00 | Contractor: | Reilly Construction Co Inc | |||||||||||
Funding Source: 75% Federal-FEMA 1, 25% Executive Council, | PO Box 99 | ||||||||||||
Ossian IA 52161 | |||||||||||||
Plan Sets Requested: 0 | Quantities | 563-532-9211 | |||||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309083 Riverton Site 2) | 56 | Tons | $50.00 | $2,800.00 | $0.00 | $0.00 | ||||||
2 | Mobilization (#309083 Riverton) | 1 | L.S. | $10,000.00 | $10,000.00 | $0.00 | $0.00 | ||||||
3 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309111 Bartlett I-29 Site 1) | 28 | Tons | $45.00 | $1,260.00 | $0.00 | $0.00 | ||||||
4 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309111 Bartlett I-29 Site 3) | 56 | Tons | $45.00 | $2,520.00 | $0.00 | $0.00 | ||||||
5 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309111 Bartlett I-29 Site 5) | 140 | Tons | $45.00 | $6,300.00 | $0.00 | $0.00 | ||||||
6 | Mobilization (#309111 Bartlett I-29) | 1 | L.S. | $10,000.00 | $10,000.00 | $0.00 | $0.00 | ||||||
7 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309113 Percival I-29) | 98 | Tons | $50.00 | $4,900.00 | $0.00 | $0.00 | ||||||
8 | Mobilization (#309113 Percival I-29) | 1 | L.S. | $10,000.00 | $10,000.00 | $0.00 | $0.00 | ||||||
9 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 1) | 28 | Tons | $50.00 | $1,400.00 | $0.00 | $0.00 | ||||||
10 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 2) | 42 | Tons | $50.00 | $2,100.00 | $0.00 | $0.00 | ||||||
11 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 2) | 56 | Tons | $50.00 | $2,800.00 | $0.00 | $0.00 | ||||||
12 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 3) | 70 | Tons | $50.00 | $3,500.00 | $0.00 | $0.00 | ||||||
13 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 3) | 98 | Tons | $50.00 | $4,900.00 | $0.00 | $0.00 | ||||||
14 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 4) | 70 | Tons | $50.00 | $3,500.00 | $0.00 | $0.00 | ||||||
15 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309115 Forney Lake Site 4) | 98 | Tons | $50.00 | $4,900.00 | $0.00 | $0.00 | ||||||
16 | Mobilization (#309115 Forney Lake) | 1 | L.S. | $10,000.00 | $10,000.00 | $0.00 | $0.00 | ||||||
17 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 1) | 182 | Tons | $48.00 | $8,736.00 | $0.00 | $0.00 | ||||||
18 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 1) | 280 | Tons | $48.00 | $13,440.00 | $0.00 | $0.00 | ||||||
19 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 2) | 14 | Tons | $48.00 | $672.00 | $0.00 | $0.00 | ||||||
20 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 2) | 14 | Tons | $48.00 | $672.00 | $0.00 | $0.00 | ||||||
21 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 3) | 14 | Tons | $48.00 | $672.00 | $0.00 | $0.00 | ||||||
22 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 4) | 28 | Tons | $48.00 | $1,344.00 | $0.00 | $0.00 | ||||||
23 | Subbase Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 2) | 14 | Tons | $48.00 | $672.00 | $0.00 | $0.00 | ||||||
24 | Earthwork, Fill Hauled and Placed, Unclassified (#309116 McPaul I-29 Site 2) | 18.6 | C.Y. | $50.00 | $930.00 | $0.00 | $0.00 | ||||||
25 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 5) | 42 | Tons | $48.00 | $2,016.00 | $0.00 | $0.00 | ||||||
26 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309116 McPaul I-29 Site 5) | 70 | Tons | $48.00 | $3,360.00 | $0.00 | $0.00 | ||||||
27 | Mobilization (#309116 McPaul I-29) | 1 | L.S. | $10,000.00 | $10,000.00 | $0.00 | $0.00 | ||||||
28 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309117 Scott I-29 Site 1) | 266 | Tons | $48.00 | $12,768.00 | $0.00 | $0.00 | ||||||
29 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309117 Scott I-29 Site 1) | 406 | Tons | $48.00 | $19,488.00 | $0.00 | $0.00 | ||||||
30 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309117 Scott I-29 Site 2) | 14 | Tons | $48.00 | $672.00 | $0.00 | $0.00 | ||||||
31 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309117 Scott I-29 Site 2) | 14 | Tons | $48.00 | $672.00 | $0.00 | $0.00 | ||||||
32 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309117 Scott I-29 Site 3) | 42 | Tons | $48.00 | $2,016.00 | $0.00 | $0.00 | ||||||
33 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309117 Scott I-29 Site 3) | 56 | Tons | $48.00 | $2,688.00 | $0.00 | $0.00 | ||||||
34 | Mobilization (#309117 Scott I-29) | 1 | L.S. | $10,000.00 | $10,000.00 | $0.00 | $0.00 | ||||||
35 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 1) | 14 | Tons | $55.00 | $770.00 | $0.00 | $0.00 | ||||||
36 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 1) | 14 | Tons | $55.00 | $770.00 | $0.00 | $0.00 | ||||||
37 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 2) | 42 | Tons | $55.00 | $2,310.00 | $0.00 | $0.00 | ||||||
38 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 2) | 70 | Tons | $55.00 | $3,850.00 | $0.00 | $0.00 | ||||||
39 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 3) | 42 | Tons | $55.00 | $2,310.00 | $0.00 | $0.00 | ||||||
40 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 3) | 56 | Tons | $55.00 | $3,080.00 | $0.00 | $0.00 | ||||||
41 | Granular Surfacing Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 4) | 14 | Tons | $55.00 | $770.00 | $0.00 | $0.00 | ||||||
42 | Base Hauled and Placed, 1 1/2" Crushed Stone (#309118 Waubonsie Access Site 4) | 28 | Tons | $55.00 | $1,540.00 | $0.00 | $0.00 | ||||||
43 | Mobilization (#309118 Waubonsie Access) | 1 | L.S. | $10,000.00 | $10,000.00 | $0.00 | $0.00 | ||||||
$197,098.00 | $0.00 | $0.00 | |||||||||||